Expansion And Upgradation Of National Highways
ROADS & HIGHWAYS

Expansion And Upgradation Of National Highways

The Ministry of Road Transport and Highways has reported a sustained expansion of the national highway network, which has increased from 91,287 km in March, 2014 to 146,572 km at present. The ministry remains responsible for development and maintenance of National High Speed Corridors (HSCs) and expressways and directs capacity augmentation according to traffic density, connectivity needs and the PM GatiShakti National Master Plan.

Operational access controlled National High Speed Corridors and expressways have risen from 93 km in 2014 to 3,052 km at present, while the length of four-lane and above highways has increased by 2.6 times from 18,371 km to 48,568 km. The share of less than two-lane highways has fallen from 30 per cent in 2014 to nine per cent of the total network, improving connectivity for urban, rural and industrial regions and enhancing logistics efficiency.

A study by the Indian Institute of Management, Bangalore found that every one-rupee expenditure in national highway development leads to a Rs three point two increase in Gross Domestic Product (GDP). The study also reported a nine point nineteen per cent reduction in transport time between factories and suppliers, a four point ninety three per cent reduction between factories and customers, and a 16.6 per cent reduction in time to access schools. Reductions of nine per cent in time to access health services and seven per cent in time to reach mandis were noted, while the average number of mandis accessed increased by eight per cent.

An estimation by the Indian Institute of Technology, Kanpur indicated that construction of one lane-km of national highway generates 4,478 person-days of direct employment and 5,297 person-days of indirect employment, with an induced effect of 52,393 person-days per lane-km over a period of seven years. The government constructed 57,125 km of national highways in the last five years with average construction of 34,215 lane-km per year, yielding average annual employment generation of about 330 million (mn) person-days including direct and indirect employment.

The government has targeted operationalising 18,000 km of access controlled National HSCs and expressways by 2028-29 and aims to award 26,000 km by 2032-33, alongside priority development of ring roads, city bypasses for urban centres with populations above 0.5 million (mn), port links and connectivity to industrial nodes. The ministry emphasised that last-mile connectivity to agricultural centres, schools and health care facilities remains the responsibility of state governments, and the information was provided in a written reply to the Rajya Sabha.

"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

The Ministry of Road Transport and Highways has reported a sustained expansion of the national highway network, which has increased from 91,287 km in March, 2014 to 146,572 km at present. The ministry remains responsible for development and maintenance of National High Speed Corridors (HSCs) and expressways and directs capacity augmentation according to traffic density, connectivity needs and the PM GatiShakti National Master Plan. Operational access controlled National High Speed Corridors and expressways have risen from 93 km in 2014 to 3,052 km at present, while the length of four-lane and above highways has increased by 2.6 times from 18,371 km to 48,568 km. The share of less than two-lane highways has fallen from 30 per cent in 2014 to nine per cent of the total network, improving connectivity for urban, rural and industrial regions and enhancing logistics efficiency. A study by the Indian Institute of Management, Bangalore found that every one-rupee expenditure in national highway development leads to a Rs three point two increase in Gross Domestic Product (GDP). The study also reported a nine point nineteen per cent reduction in transport time between factories and suppliers, a four point ninety three per cent reduction between factories and customers, and a 16.6 per cent reduction in time to access schools. Reductions of nine per cent in time to access health services and seven per cent in time to reach mandis were noted, while the average number of mandis accessed increased by eight per cent. An estimation by the Indian Institute of Technology, Kanpur indicated that construction of one lane-km of national highway generates 4,478 person-days of direct employment and 5,297 person-days of indirect employment, with an induced effect of 52,393 person-days per lane-km over a period of seven years. The government constructed 57,125 km of national highways in the last five years with average construction of 34,215 lane-km per year, yielding average annual employment generation of about 330 million (mn) person-days including direct and indirect employment. The government has targeted operationalising 18,000 km of access controlled National HSCs and expressways by 2028-29 and aims to award 26,000 km by 2032-33, alongside priority development of ring roads, city bypasses for urban centres with populations above 0.5 million (mn), port links and connectivity to industrial nodes. The ministry emphasised that last-mile connectivity to agricultural centres, schools and health care facilities remains the responsibility of state governments, and the information was provided in a written reply to the Rajya Sabha.

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement