PMC Approves Rs 5.78 bn Waste Processing Contract
WATER & WASTE

PMC Approves Rs 5.78 bn Waste Processing Contract

The Pune Municipal Corporation approved a Rs 5.7796 billion (bn) fifteen-year contract to process 500 metric tonnes (t) of waste daily at the Devachi Uruli depot and allowed unauthorised overhead cables to remain temporarily for one year subject to a fee. The decision was taken by the civic body to appoint a private operator for an integrated waste facility covering about 12 acres. The approval frames the contract as an operational arrangement with a fixed base rate and annual adjustments.

The contract was awarded to Bhoomi Green Energy Envirocare LLP, which quoted Rs 772 per t, compared with a Rs 1,045 per t bid from Antony Lara Enviro Solutions Private Limited. The proposed facility will handle 300 t of wet waste and 200 t of dry waste daily and will include operation and maintenance responsibilities for the full term, with a clause allowing an extension of a further five years. The quoted rate will increase by seven per cent annually under the contract terms.

Under the new temporary overhead cable policy, telecom companies will pay Rs 0.3 mn per kilometre annually while internet and broadband firms will pay Rs 0.1 mn per kilometre, and operators will have one year to shift networks underground. The corporation will conduct a joint survey and GIS mapping of overhead cables and will require visible labelling with the service provider’s name, a 24-hour emergency contact number and a permission or QR number together with mandated colour coding. Unused cables must be removed and non-compliant networks may face cancellation of permission and civic action.

The policy also proposes a penalty of Rs 2,000 per metre for unauthorised overhead cables. The standing committee chairman Shrinath Bhimale indicated that underground cabling would improve safety and reduce visual clutter and noted that around 500 kilometre of cable-related excavation is currently under way while the corporation is planning a 750-kilometre civic internet network. Officials expect the measures to streamline city infrastructure and accelerate network upgrades.

The Pune Municipal Corporation approved a Rs 5.7796 billion (bn) fifteen-year contract to process 500 metric tonnes (t) of waste daily at the Devachi Uruli depot and allowed unauthorised overhead cables to remain temporarily for one year subject to a fee. The decision was taken by the civic body to appoint a private operator for an integrated waste facility covering about 12 acres. The approval frames the contract as an operational arrangement with a fixed base rate and annual adjustments. The contract was awarded to Bhoomi Green Energy Envirocare LLP, which quoted Rs 772 per t, compared with a Rs 1,045 per t bid from Antony Lara Enviro Solutions Private Limited. The proposed facility will handle 300 t of wet waste and 200 t of dry waste daily and will include operation and maintenance responsibilities for the full term, with a clause allowing an extension of a further five years. The quoted rate will increase by seven per cent annually under the contract terms. Under the new temporary overhead cable policy, telecom companies will pay Rs 0.3 mn per kilometre annually while internet and broadband firms will pay Rs 0.1 mn per kilometre, and operators will have one year to shift networks underground. The corporation will conduct a joint survey and GIS mapping of overhead cables and will require visible labelling with the service provider’s name, a 24-hour emergency contact number and a permission or QR number together with mandated colour coding. Unused cables must be removed and non-compliant networks may face cancellation of permission and civic action. The policy also proposes a penalty of Rs 2,000 per metre for unauthorised overhead cables. The standing committee chairman Shrinath Bhimale indicated that underground cabling would improve safety and reduce visual clutter and noted that around 500 kilometre of cable-related excavation is currently under way while the corporation is planning a 750-kilometre civic internet network. Officials expect the measures to streamline city infrastructure and accelerate network upgrades.

Related Stories

Gold Stories

Next Story
Resources

Schindler named among Forbes’ World’s Best Employers 2026

Schindler has been named among Forbes’ World’s Best Employers 2026, a global ranking recognising companies for their workplace environments.Compiled by Forbes in partnership with Statista, the ranking is based on independent employee feedback, including whether employees would recommend their organisation to friends and family.The company said the recognition reflected its focus on creating a workplace where employees can develop their expertise and build careers. ..

Next Story
Infrastructure Urban

India needs an export-execution mindset: Vishesh Jain

Interview with Vishesh Jain, Founder & CEO, EximpleWhat gaps in India’s global trade ecosystem led you to build Eximple, and what problem did you see businesses struggling with most?Eximple came out of a problem that all three founders had seen from different choke points in the trade ecosystem. India has millions of MSMEs and manufacturers, and many of them can make products that are genuinely competitive on quality. Yet only a small fraction is able to build meaningful international businesses. In our experience, the gap is usually not manufacturing capability; it is the ability to exe..

Next Story
Building Material

Nuvoco reports 13.5% revenue growth in Q2 FY27

Nuvoco Vistas Corp. Ltd. reported consolidated revenue of Rs 27.9 billion for Q2 FY27, up 13.5% year on year. Cement sales volume rose 9% to 4.7 million tonnes (MMT), while EBITDA increased 11% to Rs 4.11 billion.The company said it began its cement operations in 2014 with a 2.3 MMT per annum (MMTPA) operation at Nimbol. It now aims to reach 35 MMTPA of cement capacity by FY28, nearly 15 times its initial capacity. Its portfolio spans cement, ready-mix concrete and modern building materials.On sustainability and cost efficiency, Nuvoco partnered with CleanMax for a 46.4 MW wind-solar hybrid re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code