Expansion And Upgradation Of National Highways
ROADS & HIGHWAYS

Expansion And Upgradation Of National Highways

The Ministry of Road Transport and Highways has reported a sustained expansion of the national highway network, which has increased from 91,287 km in March, 2014 to 146,572 km at present. The ministry remains responsible for development and maintenance of National High Speed Corridors (HSCs) and expressways and directs capacity augmentation according to traffic density, connectivity needs and the PM GatiShakti National Master Plan.

Operational access controlled National High Speed Corridors and expressways have risen from 93 km in 2014 to 3,052 km at present, while the length of four-lane and above highways has increased by 2.6 times from 18,371 km to 48,568 km. The share of less than two-lane highways has fallen from 30 per cent in 2014 to nine per cent of the total network, improving connectivity for urban, rural and industrial regions and enhancing logistics efficiency.

A study by the Indian Institute of Management, Bangalore found that every one-rupee expenditure in national highway development leads to a Rs three point two increase in Gross Domestic Product (GDP). The study also reported a nine point nineteen per cent reduction in transport time between factories and suppliers, a four point ninety three per cent reduction between factories and customers, and a 16.6 per cent reduction in time to access schools. Reductions of nine per cent in time to access health services and seven per cent in time to reach mandis were noted, while the average number of mandis accessed increased by eight per cent.

An estimation by the Indian Institute of Technology, Kanpur indicated that construction of one lane-km of national highway generates 4,478 person-days of direct employment and 5,297 person-days of indirect employment, with an induced effect of 52,393 person-days per lane-km over a period of seven years. The government constructed 57,125 km of national highways in the last five years with average construction of 34,215 lane-km per year, yielding average annual employment generation of about 330 million (mn) person-days including direct and indirect employment.

The government has targeted operationalising 18,000 km of access controlled National HSCs and expressways by 2028-29 and aims to award 26,000 km by 2032-33, alongside priority development of ring roads, city bypasses for urban centres with populations above 0.5 million (mn), port links and connectivity to industrial nodes. The ministry emphasised that last-mile connectivity to agricultural centres, schools and health care facilities remains the responsibility of state governments, and the information was provided in a written reply to the Rajya Sabha.

The Ministry of Road Transport and Highways has reported a sustained expansion of the national highway network, which has increased from 91,287 km in March, 2014 to 146,572 km at present. The ministry remains responsible for development and maintenance of National High Speed Corridors (HSCs) and expressways and directs capacity augmentation according to traffic density, connectivity needs and the PM GatiShakti National Master Plan. Operational access controlled National High Speed Corridors and expressways have risen from 93 km in 2014 to 3,052 km at present, while the length of four-lane and above highways has increased by 2.6 times from 18,371 km to 48,568 km. The share of less than two-lane highways has fallen from 30 per cent in 2014 to nine per cent of the total network, improving connectivity for urban, rural and industrial regions and enhancing logistics efficiency. A study by the Indian Institute of Management, Bangalore found that every one-rupee expenditure in national highway development leads to a Rs three point two increase in Gross Domestic Product (GDP). The study also reported a nine point nineteen per cent reduction in transport time between factories and suppliers, a four point ninety three per cent reduction between factories and customers, and a 16.6 per cent reduction in time to access schools. Reductions of nine per cent in time to access health services and seven per cent in time to reach mandis were noted, while the average number of mandis accessed increased by eight per cent. An estimation by the Indian Institute of Technology, Kanpur indicated that construction of one lane-km of national highway generates 4,478 person-days of direct employment and 5,297 person-days of indirect employment, with an induced effect of 52,393 person-days per lane-km over a period of seven years. The government constructed 57,125 km of national highways in the last five years with average construction of 34,215 lane-km per year, yielding average annual employment generation of about 330 million (mn) person-days including direct and indirect employment. The government has targeted operationalising 18,000 km of access controlled National HSCs and expressways by 2028-29 and aims to award 26,000 km by 2032-33, alongside priority development of ring roads, city bypasses for urban centres with populations above 0.5 million (mn), port links and connectivity to industrial nodes. The ministry emphasised that last-mile connectivity to agricultural centres, schools and health care facilities remains the responsibility of state governments, and the information was provided in a written reply to the Rajya Sabha.

Next Story
Infrastructure Transport

MMRDA advances 250 m on Orange Gate–Marine Drive tunnel

The Mumbai Metropolitan Region Development Authority (MMRDA) has completed 250 m of underground tunnelling for the Orange Gate–Marine Drive Urban Road Tunnel using India’s largest slurry shield tunnel boring machine (TBM) deployed for an urban road project.The project involves twin tunnels extending over 7 km beneath critical transport corridors, including Central Railway, Western Railway and Metro Line 3. The work requires high-precision engineering to navigate densely developed urban infrastructure.Once completed, the tunnel is expected to reduce travel time between Orange Gate and Marin..

Next Story
Infrastructure Urban

Hindustan Zinc Pays Rs 188.46 Billion in FY26

Hindustan Zinc contributed Rs 188.46 billion to the public exchequer in FY 2025-26, according to its 9th Tax Transparency Report. The contribution, equivalent to 46 per cent of the company’s revenue, included direct and indirect taxes, government royalties, dividends to the Government of India, withholding taxes and other statutory levies.The company’s five-year cumulative contribution to the exchequer stood at Rs 915.72 billion. In FY26, Hindustan Zinc reported revenue of Rs 408.44 billion, EBITDA of Rs 221.62 billion and profit after tax of Rs 138.32 billion. It also achieved its highest..

Next Story
Infrastructure Urban

World of Concrete India 2026 Opens in Mumbai

Informa Markets in India will host the 12th edition of World of Concrete India 2026 from 3–5 June 2026 at the Bombay Exhibition Centre, Mumbai. The specialised B2B exhibition will bring together manufacturers, suppliers, contractors, developers, architects, consultants, infrastructure companies, project leaders and government stakeholders.The event is expected to feature over 350 brands and more than 18,000 trade professionals. It will cover concrete and cement, dry mortar, precast technologies, formwork, construction chemicals, industrial and commercial flooring, scaffolding, safety solutio..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement