Exchange-Rate Losses Push Namma Metro Finance Costs Above Revenue
RAILWAYS & METRO RAIL

Exchange-Rate Losses Push Namma Metro Finance Costs Above Revenue

Bengaluru’s Namma Metro operator, Bangalore Metro Rail Corporation (BMRCL), saw its finance costs rise by nearly 220 per cent in 2025-26, with exchange-rate variation accounting for much of the increase. The expense rose from Rs. 2.64 bn in 2024-25 to Rs. 14.44 bn in 2025-26, according to data reviewed by Deccan Herald.

For the first time since 2019-20, BMRCL’s finance costs on foreign loans exceeded its total revenue. Revenue from fares, non-fare activities and other sources stood at Rs. 16.25 bn, while finance costs reached Rs. 17.93 bn. Finance costs include interest, loan fees and foreign exchange losses, but exclude repayment of principal.

BMRCL relies heavily on foreign loans because metro construction is capital-intensive. The Government of India releases these loans as Pass-Through Assistance, but BMRCL remains responsible for repaying them. If operating revenue does not cover expenditure, the Karnataka government provides support. Rising energy costs and pay revisions, along with higher borrowing costs, could increase pressure on the corporation, while failure to implement the 5 per cent fare increase due in February 2027 may result in an operational loss.

Foreign-loan interest liabilities are recorded using the exchange rate on March 31 each year, while the effective rate is determined when payments are made. The rupee’s decline against the euro and dollar therefore increased the effective borrowing cost. As more metro lines open, related loans are transferred from Interest During Construction to the Profit and Loss statement.

Karnataka has asked the Centre to share BMRCL’s exchange-rate variation and cash losses, as it does for Delhi Metro, and to assist with hedging. The state estimates its contribution to the approved Phase 3 project cost at Rs. 652.91 bn, against Rs. 126 bn from the Centre, while BJP MP L S Tejasvi Surya puts the respective shares at Rs. 363.33 bn and Rs. 415.58 bn. BMRCL’s outstanding loans are expected to reach Rs. 560.87 bn by March 2028. Non-fare revenue increased from Rs. 549.7 mn to Rs. 885.1 mn and may cross Rs. 1 bn in 2026-27.

Bengaluru’s Namma Metro operator, Bangalore Metro Rail Corporation (BMRCL), saw its finance costs rise by nearly 220 per cent in 2025-26, with exchange-rate variation accounting for much of the increase. The expense rose from Rs. 2.64 bn in 2024-25 to Rs. 14.44 bn in 2025-26, according to data reviewed by Deccan Herald. For the first time since 2019-20, BMRCL’s finance costs on foreign loans exceeded its total revenue. Revenue from fares, non-fare activities and other sources stood at Rs. 16.25 bn, while finance costs reached Rs. 17.93 bn. Finance costs include interest, loan fees and foreign exchange losses, but exclude repayment of principal. BMRCL relies heavily on foreign loans because metro construction is capital-intensive. The Government of India releases these loans as Pass-Through Assistance, but BMRCL remains responsible for repaying them. If operating revenue does not cover expenditure, the Karnataka government provides support. Rising energy costs and pay revisions, along with higher borrowing costs, could increase pressure on the corporation, while failure to implement the 5 per cent fare increase due in February 2027 may result in an operational loss. Foreign-loan interest liabilities are recorded using the exchange rate on March 31 each year, while the effective rate is determined when payments are made. The rupee’s decline against the euro and dollar therefore increased the effective borrowing cost. As more metro lines open, related loans are transferred from Interest During Construction to the Profit and Loss statement. Karnataka has asked the Centre to share BMRCL’s exchange-rate variation and cash losses, as it does for Delhi Metro, and to assist with hedging. The state estimates its contribution to the approved Phase 3 project cost at Rs. 652.91 bn, against Rs. 126 bn from the Centre, while BJP MP L S Tejasvi Surya puts the respective shares at Rs. 363.33 bn and Rs. 415.58 bn. BMRCL’s outstanding loans are expected to reach Rs. 560.87 bn by March 2028. Non-fare revenue increased from Rs. 549.7 mn to Rs. 885.1 mn and may cross Rs. 1 bn in 2026-27.

Related Stories

Gold Stories

Next Story
Real Estate

Concorde signs JDA for residential project in North Bengaluru

Bengaluru-based real estate developer Concorde has signed a Joint Development Agreement (JDA) for a premium residential project on a 3-acre land parcel in North Bengaluru. The development has an estimated potential of 400,000 sq ft and a Gross Development Value (GDV) of ₹4.5 billion.The project will add to Concorde's residential portfolio, with a focus on contemporary architecture, construction quality and lifestyle amenities.Commenting on the development, Anil RG, Managing Director, Concorde, said, “North Bengaluru is emerging as a significant growth destination, and this development mark..

Next Story
Real Estate

Alliance City Hands Over Alliance Eternis in Borivali West

"Alliance City Developers Realtors recently announced the completion and formal handover of Alliance Eternis, its boutique residential tower at Dattani Nagar, SV Road, Borivali West, Mumbai. The development received its full Occupation Certificate (OC) and was officially handed over to the housing society on 31 October 2026.The full OC confirms that the entire 14-storey residential tower has been completed in accordance with approved plans and cleared by the municipal authority for occupation, marking its transition to society management.The handover follows a series of project delivery milest..

Next Story
Equipment

John Crane invests over $5 million in Pune centre

John Crane, a global provider of flow control technologies and a business of Smiths Group plc, has invested more than $5 million in a new engineering and business services centre in Pune. Officially inaugurated by John Crane President Ruben Alvarez, the centre has capacity for around 400 people.John Crane has operated in India for more than 30 years and employs over 700 people in the country, serving customers across the energy and process industries, including oil and gas, chemicals, fertilisers, pharmaceuticals and power generation. The company also operates manufacturing and service facilit..

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code