Coal Mine Auction Bids Rise Fourfold, Draw 20 First-Time Bidders
COAL & MINING

Coal Mine Auction Bids Rise Fourfold, Draw 20 First-Time Bidders

Bids for commercial coal mines rose fourfold from the previous round, with 85 bids received for 18 coal blocks and 20 first-time bidders participating, the Ministry of Coal said. The bids were submitted under the 16th round of commercial coal mine auctions and the second attempt of the 15th round.

The ministry’s Nominated Authority offered 26 coal blocks across eight states in the two exercises. The 16th round received 83 bids for 17 blocks, while the second attempt of the 15th round received two bids for one block. Sixteen blocks attracted multiple bids, whereas eight received none.

A technical committee will examine the submissions and shortlist technically qualified bidders for the electronic auction on the MSTC portal. The bids were opened electronically in the presence of bidders, after which sealed envelopes containing documents submitted offline were opened. The proceedings were displayed live on a screen.

The increase in interest comes as production from captive and commercial coal mines rose 10.22 per cent to 210.46 mn t in FY26, according to the ministry. Under the commercial auction framework, there are no restrictions on the end use of coal, while 100 per cent foreign direct investment is permitted through the automatic route.

Since commercial coal mine auctions began in 2020, the government has auctioned 145 mines across 15 rounds and attracted 44 new companies. The ministry estimates that these mines will generate annual revenue of about Rs. 475 bn and create around 490,000 jobs. The latest participation reflects continued interest in the commercial mining framework, which allows successful bidders to sell coal without end-use restrictions.

Bids for commercial coal mines rose fourfold from the previous round, with 85 bids received for 18 coal blocks and 20 first-time bidders participating, the Ministry of Coal said. The bids were submitted under the 16th round of commercial coal mine auctions and the second attempt of the 15th round. The ministry’s Nominated Authority offered 26 coal blocks across eight states in the two exercises. The 16th round received 83 bids for 17 blocks, while the second attempt of the 15th round received two bids for one block. Sixteen blocks attracted multiple bids, whereas eight received none. A technical committee will examine the submissions and shortlist technically qualified bidders for the electronic auction on the MSTC portal. The bids were opened electronically in the presence of bidders, after which sealed envelopes containing documents submitted offline were opened. The proceedings were displayed live on a screen. The increase in interest comes as production from captive and commercial coal mines rose 10.22 per cent to 210.46 mn t in FY26, according to the ministry. Under the commercial auction framework, there are no restrictions on the end use of coal, while 100 per cent foreign direct investment is permitted through the automatic route. Since commercial coal mine auctions began in 2020, the government has auctioned 145 mines across 15 rounds and attracted 44 new companies. The ministry estimates that these mines will generate annual revenue of about Rs. 475 bn and create around 490,000 jobs. The latest participation reflects continued interest in the commercial mining framework, which allows successful bidders to sell coal without end-use restrictions.

Related Stories

Gold Stories

Next Story
Infrastructure Energy

DMRC Invites Bids for Solar-Linked BESS Power Procurement

Delhi Metro Rail Corporation (DMRC) has invited bids for renewable energy from an Inter-State Transmission System (ISTS)-connected generating plant combining a solar photovoltaic (PV) system with a co-located Battery Energy Storage System (BESS). The procurement will be conducted through competitive bidding followed by an e-reverse auction. The last date for submitting online bids is December 10, 2026, at 3 PM. DMRC will open the technical bids on December 11, 2026, at 3 PM. The opening of financial bids and the e-reverse auction will be scheduled after completion of the technical evaluation. ..

Next Story
Infrastructure Energy

Solar Growth May Slow Beyond FY28 on Awards, Grid Constraints

India’s solar capacity growth could face headwinds beyond FY28 as slower renewable energy project awards, delays in signing power agreements and transmission constraints threaten expansion, according to a report by Yes Securities. Near-term additions remain supported by a construction pipeline exceeding 150 GW and rising rooftop installations, but weaker award activity could affect capacity additions and industry volumes in FY29 and FY30. Solar capacity additions nearly doubled to 44.61 GW in FY26 from 23.83 GW in FY25. Installations remained strong in the first half of FY27, when 21 GW of s..

Next Story
Infrastructure Transport

India’s First High-Speed Rail Service to Begin in 2027

India’s first high-speed rail service will commence in 2027, with the Surat-Vapi section of the Mumbai-Ahmedabad High-Speed Rail corridor scheduled to open first, Railway Minister Ashwini Vaishnaw said. The remaining sections to Mumbai will be opened in phases. Vaishnaw said 456 km of pier work and 371 km of viaduct construction had been completed by September. About 600,000 noise barriers had been installed along a 299 km stretch, while 9,300 overhead equipment masts had been erected across a 206 km viaduct. Four mountain tunnels have been excavated, and 5 km of the 21 km Maharashtra tunnel..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code