Texmaco JV Wins Rs 179 Cr Nepal Hydropower Project
POWER & RENEWABLE ENERGY

Texmaco JV Wins Rs 179 Cr Nepal Hydropower Project

"Texmaco has announced that their joint venture company with SS Fabricators and Manufacturers has secured an order worth Rs 179.89 crore from SJVN Arun-3 Power Development Company Limited. This project is currently in development in Nepal and involves the construction of a 900MW run-of-the-river hydropower facility.

The scope of work for this project includes various responsibilities such as procurement, fabrication, shop assembly, painting, testing, transportation, supply, erection, site testing, and commissioning of the Pressure Shaft Steel Liner.

In a separate development, Kilburn Engineering, a company controlled by the Kolkata-based Williamson Magor Group, has revealed its acquisition of ME Energy, a provider of waste heat recovery and waste heat reutilization systems, for approximately Rs 99 crore. This strategic acquisition is aimed at enhancing Kilburn Engineering's capabilities and strengthening its position in the thermal engineering systems market, as stated by the company in an official statement."

Texmaco has announced that their joint venture company with SS Fabricators and Manufacturers has secured an order worth Rs 179.89 crore from SJVN Arun-3 Power Development Company Limited. This project is currently in development in Nepal and involves the construction of a 900MW run-of-the-river hydropower facility. The scope of work for this project includes various responsibilities such as procurement, fabrication, shop assembly, painting, testing, transportation, supply, erection, site testing, and commissioning of the Pressure Shaft Steel Liner. In a separate development, Kilburn Engineering, a company controlled by the Kolkata-based Williamson Magor Group, has revealed its acquisition of ME Energy, a provider of waste heat recovery and waste heat reutilization systems, for approximately Rs 99 crore. This strategic acquisition is aimed at enhancing Kilburn Engineering's capabilities and strengthening its position in the thermal engineering systems market, as stated by the company in an official statement.

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement