+
Bengaluru Metro Ridership Drops 6% After Fare Hike
RAILWAYS & METRO RAIL

Bengaluru Metro Ridership Drops 6% After Fare Hike

Bengaluru’s Namma Metro witnessed a 6% drop in ridership after implementing a fare hike, with the footfall standing at 828,149. This decline is sharper than the 1-2% fall anticipated by the Bangalore Metro Rail Corporation Limited (BMRCL).

Despite the drop, BMRCL expects to generate an additional $660,000 to $720,000 (Rs 55-60 lakh) per day from the fare revision. However, commuters have expressed dissatisfaction, calling the hike excessive and burdensome.

A look at previous ridership numbers highlights the decline:

January 6: 8,61,593

January 13: 7,84,539 (eve of Makara Sankranti)

January 20: 8,79,537

January 27: 9,09,756

February 3: 8,70,147

Metro Now Among the Most Expensive in India? BJP MP Tejasvi Surya raised concerns over the fare hike in Lok Sabha, criticizing the near doubling of fares at several stations. He argued that the price increase contradicts the metro’s goal of providing an affordable and sustainable transit system.

Under the new structure, the maximum fare has jumped from Rs 60 to ?90, while the minimum balance on smart cards has increased from Rs 50 to ?90. The revised ticket prices range from Rs 10 for up to 2 km to Rs 90 for distances beyond 25 km.

With Bengaluru’s metro being a key mode of transport for daily commuters, the coming weeks will determine whether ridership stabilizes or if the fare hike has a lasting impact.

Bengaluru’s Namma Metro witnessed a 6% drop in ridership after implementing a fare hike, with the footfall standing at 828,149. This decline is sharper than the 1-2% fall anticipated by the Bangalore Metro Rail Corporation Limited (BMRCL). Despite the drop, BMRCL expects to generate an additional $660,000 to $720,000 (Rs 55-60 lakh) per day from the fare revision. However, commuters have expressed dissatisfaction, calling the hike excessive and burdensome. A look at previous ridership numbers highlights the decline: January 6: 8,61,593 January 13: 7,84,539 (eve of Makara Sankranti) January 20: 8,79,537 January 27: 9,09,756 February 3: 8,70,147 Metro Now Among the Most Expensive in India? BJP MP Tejasvi Surya raised concerns over the fare hike in Lok Sabha, criticizing the near doubling of fares at several stations. He argued that the price increase contradicts the metro’s goal of providing an affordable and sustainable transit system. Under the new structure, the maximum fare has jumped from Rs 60 to ?90, while the minimum balance on smart cards has increased from Rs 50 to ?90. The revised ticket prices range from Rs 10 for up to 2 km to Rs 90 for distances beyond 25 km. With Bengaluru’s metro being a key mode of transport for daily commuters, the coming weeks will determine whether ridership stabilizes or if the fare hike has a lasting impact.

Next Story
Infrastructure Transport

MMRDA Installs 325-Tonne Steel Spans on Mumbai Metro Line 4

The Mumbai Metropolitan Region Development Authority (MMRDA) has achieved a key construction milestone on Metro Line 4 with the successful installation of three large steel spans at Bhandup West during overnight operations.The spans, together weighing 325 metric tonnes, were launched using eight heavy-duty cranes and 12 multi-axle vehicles. The operation required precise engineering and meticulous planning to minimise disruption in the densely populated suburban area.Due to effective inter-agency coordination, the work—originally scheduled across four nights—was completed within just two n..

Next Story
Infrastructure Transport

CMRL Targets March 2027 Opening for Vadapalani–Panagal Park

Chennai Metro Rail Limited (CMRL) is progressing as scheduled to open the Vadapalani–Panagal Park section of Phase II’s Corridor 4 by March 2027. The 3.5 km underground stretch is part of the 26.1 km Corridor 4 connecting Lighthouse with Poonamallee Bypass.Construction activities are advancing steadily, with tunnelling works between Vadapalani and Panagal Park already completed. Track-laying operations are expected to commence shortly. At Panagal Park station, structural works have reached the concourse and platform levels, while excavation continues at the lowest level.CMRL is also consid..

Next Story
Infrastructure Transport

Maha-Metro Invites Pune Metro Civil Maintenance Bids

Maharashtra Metro Rail Corporation Limited (Maha-Metro) has invited bids for the annual civil maintenance contract of the Pune Metro Rail Project. The tender, bearing ID and number P1-O&M-20/2025, is scheduled to close on 23 February 2026, with a pre-bid meeting slated for 10 February 2026. The earnest money deposit (EMD) for the contract is Rs 3,50,500, and the duration of the contract is one year.The scope of work includes annual civil maintenance of 28 elevated and underground stations, 28.079 km of elevated viaduct including steel bridges, 12.15 km of tunnels, and two depots under the ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App