BMC’s Rs 20 bn megaproject to transform Mithi River
WATER & WASTE

BMC’s Rs 20 bn megaproject to transform Mithi River

The BrihanMumbai Municipal Corporation (BMC) has launched a massive Rs 20 billion project stretched over a period of four years to overhaul the 17.8 km-long Mithi river.

The main goals of the massive construction projects are to stop the Mithi from overflowing during heavy rains, enter its low-lying surroundings like Sion, Chunabhatti, Kurla, and Ghatkopar, and improve the banks' aesthetics.

The initiative, entitled the "Mithi River Water Quality Improvement Project," officially began on October 1. BMC will put 26 floodgates in the river, which originates at Vihar Lake and joins the Arabian Sea at the Mahim Causeway, in accordance with the plan's concept.
The installation of sluices, estimated at Rs 10.3 billion, is intended to stop the seasonal flooding of localities including Kranti Nagar, Bail Bazaar, and Taximen's Colony.

The BrihanMumbai Municipal Corporation (BMC) has launched a massive Rs 20 billion project stretched over a period of four years to overhaul the 17.8 km-long Mithi river.The main goals of the massive construction projects are to stop the Mithi from overflowing during heavy rains, enter its low-lying surroundings like Sion, Chunabhatti, Kurla, and Ghatkopar, and improve the banks' aesthetics.The initiative, entitled the Mithi River Water Quality Improvement Project, officially began on October 1. BMC will put 26 floodgates in the river, which originates at Vihar Lake and joins the Arabian Sea at the Mahim Causeway, in accordance with the plan's concept.The installation of sluices, estimated at Rs 10.3 billion, is intended to stop the seasonal flooding of localities including Kranti Nagar, Bail Bazaar, and Taximen's Colony.

Next Story
Infrastructure Urban

Concord Control Systems Limited Reports ~85% YoY Growth in H1 FY26

Concord Control Systems Limited (BSE: CNCRD | 543619), India’s leading manufacturer of embedded electronic systems and critical electronic solutions, announced its unaudited financial results for the half year ended September 30, 2025.Financial Highlights – H1 FY26 (YoY Comparison)Revenue from Operations rose to ₹815.45 million, up from ₹497.53 million in H1 FY25, marking a 63.90% year-on-year growth.EBITDA increased to ₹217.34 million, compared to ₹142 million in the same period last year.EBITDA Margin stood at 26.65%, compared to 28.54% in H1 FY25, with the decline attributed to ..

Next Story
Infrastructure Urban

Gateway Distriparks Announces Q2 FY25 Results

Gateway Distriparks Limited (GDL), one of India’s leading multimodal logistics providers, announced its financial results for the quarter ended 30 September 2025.For Q2, the company reported total revenue of INR 154.8 crore (H1: INR 316.9 crore), EBITDA of INR 20.56 crore (H1: INR 45.65 crore), PBT of INR –4.23 crore (H1: INR –0.28 crore), and PAT of INR –2.91 crore (H1: INR –0.37 crore). The company stated that these numbers reflect the consolidation of accounts following Snowman Logistics transitioning from an associate company to a subsidiary in December 2024.Commenting on the per..

Next Story
Infrastructure Transport

Last-Mile Connectivity a Prime Focus, Says Ms. Ashwini Bhide,

The IMC Chamber of Commerce and Industry (IMC) hosted a high-impact Managing Committee session today on the theme “Mumbai Metro: Transforming Connectivity and Commuting.” The session featured an insightful address by Ms. Ashwini Bhide, Managing Director, Mumbai Metro Rail Corporation Ltd. (MMRCL), who shared updates on key transport infrastructure developments across Mumbai and the MMR region.Emphasising the city’s critical economic role, Ms. Bhide noted, “Mumbai is the economic powerhouse of Maharashtra, with more than 95% of the region’s population living in urban areas. As Maharas..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement