+
CIDCO Signs 60 Year Lease For Nerul Land At Rs 1.77 bn Premium
Real Estate

CIDCO Signs 60 Year Lease For Nerul Land At Rs 1.77 bn Premium

The City and Industrial Development Corporation of Maharashtra Ltd leased a one point four acre land parcel in Sector 52A, Nerul, Navi Mumbai to Today Royal Developers for a one-time lease premium of Rs 1.7705 billion (bn), according to property registration documents reviewed by CRE Matrix. The transaction was formally registered on July 10, 2026 and the developer paid Rs 79.7 million (mn) in stamp duty at the time of registration. The lease runs for a 60-year tenure and the agreement specifies a nominal annual lease rent of Rs 100 in addition to the upfront premium.

The plot measures 5,785.78 sq metres and has been designated for mixed use development, permitting both residential and commercial construction within the approved planning framework. The base permissible floor space index is one point five and the developer will be required to comply with applicable municipal and statutory approvals during the course of development. The registration records provide the basis for calculating the effective premium and related obligations.

Based on the one-time premium and the recorded plot area, the lease premium works out to approximately Rs 0.306 mn per sq metre, a calculation set out in the documents. The registration entries also list the precise area and repeat the nominal annual rent condition, indicating a standard long-tenure lease structure used by the authority. The records were sourced from CRE Matrix and reflect official filings lodged at the time of the transfer.

The Nerul transaction follows earlier high value lease deals in the region; in March 2025 a separate agreement recorded that Godrej Properties acquired three contiguous parcels totalling 6.54 acres on a 60-year lease for Rs 7.17 bn, with stamp duty and registration fees recorded separately. The latest sale highlights CIDCO's continued policy of unlocking development potential through long-term leasehold arrangements that permit mixed use projects across Navi Mumbai. No comment was available from Today Royal Developers when the registration documents were reviewed.

The City and Industrial Development Corporation of Maharashtra Ltd leased a one point four acre land parcel in Sector 52A, Nerul, Navi Mumbai to Today Royal Developers for a one-time lease premium of Rs 1.7705 billion (bn), according to property registration documents reviewed by CRE Matrix. The transaction was formally registered on July 10, 2026 and the developer paid Rs 79.7 million (mn) in stamp duty at the time of registration. The lease runs for a 60-year tenure and the agreement specifies a nominal annual lease rent of Rs 100 in addition to the upfront premium. The plot measures 5,785.78 sq metres and has been designated for mixed use development, permitting both residential and commercial construction within the approved planning framework. The base permissible floor space index is one point five and the developer will be required to comply with applicable municipal and statutory approvals during the course of development. The registration records provide the basis for calculating the effective premium and related obligations. Based on the one-time premium and the recorded plot area, the lease premium works out to approximately Rs 0.306 mn per sq metre, a calculation set out in the documents. The registration entries also list the precise area and repeat the nominal annual rent condition, indicating a standard long-tenure lease structure used by the authority. The records were sourced from CRE Matrix and reflect official filings lodged at the time of the transfer. The Nerul transaction follows earlier high value lease deals in the region; in March 2025 a separate agreement recorded that Godrej Properties acquired three contiguous parcels totalling 6.54 acres on a 60-year lease for Rs 7.17 bn, with stamp duty and registration fees recorded separately. The latest sale highlights CIDCO's continued policy of unlocking development potential through long-term leasehold arrangements that permit mixed use projects across Navi Mumbai. No comment was available from Today Royal Developers when the registration documents were reviewed.

Related Stories

Gold Stories

Next Story
Real Estate

Kamdhenu Realities acquires 4-acre Navi Mumbai land parcel

Kamdhenu Realities has acquired a 4-acre land parcel from RPG Life Sciences on Thane-Belapur Road for approximately Rs 1.5 billion, expanding its commercial real estate portfolio in Navi Mumbai.The parcel has a total developable potential of 1.8 million sq ft, on which Kamdhenu plans to develop a destination-scale commercial and lifestyle ecosystem. The proposed development will combine corporate office suites with high-street retail, F&B outlets, double-height lobbies, business infrastructure and lifestyle amenities.Located close to IKEA and opposite the upcoming Pawane Railway Station, t..

Next Story
Infrastructure Transport

97 Per Cent Of Rongjeng-Mangsang-Adokgre Road Nears Completion

Deputy Chief Minister in-charge of public works Prestone Tynsong said in Shillong on 26 August that 97 per cent physical progress had been achieved on the ongoing Rongjeng-Mangsang-Adokgre road being constructed under the Non-Lapsable Central Pool of Resources (NLCPR). He noted the project was sanctioned in 2017 and that the stipulated time for completion had been 24 months from issue of the final work order. The deputy chief minister informed the assembly that the government had decided to include the remaining work under a World Bank project. In reply to a query from Rongjeng MLA Jim M Sangm..

Next Story
Infrastructure Transport

First TBM Starts Digging Five Point Three Kilometre Tunnel Under SGNP

The Goregaon-Mulund Link Road (GMLR) Phase three (B) project has reached a key milestone as the first tunnel boring machine (TBM) began excavation of the first of two tunnels beneath the Sanjay Gandhi National Park (SGNP). The machine, named Tulsi, started cutting a five point three kilometre bore that will link Dadasaheb Phalke Chitranagari in Goregaon East with Amar Nagar in Mulund West. Officials issued a statement noting the commencement of tunnelling work under the protected green belt. The twin tunnels are being constructed using mechanised tunnelling methods that aim to limit surface di..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code