Chennai To Upgrade Civic Infrastructure In Three Industrial Estates
ROADS & HIGHWAYS

Chennai To Upgrade Civic Infrastructure In Three Industrial Estates

The Greater Chennai Corporation (GCC) will upgrade civic infrastructure across about 90 km in three industrial estates in the city, covering Ambattur, Guindy and Vyasarpadi. The project is divided roughly into 50 km in the Ambattur Industrial Estate, 20 km in Guindy and 20 km in the Vyasarpadi Cooperative Industrial Estate, the GCC Bus Route Roads department said. As a first step, GCC will float tenders to appoint a consultant to prepare a detailed project report. The scheme covers roads, stormwater drains, footpaths and streetlights.

The appointed consultant will conduct a detailed survey of the three estates to assess infrastructure requirements and to prepare estimates and a phased implementation plan. The survey scope will include carriageways, footpaths, stormwater drains, streetlighting, solid waste management and other essential services, with priorities set on connectivity and drainage resilience. Based on the survey findings, the consultant will draft technical specifications, cost estimates and a schedule for phased execution to enable the GCC to invite construction tenders.

The upgrade in Ambattur and Guindy follows a memorandum of understanding signed earlier this year between the GCC and the Tamil Nadu Small Industries Development Corporation, under which the civic body assumed maintenance responsibility for roads, streetlights, stormwater drains and solid waste management in those two estates for 30 years. Vyasarpadi’s inclusion responds to long standing requests from workers and industrial stakeholders in the cooperative estate, which falls in the Perambur assembly constituency represented by Chief Minister C Joseph Vijay.

GCC officials said bringing the three estates under a single project will streamline maintenance and improve service delivery for industrial units that depend on reliable civic infrastructure. The corporation will phase works to limit disruption to industrial activity and to allow timely handover of completed stretches. Procurement for consultants and contractors will follow the statutory tendering process and implementation will be monitored by the civic administration.

The Greater Chennai Corporation (GCC) will upgrade civic infrastructure across about 90 km in three industrial estates in the city, covering Ambattur, Guindy and Vyasarpadi. The project is divided roughly into 50 km in the Ambattur Industrial Estate, 20 km in Guindy and 20 km in the Vyasarpadi Cooperative Industrial Estate, the GCC Bus Route Roads department said. As a first step, GCC will float tenders to appoint a consultant to prepare a detailed project report. The scheme covers roads, stormwater drains, footpaths and streetlights. The appointed consultant will conduct a detailed survey of the three estates to assess infrastructure requirements and to prepare estimates and a phased implementation plan. The survey scope will include carriageways, footpaths, stormwater drains, streetlighting, solid waste management and other essential services, with priorities set on connectivity and drainage resilience. Based on the survey findings, the consultant will draft technical specifications, cost estimates and a schedule for phased execution to enable the GCC to invite construction tenders. The upgrade in Ambattur and Guindy follows a memorandum of understanding signed earlier this year between the GCC and the Tamil Nadu Small Industries Development Corporation, under which the civic body assumed maintenance responsibility for roads, streetlights, stormwater drains and solid waste management in those two estates for 30 years. Vyasarpadi’s inclusion responds to long standing requests from workers and industrial stakeholders in the cooperative estate, which falls in the Perambur assembly constituency represented by Chief Minister C Joseph Vijay. GCC officials said bringing the three estates under a single project will streamline maintenance and improve service delivery for industrial units that depend on reliable civic infrastructure. The corporation will phase works to limit disruption to industrial activity and to allow timely handover of completed stretches. Procurement for consultants and contractors will follow the statutory tendering process and implementation will be monitored by the civic administration.

Next Story
Real Estate

BXB Estates Sets AED 110 Million Jumeirah Golf Estates Record

BXB Estates has completed an AED 110 million residential transaction at Jumeirah Golf Estates, setting a new sales record for the prestigious Dubai residential community.Negotiated by Alfie Tabrez, Managing Partner of BXB Estates, the deal surpassed the previous record of AED 58 million for a completed ready villa in the development.The six-bedroom residence offers 21,714 sq ft of built-up space on a 15,873-sq-ft plot. It features nine bathrooms, four living lounges, a home office, bar lounge, private cinema and rooftop terrace.The property also includes a dedicated wellness area comprising a ..

Next Story
Infrastructure Urban

SECR Floats Rs 6,019 Mn EPC Tender For Paradol Nagpur Link

South East Central Railway (SECR) has invited bids for an Engineering, Procurement and Construction (EPC) contract to build a new broad gauge single line between Paradol Takeoff Point and Nagpur Road Station in Chhattisgarh. The contract carries an estimated cost of Rs 6,019.0 mn and requires an earnest money deposit of Rs 120.4 mn. The work is framed as an EPC assignment intended to strengthen regional rail infrastructure. The tender, issued under number CAO-C-BSP-26-27-15, specifies a completion period of 730 days and a bid validity of 180 days. Two pre-bid meetings are scheduled for 24 Augu..

Next Story
Infrastructure Transport

Indian Railways Reports Nine Per Cent Rise In July Freight Loading

Indian Railways handled 141.3 million tonnes (141.3 mn t) of freight in July, marking a rise of nine per cent year on year. Freight loading maintained a positive trajectory across the network compared with the same month last year. Passenger traffic also increased in July, contributing to higher overall network utilisation. The July outcome continued a pattern of steady monthly gains, reflecting gradual improvement in industrial and logistics activity. The growth in freight volumes reflected stronger demand across multiple sectors and improvements in logistics and train turnarounds. Enhanced r..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement