Maha Metro issues Rs 10 bn tender for Nagpur Metro Ph-II Infra
RAILWAYS & METRO RAIL

Maha Metro issues Rs 10 bn tender for Nagpur Metro Ph-II Infra

The Maharashtra Metro Rail Corporation has released a tender for the construction of an elevated Metro viaduct and a road bridge in Reach-1A of the Nagpur Metro Rail Project (NMRP) Phase-II.

The project encompasses the construction of a Metro viaduct spanning 17.624 km from ch.21256.814 to ch.38881.7, including railway spans measuring 79 meters and 100 meters. Additionally, it involves the development of a six-lane double-decker road bridge/flyover extending over 1.027 km on the national highway, supported by integrated piers located between ch.22873.8 to ch.23900.777, all within Reach-1A of Nagpur Metro Rail Project (NMRP) Phase-II. The contract is valued at Rs 10 billion.

Interested parties must submit their bids by the closing date of 08 February 2024.

The Maharashtra Metro Rail Corporation has released a tender for the construction of an elevated Metro viaduct and a road bridge in Reach-1A of the Nagpur Metro Rail Project (NMRP) Phase-II. The project encompasses the construction of a Metro viaduct spanning 17.624 km from ch.21256.814 to ch.38881.7, including railway spans measuring 79 meters and 100 meters. Additionally, it involves the development of a six-lane double-decker road bridge/flyover extending over 1.027 km on the national highway, supported by integrated piers located between ch.22873.8 to ch.23900.777, all within Reach-1A of Nagpur Metro Rail Project (NMRP) Phase-II. The contract is valued at Rs 10 billion. Interested parties must submit their bids by the closing date of 08 February 2024.

Next Story
Infrastructure Urban

PTC Industries and BDL Form JV for Missile and UAV Propulsion

PTC Industries, a leading manufacturer of high-performance materials and precision-engineered components for Defence and Aerospace, has signed a Memorandum of Understanding (MoU) with Bharat Dynamics (BDL) to establish a Joint Venture (JV) for the design, development, and manufacture of propulsion systems, aero-engines, guided bombs, and loitering munitions for missiles and UAVs, subject to regulatory approvals.The MoU was exchanged during the Lokarpan Ceremony of PTC’s Titanium & Superalloys Materials Plant at the Strategic Materials Technology Complex (SMTC), Lucknow, in the presence o..

Next Story
Infrastructure Urban

J&K Bank Reports H1 Net Profit of Rs 9.79 Bn, Q2 at Rs 4.94 Bn

J&K Bank announced a net profit of Rs 4.94 billion for the July–September quarter (Q2) of the current financial year (CFY), bringing its half-year (H1) net profit to Rs 9.78 billion, up from Rs 9.66 billion in H1 last fiscal. The results were approved by the Bank’s Board of Directors at a meeting held at its Corporate Headquarters.The Q2 performance was moderated by Rs 920 million provisioning towards its investment in Jammu and Kashmir Grameen Bank following the amalgamation of Ellaquai Dehati Bank under the “One State, One RRB” initiative. Total provisioning for H1 stands at Rs 1..

Next Story
Building Material

Tata Steel, Air Water India Ink 20-Year Deal for Jamshedpur ASU

Tata Steel has signed a 20-year agreement with Air Water India Private Limited (AWIPL) to operate and maintain its advanced Air Separation Unit (ASU) in Jamshedpur. The partnership aims to boost Tata Steel’s industrial gas infrastructure and improve efficiency through the use of cutting-edge cryogenic technologies. The agreement was signed between Peeyush Gupta, Vice President (TQM, GSP & SC), Tata Steel, and Kausik Mukhopadhyay, Managing Director, AWIPL. Under the contract, AWIPL will manage operations of the ASU, which can produce 1,800 tonnes of oxygen per day, along with nitrogen, argon..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?