Interarch Building Solutions Secures Rs 830 mn Energy Project Order
Steel

Interarch Building Solutions Secures Rs 830 mn Energy Project Order

Interarch Building Solutions Limited has secured a domestic order for the supply of pre-engineered steel building systems for a major energy transmission project. The company said the name of the customer cannot be disclosed owing to commercial reasons and cited confidentiality constraints in its disclosure. The announcement was made through a regulatory filing under Regulation 30 of the SEBI Listing Regulations and the SEBI master circular dated 30 January 2026.

The contract covers complete design, engineering, manufacturing and supply of the pre-engineered steel building system, with the company responsible for end-to-end delivery. The order is classified as domestic and is intended to support infrastructure works associated with energy transmission. The filing specifies an execution period of approximately 16 months for completion of the contract.

The broad commercial consideration for the contract is approximately Rs 830 million (mn) including taxes, converted from the originally stated figure in crores for clarity. An advance payment of 10 per cent is payable as part of the contract terms disclosed in the filing. The company did not provide further financial breakdowns in the public disclosure because of commercial sensitivity.

The disclosure confirmed that neither the promoter nor the promoter group has any interest in the customer entity and that the contract does not constitute a related party transaction, with related party applicability marked as not applicable in the filing. The company described the order as a standard commercial engagement conducted on an arm's length basis. No additional parties or promoter links were identified in the documentation.

Interarch Building Solutions Limited, formerly known as Interarch Building Products Limited, provided its registered and head office details in the filing and reiterated compliance with listing obligations and disclosure requirements. The regulatory disclosure records the principal terms of the contract and the company will report progress through subsequent filings as required. The company positioned the order as part of its ongoing activity in engineered steel building systems for infrastructure projects.

Interarch Building Solutions Limited has secured a domestic order for the supply of pre-engineered steel building systems for a major energy transmission project. The company said the name of the customer cannot be disclosed owing to commercial reasons and cited confidentiality constraints in its disclosure. The announcement was made through a regulatory filing under Regulation 30 of the SEBI Listing Regulations and the SEBI master circular dated 30 January 2026. The contract covers complete design, engineering, manufacturing and supply of the pre-engineered steel building system, with the company responsible for end-to-end delivery. The order is classified as domestic and is intended to support infrastructure works associated with energy transmission. The filing specifies an execution period of approximately 16 months for completion of the contract. The broad commercial consideration for the contract is approximately Rs 830 million (mn) including taxes, converted from the originally stated figure in crores for clarity. An advance payment of 10 per cent is payable as part of the contract terms disclosed in the filing. The company did not provide further financial breakdowns in the public disclosure because of commercial sensitivity. The disclosure confirmed that neither the promoter nor the promoter group has any interest in the customer entity and that the contract does not constitute a related party transaction, with related party applicability marked as not applicable in the filing. The company described the order as a standard commercial engagement conducted on an arm's length basis. No additional parties or promoter links were identified in the documentation. Interarch Building Solutions Limited, formerly known as Interarch Building Products Limited, provided its registered and head office details in the filing and reiterated compliance with listing obligations and disclosure requirements. The regulatory disclosure records the principal terms of the contract and the company will report progress through subsequent filings as required. The company positioned the order as part of its ongoing activity in engineered steel building systems for infrastructure projects.

Next Story
Real Estate

BXB Estates Sets AED 110 Million Jumeirah Golf Estates Record

BXB Estates has completed an AED 110 million residential transaction at Jumeirah Golf Estates, setting a new sales record for the prestigious Dubai residential community.Negotiated by Alfie Tabrez, Managing Partner of BXB Estates, the deal surpassed the previous record of AED 58 million for a completed ready villa in the development.The six-bedroom residence offers 21,714 sq ft of built-up space on a 15,873-sq-ft plot. It features nine bathrooms, four living lounges, a home office, bar lounge, private cinema and rooftop terrace.The property also includes a dedicated wellness area comprising a ..

Next Story
Infrastructure Urban

SECR Floats Rs 6,019 Mn EPC Tender For Paradol Nagpur Link

South East Central Railway (SECR) has invited bids for an Engineering, Procurement and Construction (EPC) contract to build a new broad gauge single line between Paradol Takeoff Point and Nagpur Road Station in Chhattisgarh. The contract carries an estimated cost of Rs 6,019.0 mn and requires an earnest money deposit of Rs 120.4 mn. The work is framed as an EPC assignment intended to strengthen regional rail infrastructure. The tender, issued under number CAO-C-BSP-26-27-15, specifies a completion period of 730 days and a bid validity of 180 days. Two pre-bid meetings are scheduled for 24 Augu..

Next Story
Infrastructure Transport

Indian Railways Reports Nine Per Cent Rise In July Freight Loading

Indian Railways handled 141.3 million tonnes (141.3 mn t) of freight in July, marking a rise of nine per cent year on year. Freight loading maintained a positive trajectory across the network compared with the same month last year. Passenger traffic also increased in July, contributing to higher overall network utilisation. The July outcome continued a pattern of steady monthly gains, reflecting gradual improvement in industrial and logistics activity. The growth in freight volumes reflected stronger demand across multiple sectors and improvements in logistics and train turnarounds. Enhanced r..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement