Expansion And Upgradation Of National Highways
ROADS & HIGHWAYS

Expansion And Upgradation Of National Highways

The Ministry of Road Transport and Highways has reported a sustained expansion of the national highway network, which has increased from 91,287 km in March, 2014 to 146,572 km at present. The ministry remains responsible for development and maintenance of National High Speed Corridors (HSCs) and expressways and directs capacity augmentation according to traffic density, connectivity needs and the PM GatiShakti National Master Plan.

Operational access controlled National High Speed Corridors and expressways have risen from 93 km in 2014 to 3,052 km at present, while the length of four-lane and above highways has increased by 2.6 times from 18,371 km to 48,568 km. The share of less than two-lane highways has fallen from 30 per cent in 2014 to nine per cent of the total network, improving connectivity for urban, rural and industrial regions and enhancing logistics efficiency.

A study by the Indian Institute of Management, Bangalore found that every one-rupee expenditure in national highway development leads to a Rs three point two increase in Gross Domestic Product (GDP). The study also reported a nine point nineteen per cent reduction in transport time between factories and suppliers, a four point ninety three per cent reduction between factories and customers, and a 16.6 per cent reduction in time to access schools. Reductions of nine per cent in time to access health services and seven per cent in time to reach mandis were noted, while the average number of mandis accessed increased by eight per cent.

An estimation by the Indian Institute of Technology, Kanpur indicated that construction of one lane-km of national highway generates 4,478 person-days of direct employment and 5,297 person-days of indirect employment, with an induced effect of 52,393 person-days per lane-km over a period of seven years. The government constructed 57,125 km of national highways in the last five years with average construction of 34,215 lane-km per year, yielding average annual employment generation of about 330 million (mn) person-days including direct and indirect employment.

The government has targeted operationalising 18,000 km of access controlled National HSCs and expressways by 2028-29 and aims to award 26,000 km by 2032-33, alongside priority development of ring roads, city bypasses for urban centres with populations above 0.5 million (mn), port links and connectivity to industrial nodes. The ministry emphasised that last-mile connectivity to agricultural centres, schools and health care facilities remains the responsibility of state governments, and the information was provided in a written reply to the Rajya Sabha.

The Ministry of Road Transport and Highways has reported a sustained expansion of the national highway network, which has increased from 91,287 km in March, 2014 to 146,572 km at present. The ministry remains responsible for development and maintenance of National High Speed Corridors (HSCs) and expressways and directs capacity augmentation according to traffic density, connectivity needs and the PM GatiShakti National Master Plan. Operational access controlled National High Speed Corridors and expressways have risen from 93 km in 2014 to 3,052 km at present, while the length of four-lane and above highways has increased by 2.6 times from 18,371 km to 48,568 km. The share of less than two-lane highways has fallen from 30 per cent in 2014 to nine per cent of the total network, improving connectivity for urban, rural and industrial regions and enhancing logistics efficiency. A study by the Indian Institute of Management, Bangalore found that every one-rupee expenditure in national highway development leads to a Rs three point two increase in Gross Domestic Product (GDP). The study also reported a nine point nineteen per cent reduction in transport time between factories and suppliers, a four point ninety three per cent reduction between factories and customers, and a 16.6 per cent reduction in time to access schools. Reductions of nine per cent in time to access health services and seven per cent in time to reach mandis were noted, while the average number of mandis accessed increased by eight per cent. An estimation by the Indian Institute of Technology, Kanpur indicated that construction of one lane-km of national highway generates 4,478 person-days of direct employment and 5,297 person-days of indirect employment, with an induced effect of 52,393 person-days per lane-km over a period of seven years. The government constructed 57,125 km of national highways in the last five years with average construction of 34,215 lane-km per year, yielding average annual employment generation of about 330 million (mn) person-days including direct and indirect employment. The government has targeted operationalising 18,000 km of access controlled National HSCs and expressways by 2028-29 and aims to award 26,000 km by 2032-33, alongside priority development of ring roads, city bypasses for urban centres with populations above 0.5 million (mn), port links and connectivity to industrial nodes. The ministry emphasised that last-mile connectivity to agricultural centres, schools and health care facilities remains the responsibility of state governments, and the information was provided in a written reply to the Rajya Sabha.

Related Stories

Gold Stories

Next Story
Resources

Schindler named among Forbes’ World’s Best Employers 2026

Schindler has been named among Forbes’ World’s Best Employers 2026, a global ranking recognising companies for their workplace environments.Compiled by Forbes in partnership with Statista, the ranking is based on independent employee feedback, including whether employees would recommend their organisation to friends and family.The company said the recognition reflected its focus on creating a workplace where employees can develop their expertise and build careers. ..

Next Story
Infrastructure Urban

India needs an export-execution mindset: Vishesh Jain

Interview with Vishesh Jain, Founder & CEO, EximpleWhat gaps in India’s global trade ecosystem led you to build Eximple, and what problem did you see businesses struggling with most?Eximple came out of a problem that all three founders had seen from different choke points in the trade ecosystem. India has millions of MSMEs and manufacturers, and many of them can make products that are genuinely competitive on quality. Yet only a small fraction is able to build meaningful international businesses. In our experience, the gap is usually not manufacturing capability; it is the ability to exe..

Next Story
Building Material

Nuvoco reports 13.5% revenue growth in Q2 FY27

Nuvoco Vistas Corp. Ltd. reported consolidated revenue of Rs 27.9 billion for Q2 FY27, up 13.5% year on year. Cement sales volume rose 9% to 4.7 million tonnes (MMT), while EBITDA increased 11% to Rs 4.11 billion.The company said it began its cement operations in 2014 with a 2.3 MMT per annum (MMTPA) operation at Nimbol. It now aims to reach 35 MMTPA of cement capacity by FY28, nearly 15 times its initial capacity. Its portfolio spans cement, ready-mix concrete and modern building materials.On sustainability and cost efficiency, Nuvoco partnered with CleanMax for a 46.4 MW wind-solar hybrid re..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code