L&T B&F secures repeat order for two constructing towers
Real Estate

L&T B&F secures repeat order for two constructing towers

The Buildings & Factories (B&F) Fast Business of L&T Construction has secured a significant repeat order from a reputed and prestigious commercial developer, one of India’s largest mixed-use developers and operators. The mandate is to construct two towers with commercial office space in Hyderabad with approximate built-up areas of 28.91 lakh sq. ft and 28.53 lakh sq. ft respectively.

The project scope includes civil work for the composite structure including MEP, finishes & façade to construct the towers in 6B+G+22 floors and 6B+G+41 floors configurations. The project is scheduled to be completed in 18 months.

“B&F Fast is a specialised unit that focuses on using innovative methods and deploying technology for ultra-speedy construction,” said Mr M V Satish, Whole-Time Director & Senior Executive Vice President (Buildings), L&T. “Securing this repeat order is a testament to our long-standing relationship with the developer and our strong capabilities to build fast and smart in this fast-growing segment.”

The B&F Fast unit had recently constructed a 7-storey, state-of-the-art Flight Control System Integration Centre for DRDO in just 45 days.

The Buildings & Factories (B&F) Fast Business of L&T Construction has secured a significant repeat order from a reputed and prestigious commercial developer, one of India’s largest mixed-use developers and operators. The mandate is to construct two towers with commercial office space in Hyderabad with approximate built-up areas of 28.91 lakh sq. ft and 28.53 lakh sq. ft respectively. The project scope includes civil work for the composite structure including MEP, finishes & façade to construct the towers in 6B+G+22 floors and 6B+G+41 floors configurations. The project is scheduled to be completed in 18 months. “B&F Fast is a specialised unit that focuses on using innovative methods and deploying technology for ultra-speedy construction,” said Mr M V Satish, Whole-Time Director & Senior Executive Vice President (Buildings), L&T. “Securing this repeat order is a testament to our long-standing relationship with the developer and our strong capabilities to build fast and smart in this fast-growing segment.” The B&F Fast unit had recently constructed a 7-storey, state-of-the-art Flight Control System Integration Centre for DRDO in just 45 days.

Next Story
Infrastructure Urban

Implementation Status of Jal Jeevan Mission

Since August 2019 the Government has implemented Jal Jeevan Mission to provide assured potable water through household tap connections in rural India. At the start of the mission only 32.3 million (mn) rural households, representing 16.7 per cent, were reported to have tap water connections. States and union territories have reported that 125.8 mn additional rural households have since been provided with tap connections. As a result, of about 193.6 mn rural households roughly 158.2 mn, or 81.71 per cent, are reported to have tap water supply at home.\n\nThe State, district and village level st..

Next Story
Infrastructure Urban

Jal Jeevan Mission Reaches Eighty One Per Cent Rural Coverage

The Government reported substantial progress under the Jal Jeevan Mission, launched in August 2019 to provide tap water to every rural household. At launch only 32.3 million (mn) rural households had tap connections and states and Union territories reported provision of 125.8 mn additional households by March 2026. Consequently, out of about 193.6 mn rural households around 158.2 mn, or 81.71 per cent, are reported to have tap water at home. The Finance Minister announced extension of the mission until 2028 in the 2025-26 budget speech. The Swachh Bharat Mission Grameen, launched in October 20..

Next Story
Infrastructure Urban

Empowering Local Governance for Sustainable Rural Water Supply

The Ministry of Jal Shakti has aligned the Jal Jeevan Mission (JJM) with the 73rd Amendment to strengthen village level planning and community ownership of water supply. Gram Panchayats, village water and sanitation committees and Pani Samitis are to plan, implement, manage and maintain piped water systems, with gram sabha processes formalising handover and oversight. Implementation support agencies including non government organisations, community based organisations and self help groups have been empanelled to train local committees and promote women participation. Under JJM, the department ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement