Hindustan Zinc Q3 mined metal production rises to 254,000 t
COAL & MINING

Hindustan Zinc Q3 mined metal production rises to 254,000 t

Vedanta group firm Hindustan Zinc said its mined metal output registered a marginal rise of 1% to 2,54,000 t in the third quarter of the current fiscal. The company’s mined metal production was 2,52,000 tonnes in the year-ago period.

The company said that the mined metal production stood at 254kt in the third quarter of the current fiscal “driven by higher ore production and marginally down QoQ (Quarter-on-Quarter) due to overall mined metal grades”.

Its refined metal production at 2,57,000 tonnes declined 2% during the period under review. Hindustan Zinc's integrated zinc production during the third quarter dropped by 2% to 2,10,000 t.

Hindustan Zinc is an integrated producer of zinc, lead and silver. The company has its headquarters at Udaipur in Rajasthan where it has its zinc-lead mines and smelting complexes.

Vedanta group firm Hindustan Zinc said its mined metal output registered a marginal rise of 1% to 2,54,000 t in the third quarter of the current fiscal. The company’s mined metal production was 2,52,000 tonnes in the year-ago period. The company said that the mined metal production stood at 254kt in the third quarter of the current fiscal “driven by higher ore production and marginally down QoQ (Quarter-on-Quarter) due to overall mined metal grades”. Its refined metal production at 2,57,000 tonnes declined 2% during the period under review. Hindustan Zinc's integrated zinc production during the third quarter dropped by 2% to 2,10,000 t. Hindustan Zinc is an integrated producer of zinc, lead and silver. The company has its headquarters at Udaipur in Rajasthan where it has its zinc-lead mines and smelting complexes.

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement