Assam CM Orders Road Repairs to Boost Tourism and Economy with Bhutan
ECONOMY & POLICY

Assam CM Orders Road Repairs to Boost Tourism and Economy with Bhutan

In a move to enhance connectivity and foster economic growth between Assam and Bhutan, Chief Minister Himanta Biswa Sarma has directed officials to prioritize the maintenance and repair of roads linking the two states.

Sarma, who also holds the Public Works Department (PWD) portfolio, reviewed various ongoing and proposed road projects connecting Assam and Bhutan during a meeting with senior department officials.

"To assess the condition of highways and roads connecting Assam and Bhutan, Chief Minister Dr. @himantabiswa held a meeting with PWD officials and other concerned officials," the Chief Minister's Office stated in a social media post.

The Chief Minister emphasized the importance of maintaining and upgrading the road infrastructure to facilitate seamless transportation and promote tourism and economic activities between the two regions.

This initiative comes on the heels of the recent visit by Bhutan King Jigme Khesar Namgyal Wangchuk to Assam, marking the first time the monarch has traveled to the state. During his three-day tour, which began on November 3, the King visited several prominent sites across Assam.

The 43-year-old King was accompanied by the Royal Bhutan Ambassador Major General Vetsop Namgyel and a delegation of senior members of the royal office.

The Chief Minister's directive highlights the significance of strengthening the Assam-Bhutan relationship through improved infrastructure and enhanced connectivity, paving the way for increased trade, tourism, and cultural exchange between the two neighboring states.

In a move to enhance connectivity and foster economic growth between Assam and Bhutan, Chief Minister Himanta Biswa Sarma has directed officials to prioritize the maintenance and repair of roads linking the two states. Sarma, who also holds the Public Works Department (PWD) portfolio, reviewed various ongoing and proposed road projects connecting Assam and Bhutan during a meeting with senior department officials. To assess the condition of highways and roads connecting Assam and Bhutan, Chief Minister Dr. @himantabiswa held a meeting with PWD officials and other concerned officials, the Chief Minister's Office stated in a social media post. The Chief Minister emphasized the importance of maintaining and upgrading the road infrastructure to facilitate seamless transportation and promote tourism and economic activities between the two regions. This initiative comes on the heels of the recent visit by Bhutan King Jigme Khesar Namgyal Wangchuk to Assam, marking the first time the monarch has traveled to the state. During his three-day tour, which began on November 3, the King visited several prominent sites across Assam. The 43-year-old King was accompanied by the Royal Bhutan Ambassador Major General Vetsop Namgyel and a delegation of senior members of the royal office. The Chief Minister's directive highlights the significance of strengthening the Assam-Bhutan relationship through improved infrastructure and enhanced connectivity, paving the way for increased trade, tourism, and cultural exchange between the two neighboring states.

Next Story
Infrastructure Urban

Welspun Enterprises Wins 910 MLD Panjrapur WTP Contract

Welspun Enterprises (WEL), the infrastructure and energy arm of Welspun World, has secured a major contract from the Brihanmumbai Municipal Corporation (BMC) to design, build and operate a 910 million litres per day (MLD) Water Treatment Plant (WTP) at Panjrapur, Maharashtra.Valued at approximately Rs 31.45 billion, the project encompasses end-to-end civil, mechanical, electrical and instrumentation works, including the construction of a treated water sump and pumping station. Of the total value, nearly Rs 11.56 billion is allocated to Operations & Maintenance (O&M), with an additional..

Next Story
Infrastructure Energy

Mitsubishi Power Wins Boiler Upgrade Contract for O Mon 1 Plant

Mitsubishi Power, a power solutions brand of Mitsubishi Heavy Industries, (MHI), has been awarded a contract to support the oil-to-natural-gas fuel conversion at the O Mon 1 Thermal Power Plant in Can Tho, southern Vietnam. As the OEM of the plant’s existing boiler, Mitsubishi Power will supply key equipment—including new gas burners—and implement a selective catalytic reduction (SCR) system to reduce NOx emissions and help the plant meet stricter environmental standards.The O Mon 1 facility includes two 330 MW units that commenced operations in 2009 and 2015, with all major equipment or..

Next Story
Equipment

Liebherr’s 10,000th XPower Wheel Loader Joins BERGER’s Fleet

BERGER Rohstoffe GmbH has welcomed the 10,000th Liebherr XPower wheel loader to its operations at the Schlag granite quarry in Passau. The milestone machine, officially handed over at Liebherr’s Bischofshofen plant in May 2025, underscores the long-standing partnership between BERGER, Liebherr, and the Beutlhauser Group. Equipped with Liebherr’s signature power-split travel drive, the new L 580 XPower is already delivering strong results under demanding quarry conditions.At the Schlag quarry, BERGER Rohstoffe processes approximately 200,000 tonnes of Bayerwald granite annually into high-qu..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement