DDWS Hosts Greywater Workshop
WATER & WASTE

DDWS Hosts Greywater Workshop


The Department of Drinking Water and Sanitation (DDWS), Ministry of Jal Shakti, organised a virtual workshop on “Greywater Management and Reuse” as part of preparatory sessions for the upcoming Sujalam Bharat Summit, scheduled for the end of November under the chairmanship of Union Minister C R Patil.

The Sujalam Bharat Summit is one of six departmental summits conceptualised under the guidance of Prime Minister Narendra Modi, aimed at incorporating grassroots perspectives into national policy. Coordinated by NITI Aayog and anchored by the Ministry of Jal Shakti, the summits seek to strengthen the feedback loop between national missions and field-level implementation to ensure effective, locally responsive strategies.

The workshop was chaired by Kamal Kishore Soan, ASMD (SBMG & JJM), and attended by Archana Varma, ASMD-NWM, Secretary DDWS Ashok K K Meena, State Nodal Officers, sector experts, and representatives from development partners. In her opening remarks, Smt. Varma highlighted the importance of greywater management, noting that proper reuse can save up to 30–40 per cent of water.

Soan underlined the critical role of greywater systems in the context of the Jal Jeevan Mission, emphasising solutions that are climate-resilient, technically sound, and adaptable to local community needs. The workshop provided a platform for mid-level officers, scientists, and practitioners to share insights and contribute to national and state-level water and sanitation strategies.


News source: PIB

The Department of Drinking Water and Sanitation (DDWS), Ministry of Jal Shakti, organised a virtual workshop on “Greywater Management and Reuse” as part of preparatory sessions for the upcoming Sujalam Bharat Summit, scheduled for the end of November under the chairmanship of Union Minister C R Patil.The Sujalam Bharat Summit is one of six departmental summits conceptualised under the guidance of Prime Minister Narendra Modi, aimed at incorporating grassroots perspectives into national policy. Coordinated by NITI Aayog and anchored by the Ministry of Jal Shakti, the summits seek to strengthen the feedback loop between national missions and field-level implementation to ensure effective, locally responsive strategies.The workshop was chaired by Kamal Kishore Soan, ASMD (SBMG & JJM), and attended by Archana Varma, ASMD-NWM, Secretary DDWS Ashok K K Meena, State Nodal Officers, sector experts, and representatives from development partners. In her opening remarks, Smt. Varma highlighted the importance of greywater management, noting that proper reuse can save up to 30–40 per cent of water.Soan underlined the critical role of greywater systems in the context of the Jal Jeevan Mission, emphasising solutions that are climate-resilient, technically sound, and adaptable to local community needs. The workshop provided a platform for mid-level officers, scientists, and practitioners to share insights and contribute to national and state-level water and sanitation strategies.News source: PIB

Next Story
Infrastructure Transport

BMC Gets CRZ Nod For Rs 40 Million Gorai Bridge Rebuild

The Brihanmumbai Municipal Corporation (BMC) has secured Coastal Regulation Zone (CRZ) clearance for the reconstruction of the Poisar River bridge in Gorai, located in Mumbai’s western suburbs. However, the proposed demolition of the existing 100-metre bridge has sparked opposition from local residents, who claim it serves as the only direct access route between the Lower and Upper Koliwada areas. The three-decade-old bridge, situated within the CRZ buffer zone, was recently declared structurally unsafe following a civic audit. The BMC has sanctioned its reconstruction at an estimated cost ..

Next Story
Infrastructure Transport

NHAI Completes Rs 15.9 Billion Four-Lane Stretch On ECR

The National Highways Authority of India (NHAI) has completed the four-laning of the 38 km Puducherry–Poondiyankuppam stretch, ending near Cuddalore, in a development that will cut travel time by up to two hours, according to a report by The New Indian Express. The upgraded section, built at a cost of Rs 15.9 billion under the Bharatmala Pariyojana Phase I, marks a major milestone in the ongoing East Coast Road (ECR) widening programme. The project promises a smoother, faster drive for motorists travelling towards Cuddalore, Chidambaram, Sirkazhi, and Nagapattinam. With this completion, 22..

Next Story
Infrastructure Transport

Encroachments Delay Rs 1 Billion Ghatkopar Bridge Project

The construction of a new cable-stayed rail overbridge at Ghatkopar and the widening of the Andheri–Ghatkopar Link Road (AGLR) have been delayed due to the presence of nearly 250 encroached structures on both sides of the road. In response, Municipal Commissioner Bhushan Gagrani has directed officials to carry out a structural audit of the existing bridge over the railway line and enforce temporary restrictions on heavy vehicles to ensure public safety. The bridge, which starts at the Golibar Road junction near LBS Marg and extends up to the Eastern Express Highway (EEH), serves as a critic..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?