Why are buildings not protected from fire outbreaks?
Real Estate

Why are buildings not protected from fire outbreaks?

Among the most recent reports, 20 students were killed and several injured after a major fire broke out – triggered by a short circuit – at a coaching centre in Sarthana area of Surat. According to India Risk Survey (IRS) 2018, as reported, fire outbreak is the third biggest risk to business continuity and operations. “The recommendations for construction of low-rise and high-rise structures should be properly followed,” says Dr Pramod Kumar Gupta, Professor, Structural Engineering, Department of Civil Engineering, IIT-Roorkee, adding that, in most cases, basic recommendations are not followed. “The used material should meet the specified requirement of fire resistance. A new version of IS 456 specifically covers different structural elements as per fire resistance.”

Consider this: In Delhi, a fire broke out at Arpit Palace hotel in Karol Bagh on February 12 and a four-storey building belonging to gift store Archies on February 14. Last year, a fire broke out in Beaumonde Towers in Mumbai’s Prabhadevi, the complex where actor Deepika Padukone resides; also, the government-run ESIC Kamgar Hospital located in suburban Andheri in Mumbai caught fire. Reports revealed that the hospital contained inflammable material owing to ongoing construction work, which caught fire, and the flames spread rapidly. Also, firefighting equipment was reportedly not in place.

While non-compliance of safety norms and under-equipped fire services are responsible for the sudden increase in risk posed by fire outbreaks, the use of low-quality or wrong building materials does contribute to such mishaps.

SHRIYAL SETHUMADHAVAN

Among the most recent reports, 20 students were killed and several injured after a major fire broke out – triggered by a short circuit – at a coaching centre in Sarthana area of Surat. According to India Risk Survey (IRS) 2018, as reported, fire outbreak is the third biggest risk to business continuity and operations. “The recommendations for construction of low-rise and high-rise structures should be properly followed,” says Dr Pramod Kumar Gupta, Professor, Structural Engineering, Department of Civil Engineering, IIT-Roorkee, adding that, in most cases, basic recommendations are not followed. “The used material should meet the specified requirement of fire resistance. A new version of IS 456 specifically covers different structural elements as per fire resistance.” Consider this: In Delhi, a fire broke out at Arpit Palace hotel in Karol Bagh on February 12 and a four-storey building belonging to gift store Archies on February 14. Last year, a fire broke out in Beaumonde Towers in Mumbai’s Prabhadevi, the complex where actor Deepika Padukone resides; also, the government-run ESIC Kamgar Hospital located in suburban Andheri in Mumbai caught fire. Reports revealed that the hospital contained inflammable material owing to ongoing construction work, which caught fire, and the flames spread rapidly. Also, firefighting equipment was reportedly not in place. While non-compliance of safety norms and under-equipped fire services are responsible for the sudden increase in risk posed by fire outbreaks, the use of low-quality or wrong building materials does contribute to such mishaps. SHRIYAL SETHUMADHAVAN

Next Story
Technology

AI-Enabled Workflows Lift Profitability and Productivity

Organisations modernising frontline workflows with artificial intelligence, automation and real-time data are reporting stronger financial performance, higher productivity and improved employee engagement, according to a global study by Zebra Technologies and Oxford Economics.The research covered 1,000 senior leaders across retail, manufacturing, transportation and logistics in the US, Mexico, the UK, Germany, India, Japan, Australia and New Zealand.In transportation and logistics, 54 per cent of companies that improved picking and packing operations reported faster operational performance, wh..

Next Story
Real Estate

India Leads Global AI Readiness but Implementation Lags

Indian companies lead global averages across all eight artificial intelligence readiness indicators tracked by JLL, but only 19 per cent have started making changes to their workplaces, according to the JLL 2026 Future of Work Survey.The study found that 77 per cent of Indian business leaders expect AI to change their office requirements, creating a 58-percentage-point gap between awareness and implementation. The survey covered more than 2,200 CEOs, CFOs and real estate leaders across 21 countries during the first quarter of 2026.Despite concerns over automation, 58 per cent of Indian leaders..

Next Story
Equipment

Three WOLFF Cranes Build Riyadh Cable-Stayed Bridges

Three WOLFF 180 B luffing jib cranes are supporting the construction of two cable-stayed bridges alongside the existing Wadi Laban Bridge in Riyadh, Saudi Arabia. The project is being developed for the Royal Commission for Riyadh City and executed by the ICRC joint venture comprising IC Ictas and Al Rashid Trading & Contracting Company.The cranes are handling lifting operations including formwork, reinforcement, concrete placement, work platforms, surveying equipment and other construction materials. Each crane is fitted with a 40 m jib, reaches a hook height of 157 m and offers a maximum ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement