Konkan Railway invites bids for solar power project
POWER & RENEWABLE ENERGY

Konkan Railway invites bids for solar power project

Konkan Railway Corporation has invited bids for the supply, installation, testing, and commissioning of a ground-mounted, grid-connected, 5 MW solar power project. The project would supply solar energy to the transmission system at 25 kV, single phase, 50 Hz, and the required protection system for 25 years at Murdeshwar of Konkan Railway in Karnataka.

The last date to submit the bids is September 22, 2022. Bidders must submit an earnest money deposit of Rs 1.48 million ($18,540). The tariff for the tender has been fixed at Rs 3.10 ($0.039)/kWh for 25 years.

Also read:
Konkan Railway completes 100% rail electrification of entire stretch


Konkan Railway Corporation has invited bids for the supply, installation, testing, and commissioning of a ground-mounted, grid-connected, 5 MW solar power project. The project would supply solar energy to the transmission system at 25 kV, single phase, 50 Hz, and the required protection system for 25 years at Murdeshwar of Konkan Railway in Karnataka. The last date to submit the bids is September 22, 2022. Bidders must submit an earnest money deposit of Rs 1.48 million ($18,540). The tariff for the tender has been fixed at Rs 3.10 ($0.039)/kWh for 25 years. Also read: Konkan Railway completes 100% rail electrification of entire stretch

Next Story
Infrastructure Urban

Recycling Leaders Push for Policy Reforms in India

As India prepares for the largest recycling-focused event in its history, industry leaders are making a strong case for policy reforms to unlock the country’s circular economy potential. Ahead of the Bharat Recycling Show (BRS) 2025, co-located with Plastics Recycling Show (PRS) India, a high-level panel discussion in Mumbai spotlighted the urgent need for regulatory clarity, digital innovation, and integration of the informal sector.Held under the theme “Unlocking Circular Value: Regulatory and Market Trends in Recycling”, the panel brought together prominent voices from across the recy..

Next Story
Infrastructure Energy

Environmental Hearing Set for 1000 MW Naying Hydro Project

The environmental public hearing for the 1,000 MW Naying hydroelectric project will take place on November 12 at Yapik community hall in Shi-Yomi district, Arunachal Pradesh, officials confirmed. The run-of-the-river project on the Siyom (Yomgo) river is being developed by the North Eastern Electric Power Corporation (NEEPCO). Construction, including a concrete dam, underground powerhouse, and tunnel, is expected to commence around 2028, with commissioning planned by 2032. The project aims to generate approximately 4,966.77 GWh of electricity. The Naying project received Central Electricity ..

Next Story
Infrastructure Energy

India Achieves 490 MWh Energy Storage Capacity by June 2025

India’s cumulative energy storage capacity reached 490 MWh by June 2025, according to data released by the Central Electricity Authority (CEA). Of this, more than 85 per cent is associated with renewable energy projects, primarily solar and wind, reflecting the country’s accelerated shift towards grid stability and clean energy integration. The CEA report highlights that 16 energy storage systems are currently operational across 10 states, with major installations in Rajasthan, Gujarat, Karnataka, and Maharashtra. These include both standalone and co-located battery systems deployed by le..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?