+
Cabinet clears Rs 69.69 billion Barabanki-Bahraich highway
ROADS & HIGHWAYS

Cabinet clears Rs 69.69 billion Barabanki-Bahraich highway

The Union Cabinet has approved the construction of a 4-lane stretch of National Highway-927 connecting Barabanki and Bahraich in Uttar Pradesh, with an estimated cost of Rs 69.69 billion.

The 101.5-km project forms part of the larger Lucknow–Rupaidiha corridor and will be developed under the Hybrid Annuity Model (HAM). The proposed upgrade aims to significantly improve road infrastructure and ease traffic movement across the region.

According to officials from the Ministry of Road Transport and Highways, the existing Barabanki-Bahraich stretch faces several challenges, including geometric shortcomings, sharp curves, and congestion in densely populated areas. The new design will address these issues by introducing an access-controlled 4-lane highway with continuous service roads.

The upgraded highway will bypass major settlements, helping decongest urban stretches while increasing average travel speeds. Once completed, the travel time between Barabanki and Bahraich is expected to be reduced to nearly one hour.

Officials highlighted the strategic importance of the project, noting that it will strengthen cross-border trade and transit between India and Nepal. The corridor will provide improved connectivity to the Nepalgunj border and enhance access to the Rupaidiha Land Port, a key trade gateway.

Additionally, the highway is expected to improve connectivity to remote districts such as Bahraich and Shravasti, supporting regional economic development and better integration with national transport networks.

The Union Cabinet has approved the construction of a 4-lane stretch of National Highway-927 connecting Barabanki and Bahraich in Uttar Pradesh, with an estimated cost of Rs 69.69 billion.The 101.5-km project forms part of the larger Lucknow–Rupaidiha corridor and will be developed under the Hybrid Annuity Model (HAM). The proposed upgrade aims to significantly improve road infrastructure and ease traffic movement across the region.According to officials from the Ministry of Road Transport and Highways, the existing Barabanki-Bahraich stretch faces several challenges, including geometric shortcomings, sharp curves, and congestion in densely populated areas. The new design will address these issues by introducing an access-controlled 4-lane highway with continuous service roads.The upgraded highway will bypass major settlements, helping decongest urban stretches while increasing average travel speeds. Once completed, the travel time between Barabanki and Bahraich is expected to be reduced to nearly one hour.Officials highlighted the strategic importance of the project, noting that it will strengthen cross-border trade and transit between India and Nepal. The corridor will provide improved connectivity to the Nepalgunj border and enhance access to the Rupaidiha Land Port, a key trade gateway.Additionally, the highway is expected to improve connectivity to remote districts such as Bahraich and Shravasti, supporting regional economic development and better integration with national transport networks.

Related Stories

Gold Stories

Next Story
Infrastructure Transport

Mumbai-Ahmedabad Bullet Train’s Surat-Vapi Section Set for 2027

The first section of the Mumbai-Ahmedabad Bullet Train corridor, linking Surat and Vapi, is targeted to begin services in 2027. Construction is expected to be completed by December 2026, while Railway Minister Ashwini Vaishnaw has indicated that an inauguration could take place around the middle of 2027. The National High Speed Rail Corporation (NHSRCL) said the train being manufactured in India is expected to reach the tracks around April or May 2027. The train will undergo extensive testing before the section is opened for passenger services. The project began construction in 2021 and includ..

Next Story
Infrastructure Transport

Indian Railways Approves Four Projects Worth Rs. 7.36 bn Across Four States

Indian Railways has approved four projects with a combined value of Rs. 7.36 bn across Uttar Pradesh, Maharashtra, Andhra Pradesh and Gujarat. The programme covers train protection, signalling, electric traction supply and a road overbridge, with each project assigned to a different railway zone. In Uttar Pradesh, Rs. 2.52 bn has been approved to extend the Kavach 4.0 automatic train protection system across 607.7 km in the Lucknow Division of North Eastern Railway. The system monitors train movements and can apply the brakes if a driver fails to observe a signal or exceeds a safe speed. The w..

Next Story
Infrastructure Urban

Chandru Raheja Sells 1.49% Stake in Mindspace REIT for Rs. 5 bn

Billionaire Chandru Lachmandas Raheja has sold a 1.49 per cent holding in Mindspace Business Parks REIT for Rs. 5 bn through a bulk deal on the BSE. The transaction involved 9.9 mn units and was executed at an average price of Rs. 505 per unit, according to exchange data. Following the sale, units of Mindspace Business Parks REIT were trading 0.18 per cent lower at Rs. 504.05 on Tuesday. Exchange data did not identify the buyers involved in the transaction. Raheja is the chairman of real estate company K Raheja Corp. The sale involved 99,00,990 units, representing 1.49 per cent of the Mumbai-b..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code