Expansion And Upgradation Of National Highways
ROADS & HIGHWAYS

Expansion And Upgradation Of National Highways

The Ministry of Road Transport and Highways has reported a sustained expansion of the national highway network, which has increased from 91,287 km in March, 2014 to 146,572 km at present. The ministry remains responsible for development and maintenance of National High Speed Corridors (HSCs) and expressways and directs capacity augmentation according to traffic density, connectivity needs and the PM GatiShakti National Master Plan.

Operational access controlled National High Speed Corridors and expressways have risen from 93 km in 2014 to 3,052 km at present, while the length of four-lane and above highways has increased by 2.6 times from 18,371 km to 48,568 km. The share of less than two-lane highways has fallen from 30 per cent in 2014 to nine per cent of the total network, improving connectivity for urban, rural and industrial regions and enhancing logistics efficiency.

A study by the Indian Institute of Management, Bangalore found that every one-rupee expenditure in national highway development leads to a Rs three point two increase in Gross Domestic Product (GDP). The study also reported a nine point nineteen per cent reduction in transport time between factories and suppliers, a four point ninety three per cent reduction between factories and customers, and a 16.6 per cent reduction in time to access schools. Reductions of nine per cent in time to access health services and seven per cent in time to reach mandis were noted, while the average number of mandis accessed increased by eight per cent.

An estimation by the Indian Institute of Technology, Kanpur indicated that construction of one lane-km of national highway generates 4,478 person-days of direct employment and 5,297 person-days of indirect employment, with an induced effect of 52,393 person-days per lane-km over a period of seven years. The government constructed 57,125 km of national highways in the last five years with average construction of 34,215 lane-km per year, yielding average annual employment generation of about 330 million (mn) person-days including direct and indirect employment.

The government has targeted operationalising 18,000 km of access controlled National HSCs and expressways by 2028-29 and aims to award 26,000 km by 2032-33, alongside priority development of ring roads, city bypasses for urban centres with populations above 0.5 million (mn), port links and connectivity to industrial nodes. The ministry emphasised that last-mile connectivity to agricultural centres, schools and health care facilities remains the responsibility of state governments, and the information was provided in a written reply to the Rajya Sabha.

The Ministry of Road Transport and Highways has reported a sustained expansion of the national highway network, which has increased from 91,287 km in March, 2014 to 146,572 km at present. The ministry remains responsible for development and maintenance of National High Speed Corridors (HSCs) and expressways and directs capacity augmentation according to traffic density, connectivity needs and the PM GatiShakti National Master Plan. Operational access controlled National High Speed Corridors and expressways have risen from 93 km in 2014 to 3,052 km at present, while the length of four-lane and above highways has increased by 2.6 times from 18,371 km to 48,568 km. The share of less than two-lane highways has fallen from 30 per cent in 2014 to nine per cent of the total network, improving connectivity for urban, rural and industrial regions and enhancing logistics efficiency. A study by the Indian Institute of Management, Bangalore found that every one-rupee expenditure in national highway development leads to a Rs three point two increase in Gross Domestic Product (GDP). The study also reported a nine point nineteen per cent reduction in transport time between factories and suppliers, a four point ninety three per cent reduction between factories and customers, and a 16.6 per cent reduction in time to access schools. Reductions of nine per cent in time to access health services and seven per cent in time to reach mandis were noted, while the average number of mandis accessed increased by eight per cent. An estimation by the Indian Institute of Technology, Kanpur indicated that construction of one lane-km of national highway generates 4,478 person-days of direct employment and 5,297 person-days of indirect employment, with an induced effect of 52,393 person-days per lane-km over a period of seven years. The government constructed 57,125 km of national highways in the last five years with average construction of 34,215 lane-km per year, yielding average annual employment generation of about 330 million (mn) person-days including direct and indirect employment. The government has targeted operationalising 18,000 km of access controlled National HSCs and expressways by 2028-29 and aims to award 26,000 km by 2032-33, alongside priority development of ring roads, city bypasses for urban centres with populations above 0.5 million (mn), port links and connectivity to industrial nodes. The ministry emphasised that last-mile connectivity to agricultural centres, schools and health care facilities remains the responsibility of state governments, and the information was provided in a written reply to the Rajya Sabha.

Next Story
Infrastructure Urban

Mineral Auction Rules Amended To Speed Mine Operationalisation

The Ministry of Mines notified the Mineral (Auction) Second Amendment Rules, 2026 on 30 March 2026 to accelerate operationalisation of mines and improve ease of doing business in the mining sector. The amendment follows a prior change to the Mineral (Auction) Rules, 2015 effected on 17 October 2025 that introduced intermediary timelines between issuance of a letter of intent (LoI) and execution of the mining lease. The 2025 change provided that one per cent of performance security would be appropriated for each month of delay by the preferred bidder and introduced incentives for early operatio..

Next Story
Infrastructure Transport

Indian Railways Strengthens Telecom And AI Safety Systems

Indian Railways strengthened its telecom and digital infrastructure during 2025-26 with the aim of improving safety, operational efficiency and the passenger experience. The programme promoted modernisation through advanced technologies, robust communication systems and passenger-centric solutions. These measures were presented as part of a drive to build a digitally integrated rail ecosystem. A key development was the enhancement of the Internet Protocol Multi-Protocol Label Switching (IP MPLS) backbone, commissioned at 1,396 stations to meet bandwidth needs of mission-critical applications. ..

Next Story
Infrastructure Transport

NHAI Holds Workshop on Litigation Management and Coordination

The National Highways Authority of India (NHAI) organised a day-long workshop in New Delhi to strengthen capacity and interdepartmental synergy for faster execution of national highway projects. The event was held under Mission Karmayogi – Sadhana Saptah, an initiative of the Government of India to enhance governance through capacity building and improved processes. The workshop focused on structured and solution oriented deliberations to address implementation constraints. The session was chaired by the NHAI chairman Santosh Kumar Yadav and brought together senior officials from NHAI, the M..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement