Bengaluru-Mysuru Expressway to Deploy Intelligent Traffic System
ROADS & HIGHWAYS

Bengaluru-Mysuru Expressway to Deploy Intelligent Traffic System

From July 1 onwards, the Bengaluru-Mysuru Expressway is set to introduce an intelligent traffic management system aimed at improving traffic flow and safety along the route. The implementation marks a significant upgrade in infrastructure to cater to the increasing traffic demands between the two cities.

The intelligent traffic management system will leverage modern technology to monitor and regulate traffic, including real-time data analysis to optimise traffic signals and manage congestion effectively. This initiative is expected to reduce travel time, enhance commuter convenience, and minimise road accidents on the expressway.

Key features of the system include automated traffic monitoring, dynamic signal control based on traffic volumes, and integration with emergency response mechanisms to ensure swift assistance in case of incidents. These advancements are poised to elevate the overall commuting experience for travellers between Bengaluru and Mysuru.

The deployment of the intelligent traffic system underscores Karnataka's commitment to leveraging technology for efficient urban planning and transportation management. It reflects efforts to align infrastructure development with sustainable growth objectives, promoting smoother mobility and economic connectivity in the region.

As the implementation date approaches, stakeholders anticipate positive outcomes from the new traffic management system, contributing to enhanced road safety, reduced travel times, and improved overall traffic efficiency on the Bengaluru-Mysuru Expressway.

From July 1 onwards, the Bengaluru-Mysuru Expressway is set to introduce an intelligent traffic management system aimed at improving traffic flow and safety along the route. The implementation marks a significant upgrade in infrastructure to cater to the increasing traffic demands between the two cities. The intelligent traffic management system will leverage modern technology to monitor and regulate traffic, including real-time data analysis to optimise traffic signals and manage congestion effectively. This initiative is expected to reduce travel time, enhance commuter convenience, and minimise road accidents on the expressway. Key features of the system include automated traffic monitoring, dynamic signal control based on traffic volumes, and integration with emergency response mechanisms to ensure swift assistance in case of incidents. These advancements are poised to elevate the overall commuting experience for travellers between Bengaluru and Mysuru. The deployment of the intelligent traffic system underscores Karnataka's commitment to leveraging technology for efficient urban planning and transportation management. It reflects efforts to align infrastructure development with sustainable growth objectives, promoting smoother mobility and economic connectivity in the region. As the implementation date approaches, stakeholders anticipate positive outcomes from the new traffic management system, contributing to enhanced road safety, reduced travel times, and improved overall traffic efficiency on the Bengaluru-Mysuru Expressway.

Next Story
Infrastructure Transport

BMC Gets CRZ Nod For Rs 40 Million Gorai Bridge Rebuild

The Brihanmumbai Municipal Corporation (BMC) has secured Coastal Regulation Zone (CRZ) clearance for the reconstruction of the Poisar River bridge in Gorai, located in Mumbai’s western suburbs. However, the proposed demolition of the existing 100-metre bridge has sparked opposition from local residents, who claim it serves as the only direct access route between the Lower and Upper Koliwada areas. The three-decade-old bridge, situated within the CRZ buffer zone, was recently declared structurally unsafe following a civic audit. The BMC has sanctioned its reconstruction at an estimated cost ..

Next Story
Infrastructure Transport

NHAI Completes Rs 15.9 Billion Four-Lane Stretch On ECR

The National Highways Authority of India (NHAI) has completed the four-laning of the 38 km Puducherry–Poondiyankuppam stretch, ending near Cuddalore, in a development that will cut travel time by up to two hours, according to a report by The New Indian Express. The upgraded section, built at a cost of Rs 15.9 billion under the Bharatmala Pariyojana Phase I, marks a major milestone in the ongoing East Coast Road (ECR) widening programme. The project promises a smoother, faster drive for motorists travelling towards Cuddalore, Chidambaram, Sirkazhi, and Nagapattinam. With this completion, 22..

Next Story
Infrastructure Transport

Encroachments Delay Rs 1 Billion Ghatkopar Bridge Project

The construction of a new cable-stayed rail overbridge at Ghatkopar and the widening of the Andheri–Ghatkopar Link Road (AGLR) have been delayed due to the presence of nearly 250 encroached structures on both sides of the road. In response, Municipal Commissioner Bhushan Gagrani has directed officials to carry out a structural audit of the existing bridge over the railway line and enforce temporary restrictions on heavy vehicles to ensure public safety. The bridge, which starts at the Golibar Road junction near LBS Marg and extends up to the Eastern Express Highway (EEH), serves as a critic..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?