IOC awards Soshe Power 1 MW grid-connected open access solar project
POWER & RENEWABLE ENERGY

IOC awards Soshe Power 1 MW grid-connected open access solar project

Soshe Power Tech, a solar power developer based in Hyderabad, has been awarded an engineering, procurement, and construction (EPC) contract by Indian Oil Corporation (IOC) for a 1 MW grid-connected open access captive solar power project. The project will be located at IOC?s Northern Region Pipelines in Kurukshetra, Haryana. The total contract value quoted by Soshe Power is Rs 50.3 million, covering both EPC and one year of comprehensive operation and maintenance (O&M) services, with an additional nine years of extended O&M support. The tender for this project was issued in April 2024, and Soshe Power is expected to complete the project within seven months from the issuance of the work order. Established in 2019, Soshe Power has a track record that includes a 10 MW single-axis tracker EPC project in Assam, a 2 MW rooftop solar project in Kerala, and a 1.9 MW ground-mounted project for Hindustan Petroleum Corporation in Karnataka. Currently, the company is also developing a 750-kW floating solar project in Bhavnagar, Gujarat, a 2.4 MW rooftop project, and a 1.3 MW project for industrial clients. Earlier this year, IOC issued a tender for an EPC contract for a 1 MW solar power project at Southern Region Pipelines in Chittoor, Andhra Pradesh, and sought bids for the O&M of a 1.1 MW solar power project at the Indane Bottling Plant in Devanagonthi village, Bengaluru Rural district, Karnataka. In another development, Soshe Power won an EPC contract from Hindustan Petroleum Corporation for a 1.9 MW solar power project at Hiriyur in Karnataka, which includes a ten-year operation and maintenance agreement. (Source:Mercom)

Soshe Power Tech, a solar power developer based in Hyderabad, has been awarded an engineering, procurement, and construction (EPC) contract by Indian Oil Corporation (IOC) for a 1 MW grid-connected open access captive solar power project. The project will be located at IOC?s Northern Region Pipelines in Kurukshetra, Haryana. The total contract value quoted by Soshe Power is Rs 50.3 million, covering both EPC and one year of comprehensive operation and maintenance (O&M) services, with an additional nine years of extended O&M support. The tender for this project was issued in April 2024, and Soshe Power is expected to complete the project within seven months from the issuance of the work order. Established in 2019, Soshe Power has a track record that includes a 10 MW single-axis tracker EPC project in Assam, a 2 MW rooftop solar project in Kerala, and a 1.9 MW ground-mounted project for Hindustan Petroleum Corporation in Karnataka. Currently, the company is also developing a 750-kW floating solar project in Bhavnagar, Gujarat, a 2.4 MW rooftop project, and a 1.3 MW project for industrial clients. Earlier this year, IOC issued a tender for an EPC contract for a 1 MW solar power project at Southern Region Pipelines in Chittoor, Andhra Pradesh, and sought bids for the O&M of a 1.1 MW solar power project at the Indane Bottling Plant in Devanagonthi village, Bengaluru Rural district, Karnataka. In another development, Soshe Power won an EPC contract from Hindustan Petroleum Corporation for a 1.9 MW solar power project at Hiriyur in Karnataka, which includes a ten-year operation and maintenance agreement. (Source:Mercom)

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement