Bhakra Beas Board seeks bids for solar power projects totaling 11.5 MW
POWER & RENEWABLE ENERGY

Bhakra Beas Board seeks bids for solar power projects totaling 11.5 MW

In the Haryana districts of Bhiwani and Hisar, the Bhakra Beas Management Board (BBMB) has issued an invitation for bids for the installation and commissioning of 11.5 MW of grid-connected solar power plants as well as the related transmission infrastructure. BBMB is a statutory body constituted to manage the water and power supply from Bhakra Nangal and Beas Projects to the states of Punjab, Haryana, Rajasthan, Himachal Pradesh, and Chandigarh.

The winning bidder will also be responsible for the project’s operation and upkeep for a period of five years, with an option for an additional five years. The projects will be built at the 220 kV substation in Hisar (1.5 MW) and the 400 kV substation in Bhiwani (10 MW). The bids must be submitted by April 10, 2023 and the bids will be opened the same day.

Bidders must have prior experience building ground-mounted, floating, or canal-top solar projects as an engineering, procurement, and construction (EPC) contractor or developer. The last seven years must have seen the installation and commissioning of grid-connected solar power installations with a total capacity of less than 10 MW. Before the deadline for bid submission, the project in question should have been in operation for at least six months.

The bidders must have completed at least one grid-connected solar power project with a 3 MW or greater capacity in the previous seven fiscal years, as well as ground-mounted, floating, or canal-top solar projects that included installation and commissioning. Before the deadline for bid submission, the project in question should have been in operation for at least six months.

As of the final day of the last fiscal year, bidders must have an average annual revenue of at least Rs 150 million ($1.81 million). They ought to have a positive net worth. The terms of the tender prohibit subletting the work. The Ministry of New and Renewable Energy's Approved List of Models and Manufacturers must be consulted when purchasing solar modules for the project.

In the Haryana districts of Bhiwani and Hisar, the Bhakra Beas Management Board (BBMB) has issued an invitation for bids for the installation and commissioning of 11.5 MW of grid-connected solar power plants as well as the related transmission infrastructure. BBMB is a statutory body constituted to manage the water and power supply from Bhakra Nangal and Beas Projects to the states of Punjab, Haryana, Rajasthan, Himachal Pradesh, and Chandigarh. The winning bidder will also be responsible for the project’s operation and upkeep for a period of five years, with an option for an additional five years. The projects will be built at the 220 kV substation in Hisar (1.5 MW) and the 400 kV substation in Bhiwani (10 MW). The bids must be submitted by April 10, 2023 and the bids will be opened the same day. Bidders must have prior experience building ground-mounted, floating, or canal-top solar projects as an engineering, procurement, and construction (EPC) contractor or developer. The last seven years must have seen the installation and commissioning of grid-connected solar power installations with a total capacity of less than 10 MW. Before the deadline for bid submission, the project in question should have been in operation for at least six months. The bidders must have completed at least one grid-connected solar power project with a 3 MW or greater capacity in the previous seven fiscal years, as well as ground-mounted, floating, or canal-top solar projects that included installation and commissioning. Before the deadline for bid submission, the project in question should have been in operation for at least six months. As of the final day of the last fiscal year, bidders must have an average annual revenue of at least Rs 150 million ($1.81 million). They ought to have a positive net worth. The terms of the tender prohibit subletting the work. The Ministry of New and Renewable Energy's Approved List of Models and Manufacturers must be consulted when purchasing solar modules for the project.

Next Story
Infrastructure Urban

Mount Invests Rs 250 Cr, Adds PUF & PEB Plants, 400+ Jobs

TUMKUR, Karnataka, January 8, 2025 - Mount Roofing & Structures Private Limited, one of India's  fastest-growing manufacturers in PUF and a leading solutions provider across Pre-Engineered Building  (PEB) and Polycarbonate sheets, simultaneously inaugurated its second fully automated continuous  Sandwich Panel manufacturing line and a new PEB manufacturing plant at its integrated campus in  Tumkur." The milestone expansion, part of a total investment of INR 250 crores, marks a significant  advancement in the company's commitment to engineered performance, manu..

Next Story
Infrastructure Urban

Titan Intech Strengthens UltraLED Push With Global LED Veteran

Titan Intech has announced the induction of global LED industry veteran Su Piow Ko to its Board of Directors, marking a strategic step in strengthening its UltraLED Displays roadmap and building globally competitive LED display solutions from India.The appointment aligns with Titan Intech’s ambition to position India as a hub for advanced, high-quality LED display manufacturing. With an increased focus on UltraLED Displays, the company aims to enhance technical governance, raise manufacturing standards and expand its presence across global markets.Su Piow Ko brings over three decades of inte..

Next Story
Infrastructure Urban

Dun & Bradstreet Flags New Growth Engines in India 2026 Outlook

Dun & Bradstreet has released its India 2026: D&B’s Perspective report, projecting a stable macroeconomic environment underpinned by fresh opportunities for productivity-led and inclusive growth. The report outlines how India’s next growth phase will be driven by digitised logistics, trusted data ecosystems, clean energy and rising city vitality.According to the outlook, India’s GDP growth is expected to reach around 6.6 per cent by FY2027, supported by resilient consumer demand and sustained public investment. Manufacturing is seen entering a new phase, moving beyond scale towar..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Open In App