JdVVNL Invites Bids For Rs 6,275 Million Rooftop Solar Scheme
Real Estate

JdVVNL Invites Bids For Rs 6,275 Million Rooftop Solar Scheme

Jodhpur Vidyut Vitran Nigam Limited has invited competitive e?bids for a rooftop solar programme under the central government's PM Surya Ghar: Muft Bijli Yojana, aiming to accelerate household adoption across the Jodhpur distribution region through a utility?led aggregation model on a capital expenditure basis. The tender covers design, supply, installation, testing and commissioning of grid?connected rooftop solar systems and includes operation and maintenance obligations. The authority estimated the total project value at Rs 6,275 million (mn).

The scope envisages systems for 100,000 residential consumers, equivalent to 0.1 mn, with an initial operation and maintenance period of five years and an optional five year extension to secure long term performance. Successful bidders will be responsible for end?to?end delivery and for meeting the technical and quality standards set out in the tender. The programme is intended to expand household access to clean energy and lower electricity costs.

The tender documents became available for download and online submission on July 10, 2026 from 11:00 am, a pre?bid meeting is scheduled for July 15, and the online submission deadline is July 29, 2026 at 5:00 pm, with bids due to be opened on July 31 at 3:00 pm. Developers must pay a non?refundable tender document fee of Rs 10,000 plus 18 per cent GST and an e?procurement processing fee of Rs 2,950 inclusive of GST, payable by Demand Draft or Banker's Cheque to the Managing Director, RISL, Jaipur. Hard copies of the processing fee receipt and original Rajasthan non?judicial stamp documents must reach the Office of the Superintending Engineer (RE?DSM), Jodhpur by July 30 at 3:00 pm.

The tender requires an earnest money deposit equal to two per cent of the estimated project cost, which corresponds to Rs 125.5 million (mn) based on the stated value, and performance bank guarantee provisions are detailed in the tender. JdVVNL has advised bidders to review all conditions carefully and submit well before the deadline to avoid technical issues on the state e?procurement portal. Contractual options for extended maintenance are included to support long term reliability.

Jodhpur Vidyut Vitran Nigam Limited has invited competitive e?bids for a rooftop solar programme under the central government's PM Surya Ghar: Muft Bijli Yojana, aiming to accelerate household adoption across the Jodhpur distribution region through a utility?led aggregation model on a capital expenditure basis. The tender covers design, supply, installation, testing and commissioning of grid?connected rooftop solar systems and includes operation and maintenance obligations. The authority estimated the total project value at Rs 6,275 million (mn). The scope envisages systems for 100,000 residential consumers, equivalent to 0.1 mn, with an initial operation and maintenance period of five years and an optional five year extension to secure long term performance. Successful bidders will be responsible for end?to?end delivery and for meeting the technical and quality standards set out in the tender. The programme is intended to expand household access to clean energy and lower electricity costs. The tender documents became available for download and online submission on July 10, 2026 from 11:00 am, a pre?bid meeting is scheduled for July 15, and the online submission deadline is July 29, 2026 at 5:00 pm, with bids due to be opened on July 31 at 3:00 pm. Developers must pay a non?refundable tender document fee of Rs 10,000 plus 18 per cent GST and an e?procurement processing fee of Rs 2,950 inclusive of GST, payable by Demand Draft or Banker's Cheque to the Managing Director, RISL, Jaipur. Hard copies of the processing fee receipt and original Rajasthan non?judicial stamp documents must reach the Office of the Superintending Engineer (RE?DSM), Jodhpur by July 30 at 3:00 pm. The tender requires an earnest money deposit equal to two per cent of the estimated project cost, which corresponds to Rs 125.5 million (mn) based on the stated value, and performance bank guarantee provisions are detailed in the tender. JdVVNL has advised bidders to review all conditions carefully and submit well before the deadline to avoid technical issues on the state e?procurement portal. Contractual options for extended maintenance are included to support long term reliability.

Next Story
Infrastructure Transport

Surya Roshni delivers customised lighting for NCRTC RRTS stations

Surya Roshni has supplied customised indoor lighting solutions for 18 elevated stations on the National Capital Region Transport Corporation's (NCRTC) Rapid Rail Transit System (RRTS), strengthening its presence in India's infrastructure lighting segment.The project involved the design and deployment of lighting systems for platforms, concourses, foot overbridges (FOBs) and back-of-house (BOH) areas. According to the company, the luminaires were developed specifically to meet NCRTC's design, operational and performance requirements rather than using standard products.Surya introduced two custo..

Next Story
Real Estate

Hilton debuts Tapestry Collection brand in Vietnam

Hilton has opened NHAAN Resort & Spa Hoi An, Tapestry Collection by Hilton, marking the debut of the Tapestry Collection brand in Vietnam and expanding its lifestyle hospitality portfolio in Southeast Asia.Located along the Co Co River in Cam Thanh village, the 174-key resort provides access to Hoi An Ancient Town, Cua Dai Beach and the Cam Thanh Nipa Forest. The property has been designed by Vietnamese architect Vo Trong Nghia, incorporating biophilic architecture, locally sourced materials and riverfront landscapes.The resort offers a mix of guest rooms and suites, including family-frien..

Next Story
Building Material

Electrent expands lithium energy storage system portfolio

Electrent Energy has expanded its lithium-based energy storage portfolio with the launch of the ESS 850 and ESS 1050, targeting compact and maintenance-free power backup solutions for Indian homes.The new systems integrate a Home UPS and a LiFePO4 lithium battery into a single unit, extending the company's product range following the launch of its ESS 1350 and ESS 2500 models.Designed for apartments and smaller homes, the ESS 850 provides up to 1 hour 15 minutes of backup, while the ESS 1050 offers up to 1 hour 45 minutes on a typical 400 W household load. The systems can power essential appli..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement