Maharashtra Invites PPP Bids For 200 MW Floating Solar And Hydro Upgrade
POWER & RENEWABLE ENERGY

Maharashtra Invites PPP Bids For 200 MW Floating Solar And Hydro Upgrade

The Water Resources Department of the Government of Maharashtra has invited bids from eligible contractors and developers for two renewable energy projects under a public-private partnership model. The tender, issued by the Executive Engineer of the Purna Irrigation Division at Basmathnagar as E-Tender Notice No. 02 for the financial year 2026-27, covers redevelopment and management of an existing hydroelectric installation and the development of a large floating solar and storage facility on the Purna Project reservoir. The document was issued on 24 July 2026 and detailed bid papers will be available online from 28 July to 11 August 2026.

The first assignment entails the upgradation, operation, maintenance and management of the existing 22.5 Megawatt (MW) Yeldari Dam hydroelectric plant that forms part of the Purna Irrigation Project. The concession seeks to improve operational efficiency, ensure sustained maintenance regimes and maximise renewable power output from the existing hydro resource. The scope will be offered to selected developers under the PPP framework with technical bids scheduled for opening on 12 August 2026.

The second assignment concerns the development of a 200 Megawatt (MW) Floating Solar Photovoltaic (FSPV) installation integrated with a Battery Energy Storage System (BESS) on the reservoir surface. The initiative aims to utilise available water surface area for clean power generation while incorporating storage to support grid stability and enhance renewable energy utilisation. The preliminary tender notice did not specify details on Earnest Money Deposit or Performance Bank Guarantee, and bidders are required to consult the state e-tender portal for full financial and contractual conditions.

All bidding activity must be completed online through the Maharashtra government e-tender portal and the department has instructed participants to monitor the portal for corrigenda, modifications and additional instructions. No separate notifications will be issued through other media channels and compliance with online submission requirements is mandatory. The projects form part of Maharashtra’s strategy to expand renewable generation by combining hydropower, floating solar and battery storage and are expected to support cleaner power supply while making efficient use of existing water infrastructure.

The Water Resources Department of the Government of Maharashtra has invited bids from eligible contractors and developers for two renewable energy projects under a public-private partnership model. The tender, issued by the Executive Engineer of the Purna Irrigation Division at Basmathnagar as E-Tender Notice No. 02 for the financial year 2026-27, covers redevelopment and management of an existing hydroelectric installation and the development of a large floating solar and storage facility on the Purna Project reservoir. The document was issued on 24 July 2026 and detailed bid papers will be available online from 28 July to 11 August 2026. The first assignment entails the upgradation, operation, maintenance and management of the existing 22.5 Megawatt (MW) Yeldari Dam hydroelectric plant that forms part of the Purna Irrigation Project. The concession seeks to improve operational efficiency, ensure sustained maintenance regimes and maximise renewable power output from the existing hydro resource. The scope will be offered to selected developers under the PPP framework with technical bids scheduled for opening on 12 August 2026. The second assignment concerns the development of a 200 Megawatt (MW) Floating Solar Photovoltaic (FSPV) installation integrated with a Battery Energy Storage System (BESS) on the reservoir surface. The initiative aims to utilise available water surface area for clean power generation while incorporating storage to support grid stability and enhance renewable energy utilisation. The preliminary tender notice did not specify details on Earnest Money Deposit or Performance Bank Guarantee, and bidders are required to consult the state e-tender portal for full financial and contractual conditions. All bidding activity must be completed online through the Maharashtra government e-tender portal and the department has instructed participants to monitor the portal for corrigenda, modifications and additional instructions. No separate notifications will be issued through other media channels and compliance with online submission requirements is mandatory. The projects form part of Maharashtra’s strategy to expand renewable generation by combining hydropower, floating solar and battery storage and are expected to support cleaner power supply while making efficient use of existing water infrastructure.

Related Stories

Gold Stories

Next Story
Infrastructure Urban

PMC Approves Rs 5.78 bn Waste Processing Contract

The Pune Municipal Corporation approved a Rs 5.7796 billion (bn) fifteen-year contract to process 500 metric tonnes (t) of waste daily at the Devachi Uruli depot and allowed unauthorised overhead cables to remain temporarily for one year subject to a fee. The decision was taken by the civic body to appoint a private operator for an integrated waste facility covering about 12 acres. The approval frames the contract as an operational arrangement with a fixed base rate and annual adjustments. The contract was awarded to Bhoomi Green Energy Envirocare LLP, which quoted Rs 772 per t, compared with ..

Next Story
Infrastructure Urban

Kerala High Court to Inspect Brahmapuram Waste Plant

Two judges of the Kerala High Court, Justice Bechu Kurian Thomas and Justice Gopinath P, will inspect the Brahmapuram waste management plant on 11 September as part of the suo motu proceeding on the plant's maintenance. The inspection was scheduled to allow the bench to assess conditions on site and to verify representations made by municipal and state authorities. The court listed the site visit during a hearing and directed officials to prepare for an on-site review. The bench instructed authorities to file a detailed report on the plant's present functioning ahead of the visit. It said the ..

Next Story
Infrastructure Transport

Ahmedabad Geetamandir Bus Port Terminal Two Ready with Airport Facilities

Ahmedabad’s Geetamandir Bus Port has completed a separate Terminal Two, which is ready to serve passengers travelling to Saurashtra-Kutch and North Gujarat. The facility has been developed with airport like facilities to improve passenger comfort and ease of travel. Deputy Chief Minister Harsh Sanghvi is scheduled to inaugurate the new terminal today. Authorities say the design focuses on smoother boarding and reduced congestion. Terminal Two will become operational from 13 August and is expected to handle 1,091 buses daily servicing routes to Saurashtra-Kutch and North Gujarat. The new arra..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement