Khammam-Devarapalle Greenfield Highway Nears Completion
ROADS & HIGHWAYS

Khammam-Devarapalle Greenfield Highway Nears Completion

The National Highways Authority of India has advanced construction of an access-controlled greenfield highway linking Khammam in Telangana to Devarapalli in Andhra Pradesh and expects to inaugurate the route in May. The 162-kilometre project has reached 95 per cent completion and is described by authorities as India’s first access-controlled greenfield highway. The development marks a notable step in regional connectivity and is expected to unlock more systematic movement of people and goods across state borders.

The four-lane expressway has been constructed under the Bharatmala Pariyojana initiative at an estimated cost of Rs 46,090 million (Rs 46,090 mn), reflecting significant public investment in road infrastructure. The corridor is intended to support high-speed movement and reduce congestion on existing arterial routes. Completion of the scheme is expected to accelerate economic activity along the alignment and to accommodate projected traffic growth.

The new alignment will shorten the distance between Hyderabad and Visakhapatnam by 56 kilometres, removing the longer route that passes via Suryapet and Vijayawada, and is projected to cut travel times substantially for both passenger and freight traffic. Operators and regional planners anticipate improved logistics efficiency and lower vehicle operating costs once the expressway is operational. The reduction in journey time is also expected to benefit intercity connectivity and regional trade flows and to improve the reliability of supply chains.

Work on one package covering the Recherla to Gurvaygudem section has been completed, whilst remaining packages continue to progress toward finalisation. The expressway will feature only nine designated entry and exit points along its length to maintain controlled access and enhanced safety for high-speed travel. An advanced traffic management system will be implemented with 360-degree CCTV cameras at two-kilometre intervals, and the project required acquisition of 1,996 acres of agricultural land across 31 villages; the surveillance network is intended to enable rapid incident response and assist routine maintenance activities.

The National Highways Authority of India has advanced construction of an access-controlled greenfield highway linking Khammam in Telangana to Devarapalli in Andhra Pradesh and expects to inaugurate the route in May. The 162-kilometre project has reached 95 per cent completion and is described by authorities as India’s first access-controlled greenfield highway. The development marks a notable step in regional connectivity and is expected to unlock more systematic movement of people and goods across state borders. The four-lane expressway has been constructed under the Bharatmala Pariyojana initiative at an estimated cost of Rs 46,090 million (Rs 46,090 mn), reflecting significant public investment in road infrastructure. The corridor is intended to support high-speed movement and reduce congestion on existing arterial routes. Completion of the scheme is expected to accelerate economic activity along the alignment and to accommodate projected traffic growth. The new alignment will shorten the distance between Hyderabad and Visakhapatnam by 56 kilometres, removing the longer route that passes via Suryapet and Vijayawada, and is projected to cut travel times substantially for both passenger and freight traffic. Operators and regional planners anticipate improved logistics efficiency and lower vehicle operating costs once the expressway is operational. The reduction in journey time is also expected to benefit intercity connectivity and regional trade flows and to improve the reliability of supply chains. Work on one package covering the Recherla to Gurvaygudem section has been completed, whilst remaining packages continue to progress toward finalisation. The expressway will feature only nine designated entry and exit points along its length to maintain controlled access and enhanced safety for high-speed travel. An advanced traffic management system will be implemented with 360-degree CCTV cameras at two-kilometre intervals, and the project required acquisition of 1,996 acres of agricultural land across 31 villages; the surveillance network is intended to enable rapid incident response and assist routine maintenance activities.

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement