Maharashtra Seeks PPP Bids For 200 MW Floating Solar And 22.5 MW Hydro
POWER & RENEWABLE ENERGY

Maharashtra Seeks PPP Bids For 200 MW Floating Solar And 22.5 MW Hydro

The Water Resources Department of the Government of Maharashtra has invited bids from eligible contractors and developers for two renewable energy projects in Parbhani and Hingoli districts under a public–private partnership model. The Executive Engineer of the Purna Irrigation Division at Basmathnagar issued the notice as E?Tender No. 02 for the financial year 2026–27. The tender covers redevelopment of an existing hydroelectric plant and the development of a floating solar and storage facility on the Purna reservoir.

The first project involves the upgradation, operation, maintenance and management of the existing 22.5 Megawatt (MW) Yeldari Dam Hydroelectric Plant, part of the Purna Irrigation Project. The department intends to improve operational efficiency, ensure effective maintenance and maximise renewable power generation from the hydro resource. The asset will be offered to selected developers under the PPP framework with performance obligations set out in the bid documents.

The second project seeks development of a 200 MW floating solar photovoltaic project integrated with a Battery Energy Storage System (BESS) on the reservoir surface. The plan aims to use available water surface area for clean energy generation while adding storage capacity to support grid stability and improve renewable utilisation. Integration with the hydro asset is identified as an important operational consideration.

The tender document was issued on 24 July 2026 and detailed bid documents are available from 28 July 2026 to 11 August 2026, with technical bids due to be opened on 12 August 2026. The preliminary notice does not include details of earnest money deposit or performance bank guarantee and directs bidders to consult the Maharashtra government e?tendering portal for full bid security and financial requirements. All bidding activities must be completed online and bidders are advised to monitor the portal for any corrigendum or modifications as the department will not issue separate notifications through other media channels.

The Water Resources Department of the Government of Maharashtra has invited bids from eligible contractors and developers for two renewable energy projects in Parbhani and Hingoli districts under a public–private partnership model. The Executive Engineer of the Purna Irrigation Division at Basmathnagar issued the notice as E?Tender No. 02 for the financial year 2026–27. The tender covers redevelopment of an existing hydroelectric plant and the development of a floating solar and storage facility on the Purna reservoir. The first project involves the upgradation, operation, maintenance and management of the existing 22.5 Megawatt (MW) Yeldari Dam Hydroelectric Plant, part of the Purna Irrigation Project. The department intends to improve operational efficiency, ensure effective maintenance and maximise renewable power generation from the hydro resource. The asset will be offered to selected developers under the PPP framework with performance obligations set out in the bid documents. The second project seeks development of a 200 MW floating solar photovoltaic project integrated with a Battery Energy Storage System (BESS) on the reservoir surface. The plan aims to use available water surface area for clean energy generation while adding storage capacity to support grid stability and improve renewable utilisation. Integration with the hydro asset is identified as an important operational consideration. The tender document was issued on 24 July 2026 and detailed bid documents are available from 28 July 2026 to 11 August 2026, with technical bids due to be opened on 12 August 2026. The preliminary notice does not include details of earnest money deposit or performance bank guarantee and directs bidders to consult the Maharashtra government e?tendering portal for full bid security and financial requirements. All bidding activities must be completed online and bidders are advised to monitor the portal for any corrigendum or modifications as the department will not issue separate notifications through other media channels.

Related Stories

Gold Stories

Next Story
Resources

Schindler named among Forbes’ World’s Best Employers 2026

Schindler has been named among Forbes’ World’s Best Employers 2026, a global ranking recognising companies for their workplace environments.Compiled by Forbes in partnership with Statista, the ranking is based on independent employee feedback, including whether employees would recommend their organisation to friends and family.The company said the recognition reflected its focus on creating a workplace where employees can develop their expertise and build careers. ..

Next Story
Infrastructure Urban

India needs an export-execution mindset: Vishesh Jain

Interview with Vishesh Jain, Founder & CEO, EximpleWhat gaps in India’s global trade ecosystem led you to build Eximple, and what problem did you see businesses struggling with most?Eximple came out of a problem that all three founders had seen from different choke points in the trade ecosystem. India has millions of MSMEs and manufacturers, and many of them can make products that are genuinely competitive on quality. Yet only a small fraction is able to build meaningful international businesses. In our experience, the gap is usually not manufacturing capability; it is the ability to exe..

Next Story
Building Material

Nuvoco reports 13.5% revenue growth in Q2 FY27

Nuvoco Vistas Corp. Ltd. reported consolidated revenue of Rs 27.9 billion for Q2 FY27, up 13.5% year on year. Cement sales volume rose 9% to 4.7 million tonnes (MMT), while EBITDA increased 11% to Rs 4.11 billion.The company said it began its cement operations in 2014 with a 2.3 MMT per annum (MMTPA) operation at Nimbol. It now aims to reach 35 MMTPA of cement capacity by FY28, nearly 15 times its initial capacity. Its portfolio spans cement, ready-mix concrete and modern building materials.On sustainability and cost efficiency, Nuvoco partnered with CleanMax for a 46.4 MW wind-solar hybrid re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code