+
Manohar Lal Visits Kakrapar Atomic Power Project
POWER & RENEWABLE ENERGY

Manohar Lal Visits Kakrapar Atomic Power Project

Union Minister for Power and Housing & Urban Affairs, Manohar Lal, was on a two-day visit to Gujarat on 27 and 28 April 2025.

During the visit, he chaired the Consultative Committee meeting of the Ministry of Power on the development of nuclear power generation, held meetings with Chief Minister Bhupendra Patel and Energy Minister Kanu Desai,

Union Minister Manohar Lal also visited the Kakrapar Atomic Power Project, and paid a visit to solar PV Assembly line facility at Pandit Deendayal Energy University (PDEU).

A meeting of the Consultative Committee of the Ministry of Power was held on 28 April 2025 under the Chairmanship of Manohar Lal, Hon’ble Union Minister for Power and Housing & Urban Affairs. The agenda for discussion was "Roadmap for Development of Nuclear Power Generation."

During the meeting, Minister highlighted India’s commitment to achieving net zero carbon emissions by 2070 and emphasized that increasing the share of non-fossil fuel-based power generation is central to this vision. As the power sector contributes over 40% of global energy-related emissions, nuclear energy, being a non-fossil and stable power source, will play an increasingly important role in India’s sustainable development journey.

During the two days tour of Gujrat Union Minister of Power and Housing & Urban Affairs, Manohar Lal, also met Chief Minister of Gujarat, Bhupendra Patel, at his official residence in Gandhinagar. The two leaders held discussions on key issues concerning the power and urban development sectors in Gujarat.

Union Minister of Power and Housing & Urban Affairs, Manohar Lal, held a meeting with Gujarat’s Minister of Energy, Kanu Desai, in Gandhinagar on 28 April 2025 to review the progress of key initiatives in the power sector. Both leaders had detailed discussions on ongoing and upcoming projects in the state, with a special focus on strengthening the transmission infrastructure and accelerating the clean energy transition.

The Government of Gujarat assured to fast-track the resolution of pending land acquisition and Right of Way (RoW) issues concerning critical transmission projects at Vataman and Pirana, which are essential for improving power evacuation from upcoming renewable energy projects. The state government also committed to expediting the implementation of the smart metering program across Gujarat to enhance power sector efficiency, transparency, and consumer services.

News source: PIB

Union Minister for Power and Housing & Urban Affairs, Manohar Lal, was on a two-day visit to Gujarat on 27 and 28 April 2025. During the visit, he chaired the Consultative Committee meeting of the Ministry of Power on the development of nuclear power generation, held meetings with Chief Minister Bhupendra Patel and Energy Minister Kanu Desai, Union Minister Manohar Lal also visited the Kakrapar Atomic Power Project, and paid a visit to solar PV Assembly line facility at Pandit Deendayal Energy University (PDEU). A meeting of the Consultative Committee of the Ministry of Power was held on 28 April 2025 under the Chairmanship of Manohar Lal, Hon’ble Union Minister for Power and Housing & Urban Affairs. The agenda for discussion was Roadmap for Development of Nuclear Power Generation. During the meeting, Minister highlighted India’s commitment to achieving net zero carbon emissions by 2070 and emphasized that increasing the share of non-fossil fuel-based power generation is central to this vision. As the power sector contributes over 40% of global energy-related emissions, nuclear energy, being a non-fossil and stable power source, will play an increasingly important role in India’s sustainable development journey. During the two days tour of Gujrat Union Minister of Power and Housing & Urban Affairs, Manohar Lal, also met Chief Minister of Gujarat, Bhupendra Patel, at his official residence in Gandhinagar. The two leaders held discussions on key issues concerning the power and urban development sectors in Gujarat. Union Minister of Power and Housing & Urban Affairs, Manohar Lal, held a meeting with Gujarat’s Minister of Energy, Kanu Desai, in Gandhinagar on 28 April 2025 to review the progress of key initiatives in the power sector. Both leaders had detailed discussions on ongoing and upcoming projects in the state, with a special focus on strengthening the transmission infrastructure and accelerating the clean energy transition. The Government of Gujarat assured to fast-track the resolution of pending land acquisition and Right of Way (RoW) issues concerning critical transmission projects at Vataman and Pirana, which are essential for improving power evacuation from upcoming renewable energy projects. The state government also committed to expediting the implementation of the smart metering program across Gujarat to enhance power sector efficiency, transparency, and consumer services. News source: PIB

Related Stories

Gold Stories

Next Story
Infrastructure Transport

Mumbai Metro 7A Viaduct Error May Require Rs 2.5bn Rebuild

An engineering planning error on the Mumbai Metro Line 7A could require demolition and reconstruction of almost one kilometre of an elevated viaduct in Vile Parle East after the height of overhead electric wires exceeded the clearance permitted by the Airports Authority of India in the airport funnel zone. The mismatch, of about two point five metres, has halted work on the stretch despite most civil construction being complete. The authority estimated that if no technical remedy is found, work valued at Rs two point five billion (bn) may have to be redone, adding to delays. The short extensio..

Next Story
Infrastructure Transport

Johnson Lifts Wins UP Metro Elevator Contract

Uttar Pradesh Metro Rail Corporation Limited (UPMRC) has awarded Johnson Lifts Pvt. Ltd. a Rs896.1 million (mn) contract after the company emerged as the sole bidder to supply and commission heavy-duty elevators and escalators for the Lucknow, Kanpur and Agra Metro projects. The award covers supply of equipment, installation and commissioning across station locations designated by the client. The contract value includes obligations for initial delivery and on-site integration with station access systems. The agreement requires Johnson Lifts to complete installation and testing of the equipment..

Next Story
Infrastructure Transport

Pune Metro Line 3 To Begin Operations In September

Pune Metro Line 3, a 23.3 km corridor from Hinjewadi to Shivajinagar via Balewadi, is preparing to commence operations in September. The project will provide a direct public transport link to Hinjewadi, one of the city's major IT and employment centres, and will connect it with key urban districts. Trial runs are under way and officials have indicated that trains can reach speeds of 80 kmph. Testing has included system checks and staff training to ready services for passengers.\n\nThe first phase covers nearly eight km between Maan and Balewadi, with 12 stations declared ready and five additio..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code