Maharashtra Seeks PPP Bids For 200 MW Floating Solar And 22.5 MW Hydro
POWER & RENEWABLE ENERGY

Maharashtra Seeks PPP Bids For 200 MW Floating Solar And 22.5 MW Hydro

The Water Resources Department of the Government of Maharashtra has invited bids from eligible contractors and developers for two renewable energy projects in Parbhani and Hingoli districts under a public–private partnership model. The Executive Engineer of the Purna Irrigation Division at Basmathnagar issued the notice as E?Tender No. 02 for the financial year 2026–27. The tender covers redevelopment of an existing hydroelectric plant and the development of a floating solar and storage facility on the Purna reservoir.

The first project involves the upgradation, operation, maintenance and management of the existing 22.5 Megawatt (MW) Yeldari Dam Hydroelectric Plant, part of the Purna Irrigation Project. The department intends to improve operational efficiency, ensure effective maintenance and maximise renewable power generation from the hydro resource. The asset will be offered to selected developers under the PPP framework with performance obligations set out in the bid documents.

The second project seeks development of a 200 MW floating solar photovoltaic project integrated with a Battery Energy Storage System (BESS) on the reservoir surface. The plan aims to use available water surface area for clean energy generation while adding storage capacity to support grid stability and improve renewable utilisation. Integration with the hydro asset is identified as an important operational consideration.

The tender document was issued on 24 July 2026 and detailed bid documents are available from 28 July 2026 to 11 August 2026, with technical bids due to be opened on 12 August 2026. The preliminary notice does not include details of earnest money deposit or performance bank guarantee and directs bidders to consult the Maharashtra government e?tendering portal for full bid security and financial requirements. All bidding activities must be completed online and bidders are advised to monitor the portal for any corrigendum or modifications as the department will not issue separate notifications through other media channels.

The Water Resources Department of the Government of Maharashtra has invited bids from eligible contractors and developers for two renewable energy projects in Parbhani and Hingoli districts under a public–private partnership model. The Executive Engineer of the Purna Irrigation Division at Basmathnagar issued the notice as E?Tender No. 02 for the financial year 2026–27. The tender covers redevelopment of an existing hydroelectric plant and the development of a floating solar and storage facility on the Purna reservoir. The first project involves the upgradation, operation, maintenance and management of the existing 22.5 Megawatt (MW) Yeldari Dam Hydroelectric Plant, part of the Purna Irrigation Project. The department intends to improve operational efficiency, ensure effective maintenance and maximise renewable power generation from the hydro resource. The asset will be offered to selected developers under the PPP framework with performance obligations set out in the bid documents. The second project seeks development of a 200 MW floating solar photovoltaic project integrated with a Battery Energy Storage System (BESS) on the reservoir surface. The plan aims to use available water surface area for clean energy generation while adding storage capacity to support grid stability and improve renewable utilisation. Integration with the hydro asset is identified as an important operational consideration. The tender document was issued on 24 July 2026 and detailed bid documents are available from 28 July 2026 to 11 August 2026, with technical bids due to be opened on 12 August 2026. The preliminary notice does not include details of earnest money deposit or performance bank guarantee and directs bidders to consult the Maharashtra government e?tendering portal for full bid security and financial requirements. All bidding activities must be completed online and bidders are advised to monitor the portal for any corrigendum or modifications as the department will not issue separate notifications through other media channels.

Next Story
Infrastructure Transport

Adani Eyes UK Port Operator Associated British Ports

Adani Ports and Special Economic Zone is evaluating a potential bid for Associated British Ports, the United Kingdom’s largest port operator, people aware of the discussions told Moneycontrol. A spokesperson said the company does not comment on market speculation and continuously evaluates opportunities that align with its long-term strategy. The spokesperson added that the approach aims to create sustainable value for stakeholders. The discussions remain at an early stage and may not result in a formal offer. Associated British Ports operates 21 ports across England, Scotland and Wales, inc..

Next Story
Infrastructure Urban

NPCIL Seeks Bids For Engineering And 3D Design Of Bharat Small Reactors

The Nuclear Power Corporation of India (NPCIL) has floated a tender for plant engineering and three-dimensional (3D) modelling of its 220 megawatt (MW) Bharat Small Reactors (BSRs). The reactors are based on proven 220 megawatt (MW) pressurised heavy water reactor (PHWR) technology and bids are to be submitted by August 10. The move marks a further step in India's plan to expand nuclear power capacity. The scope calls for generic design and engineering for civil, process, mechanical, piping, electrical and control and instrumentation systems, together with ventilation and air conditioning, pip..

Next Story
Infrastructure Urban

Supreme Court Quashes 2021 OM Allowing Retrospective Clearances

The Supreme Court quashed the 2021 Office Memorandum allowing retrospective environmental clearances for projects commenced without approval. A bench of Chief Justice Surya Kant and Justices Joymalya Bagchi and Vipul M Pancholi delivered a unanimous verdict applying prospectively to protect projects that had already received retrospective clearances from demolition and punitive measures. The court cited examples such as an AIIMS in Odisha, a greenfield airport in Vijayanagar in Karnataka and several common effluent treatment plants central to pollution control. The court held that post-facto c..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement