India, Nepal Advance Rs. 57.92 bn Lower Arun Hydropower Project
POWER & RENEWABLE ENERGY

India, Nepal Advance Rs. 57.92 bn Lower Arun Hydropower Project

India and Nepal have advanced the development of the 669 MW Lower Arun Hydroelectric Project, with Prime Minister Narendra Modi and Nepal Prime Minister Balendra Shah jointly laying its foundation stone. The project, being developed at an estimated cost of Rs. 57.92 bn, is targeted for commissioning in 2030-31.

SJVN is implementing the project through its wholly owned subsidiary, SJVN Lower Arun Power Development Company. Located on the Arun river across Nepal’s Sankhuwasabha and Bhojpur districts, the project is designed to generate around 2.9 bn units of electricity annually. Its tentative tariff has been set at Rs. 4.99 per unit, according to a media report.

Lower Arun is planned as a downstream extension of SJVN’s 900 MW Arun-3 hydroelectric project. The two facilities will operate in tandem, with water discharged from Arun-3 channelled to Lower Arun for additional power generation. The arrangement is intended to improve the use of available water resources without requiring a separate storage reservoir for the downstream project.

The project will comprise four generating units, each with a capacity of 167.25 MW. Its principal infrastructure will include a 17.4-km headrace tunnel and a surface powerhouse. SJVN is implementing Lower Arun under the build, own, operate and transfer model, commonly known as BOOT.

Under the project development agreement, Nepal will receive 21 per cent of the electricity generated by Lower Arun free of cost. The project is also expected to support employment, government revenues through taxes and royalties, and infrastructure development in surrounding areas.

Lower Arun forms part of SJVN’s hydropower portfolio in Nepal and strengthens its presence in the Arun river basin. The company is also developing the 900 MW Arun-3 project upstream, creating an integrated operating arrangement between the two facilities.

India and Nepal have advanced the development of the 669 MW Lower Arun Hydroelectric Project, with Prime Minister Narendra Modi and Nepal Prime Minister Balendra Shah jointly laying its foundation stone. The project, being developed at an estimated cost of Rs. 57.92 bn, is targeted for commissioning in 2030-31. SJVN is implementing the project through its wholly owned subsidiary, SJVN Lower Arun Power Development Company. Located on the Arun river across Nepal’s Sankhuwasabha and Bhojpur districts, the project is designed to generate around 2.9 bn units of electricity annually. Its tentative tariff has been set at Rs. 4.99 per unit, according to a media report. Lower Arun is planned as a downstream extension of SJVN’s 900 MW Arun-3 hydroelectric project. The two facilities will operate in tandem, with water discharged from Arun-3 channelled to Lower Arun for additional power generation. The arrangement is intended to improve the use of available water resources without requiring a separate storage reservoir for the downstream project. The project will comprise four generating units, each with a capacity of 167.25 MW. Its principal infrastructure will include a 17.4-km headrace tunnel and a surface powerhouse. SJVN is implementing Lower Arun under the build, own, operate and transfer model, commonly known as BOOT. Under the project development agreement, Nepal will receive 21 per cent of the electricity generated by Lower Arun free of cost. The project is also expected to support employment, government revenues through taxes and royalties, and infrastructure development in surrounding areas. Lower Arun forms part of SJVN’s hydropower portfolio in Nepal and strengthens its presence in the Arun river basin. The company is also developing the 900 MW Arun-3 project upstream, creating an integrated operating arrangement between the two facilities.

Related Stories

Gold Stories

Next Story
Infrastructure Energy

JSW Motors Signs MoU with ARAI for Vehicle Development

JSW Motors, the passenger vehicle arm of JSW Group, has signed a memorandum of understanding (MoU) with the Automotive Research Association of India (ARAI) for technical collaboration on the design, validation and localisation of new energy vehicles (NEVs). The agreement is intended to create technical foundations for vehicles designed for Indian operating conditions. The companies will work on vehicle engineering and technical baselines, testing, validation and performance assessment, according to JSW Motors. Their programme will also cover advanced driver assistance systems (ADAS), battery s..

Next Story
Infrastructure Urban

Karnataka Offers Support for Toyota Expansion Plans

Karnataka Chief Minister D K Shivakumar assured Toyota Motor Corporation of the state government’s support for expanding its manufacturing operations during a meeting with the company’s senior leadership in Japan. The discussions covered higher production, new mobility solutions and further investment in Karnataka, as Toyota looks to increase vehicle production capacity to 1 mn in the near future. Shivakumar was accompanied by M B Patil, Karnataka’s Minister for Large and Medium Industries and Infrastructure Development. The Toyota delegation was led by Masakazu Yoshimura, the company’..

Next Story
Infrastructure Transport

Railways to Begin Bullet Train Trial on Surat-Bilimora Section

Indian Railways will begin a trial run of its bullet train service on the 50 km Surat-Bilimora section by May 2027. The section is part of the Mumbai-Ahmedabad high-speed rail corridor and is expected to provide the first operational segment of the project. The trial will use an indigenous trainset capable of travelling at 280 km per hour. Railway Ministry sources said the first section of the corridor, extending from Surat to Vapi, is scheduled to become operational by the end of 2027. The planned trial marks a step towards introducing high-speed rail services on the corridor, which connects ..

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code