+
Tiruchy Airport installs simple approach lighting system
AVIATION & AIRPORTS

Tiruchy Airport installs simple approach lighting system

The Tiruchy International Airport has installed a simple approach lighting system on the vacant land beside the Tiruchy-Pudukottai National Highway to upgrade the safety of the runway.

According to officials, the lighting system helps in identifying the runway boundary. The system will be installed at Rs 42.79 lakh, and it will further boost the safety of the runway - specifically the portion facing the NH, by providing safe aircraft landing during extreme weather conditions.

The airport got approximately 5.9 acres of land on the Pudukottai side from the government. Now, the airport has a Category-I landing system at the runway portion on the Kottapattu side and a simple approach lighting system on the Pudukottai side.

The CAT-I landing system at Kottapattu or Bharat Heavy Electricals Limited (BHEL) side can provide a safe landing even during the visibility of not less than 800 metres of runway visual range, not less than 550 metres. This system is adequate for ensuring the safe landing of an aircraft during the harsh weather conditions at our airport.

Sources said that the acquisition process for the runway development is also going on in a fast-track manner.

The airport requires approximately 300 acres of land for runway development. So far, about 25 acres of land have been acquired. The district administration and the State government are trying their best to speed up the acquisition works for the leftover land.

Many travel agents also expressed hopes of attracting more operators to Tiruchy with the construction work of the new terminal anticipated to be finished by April 2023.

A major travel agent in Tiruchy, N Ramesh, told the media that the new terminal construction, up-gradation of the runway safety, and other projects would improve the operations from Tiruchy. But, the major problem is that this will all be a great loss if the government hands over this airport to private players as they would get its advantage. The central government should drop the privatisation plan of Tiruchy airport.

Image Source

Also read: New passenger terminal at Trichy Airport to be ready by April 2023

The Tiruchy International Airport has installed a simple approach lighting system on the vacant land beside the Tiruchy-Pudukottai National Highway to upgrade the safety of the runway. According to officials, the lighting system helps in identifying the runway boundary. The system will be installed at Rs 42.79 lakh, and it will further boost the safety of the runway - specifically the portion facing the NH, by providing safe aircraft landing during extreme weather conditions. The airport got approximately 5.9 acres of land on the Pudukottai side from the government. Now, the airport has a Category-I landing system at the runway portion on the Kottapattu side and a simple approach lighting system on the Pudukottai side. The CAT-I landing system at Kottapattu or Bharat Heavy Electricals Limited (BHEL) side can provide a safe landing even during the visibility of not less than 800 metres of runway visual range, not less than 550 metres. This system is adequate for ensuring the safe landing of an aircraft during the harsh weather conditions at our airport. Sources said that the acquisition process for the runway development is also going on in a fast-track manner. The airport requires approximately 300 acres of land for runway development. So far, about 25 acres of land have been acquired. The district administration and the State government are trying their best to speed up the acquisition works for the leftover land. Many travel agents also expressed hopes of attracting more operators to Tiruchy with the construction work of the new terminal anticipated to be finished by April 2023. A major travel agent in Tiruchy, N Ramesh, told the media that the new terminal construction, up-gradation of the runway safety, and other projects would improve the operations from Tiruchy. But, the major problem is that this will all be a great loss if the government hands over this airport to private players as they would get its advantage. The central government should drop the privatisation plan of Tiruchy airport. Image Source Also read: New passenger terminal at Trichy Airport to be ready by April 2023

Next Story
Real Estate

DLF Returns to Mumbai with Premium Andheri Residential Project

Delhi-NCR based real estate major DLF announced its return to the Mumbai market on 17 July with the launch of its premium residential project, The WestPark, in Andheri. The first phase includes 416 apartments spread across four towers, with two towers launched on the announcement day. The company plans to invest over Rs 8 billion in the project and expects a topline exceeding Rs 20 billion from Phase 1.“We have launched two towers and, given the strong response, plan to unveil the remaining two towers ahead of schedule, within the next few days,” said Aakash Ohri, Joint Managing Director o..

Next Story
Infrastructure Urban

APCRDA Advances Net Zero Goal with IGBC Training for Officials

In a significant stride towards Andhra Pradesh’s Net Zero target by 2040 and the Swarna Andhra 2047 vision, the Andhra Pradesh Capital Region Development Authority (APCRDA), in partnership with the Indian Green Building Council (IGBC), conducted a high-level capacity-building programme for senior officials in Vijayawada on Friday.Held at a city hotel, the session saw the participation of over 50 senior APCRDA officials, including the Engineer-in-Chief, Chief Engineer (H&B), Director (Planning), Director (Environment), and heads of key departments. The training centred on IGBC’s Green B..

Next Story
Infrastructure Energy

Assam Solar Project Halted as Waaree EPC Contract Is Cancelled

Following the Assam government’s withdrawal from its proposed solar project, the Engineering, Procurement, and Construction (EPC) contract awarded to Waaree Renewable has been suspended. Waaree Group’s EPC division informed the stock exchange of this development through a regulatory filing.The Assam solar project was suspended due to funding challenges, which rendered the initiative unviable for the state government. Waaree Renewable Transmission Limited (RTL) explained that the Government of Assam has withdrawn the project’s funding via the Asian Development Bank (ADB) loan. Consequentl..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?