Rs. 11 mn Infrastructure Plan Prepared for Attukal Pongala
ECONOMY & POLICY

Rs. 11 mn Infrastructure Plan Prepared for Attukal Pongala

Thiruvananthapuram is set to undertake infrastructure upgrades and sanitation works ahead of the Attukal Pongala festival, scheduled for February 22, 2027. The preparations are intended to improve civic facilities and manage the expected arrival of devotees at the Attukal Bhagavathy Temple.

Projects valued at Rs. 11 mn have been prepared for development works across 11 corporation divisions under the Vattiyoorkavu assembly constituency. The proposed works cover Kesavadasapuram, Peroorkada, Gowreesapattom, Kuravankonam, Sasthamangalam, Muttada, Kannanmoola, Pangode, Nanthancode, Pattom and Kunnukuzhy.

Health Minister K Muraleedharan, who is also the Vattiyoorkavu MLA, has requested special administrative sanction for the project from Chief Minister V D Satheesan. The request was made in view of the urgency of completing the works before the annual festival.

The plan includes cleaning and managing drains, raising the level of earthen roads, constructing new drains, elevating drain covers and installing additional covers. The detailed project report was prepared under the supervision of the executive engineer of the Pattoor division of the Kerala Water Authority.

The initiative follows the accumulation of soil and debris in low-lying areas across several divisions. During the rainy season, the material has contributed to the inflow of contaminated water, affecting residents’ health and living conditions. The proposed interventions are intended to improve drainage, cleanliness and the local environment before the festival.

Officials expect the works to benefit approximately 5,000 residents directly while also improving conditions for devotees visiting the Pongala. The festival preparations form part of wider efforts to strengthen sanitation and public infrastructure in areas connected to the constituency.

Thiruvananthapuram is set to undertake infrastructure upgrades and sanitation works ahead of the Attukal Pongala festival, scheduled for February 22, 2027. The preparations are intended to improve civic facilities and manage the expected arrival of devotees at the Attukal Bhagavathy Temple. Projects valued at Rs. 11 mn have been prepared for development works across 11 corporation divisions under the Vattiyoorkavu assembly constituency. The proposed works cover Kesavadasapuram, Peroorkada, Gowreesapattom, Kuravankonam, Sasthamangalam, Muttada, Kannanmoola, Pangode, Nanthancode, Pattom and Kunnukuzhy. Health Minister K Muraleedharan, who is also the Vattiyoorkavu MLA, has requested special administrative sanction for the project from Chief Minister V D Satheesan. The request was made in view of the urgency of completing the works before the annual festival. The plan includes cleaning and managing drains, raising the level of earthen roads, constructing new drains, elevating drain covers and installing additional covers. The detailed project report was prepared under the supervision of the executive engineer of the Pattoor division of the Kerala Water Authority. The initiative follows the accumulation of soil and debris in low-lying areas across several divisions. During the rainy season, the material has contributed to the inflow of contaminated water, affecting residents’ health and living conditions. The proposed interventions are intended to improve drainage, cleanliness and the local environment before the festival. Officials expect the works to benefit approximately 5,000 residents directly while also improving conditions for devotees visiting the Pongala. The festival preparations form part of wider efforts to strengthen sanitation and public infrastructure in areas connected to the constituency.

Related Stories

Gold Stories

Next Story
Infrastructure Energy

DMRC Invites Bids for Solar-Linked BESS Power Procurement

Delhi Metro Rail Corporation (DMRC) has invited bids for renewable energy from an Inter-State Transmission System (ISTS)-connected generating plant combining a solar photovoltaic (PV) system with a co-located Battery Energy Storage System (BESS). The procurement will be conducted through competitive bidding followed by an e-reverse auction. The last date for submitting online bids is December 10, 2026, at 3 PM. DMRC will open the technical bids on December 11, 2026, at 3 PM. The opening of financial bids and the e-reverse auction will be scheduled after completion of the technical evaluation. ..

Next Story
Infrastructure Energy

Solar Growth May Slow Beyond FY28 on Awards, Grid Constraints

India’s solar capacity growth could face headwinds beyond FY28 as slower renewable energy project awards, delays in signing power agreements and transmission constraints threaten expansion, according to a report by Yes Securities. Near-term additions remain supported by a construction pipeline exceeding 150 GW and rising rooftop installations, but weaker award activity could affect capacity additions and industry volumes in FY29 and FY30. Solar capacity additions nearly doubled to 44.61 GW in FY26 from 23.83 GW in FY25. Installations remained strong in the first half of FY27, when 21 GW of s..

Next Story
Infrastructure Transport

India’s First High-Speed Rail Service to Begin in 2027

India’s first high-speed rail service will commence in 2027, with the Surat-Vapi section of the Mumbai-Ahmedabad High-Speed Rail corridor scheduled to open first, Railway Minister Ashwini Vaishnaw said. The remaining sections to Mumbai will be opened in phases. Vaishnaw said 456 km of pier work and 371 km of viaduct construction had been completed by September. About 600,000 noise barriers had been installed along a 299 km stretch, while 9,300 overhead equipment masts had been erected across a 206 km viaduct. Four mountain tunnels have been excavated, and 5 km of the 21 km Maharashtra tunnel..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code