KPIL Casts First Tunnel Segment for Bhopal Metro's Package BH-04
RAILWAYS & METRO RAIL

KPIL Casts First Tunnel Segment for Bhopal Metro's Package BH-04

Kalpataru Projects International Ltd. (KPIL) – Gulermak JV has started casting the first batch of tunnel ring segments for the underground Package BH-04 of the Bhopal Metro Orange Line. The 14.99 km Orange Line will connect Karond Circle to AIIMS, covering 16 stations.

Package BH-04 spans 3.39 km and includes underground tunnels and stations at Bhopal Junction and Nadra Bus Stand. The project, funded by a €400 million loan from the European Investment Bank, is part of the broader Bhopal Metro Phase 1, set to span 27.87 km. The project is expected to be completed by 2024.

Kalpataru Projects International Ltd. (KPIL) – Gulermak JV has started casting the first batch of tunnel ring segments for the underground Package BH-04 of the Bhopal Metro Orange Line. The 14.99 km Orange Line will connect Karond Circle to AIIMS, covering 16 stations. Package BH-04 spans 3.39 km and includes underground tunnels and stations at Bhopal Junction and Nadra Bus Stand. The project, funded by a €400 million loan from the European Investment Bank, is part of the broader Bhopal Metro Phase 1, set to span 27.87 km. The project is expected to be completed by 2024.

Next Story
Infrastructure Urban

Jyoti Structures FY26 profit rises 56.5%

Jyoti Structures (JSL) recently reported strong financial results for the quarter and year ended 31 March 2026, driven by disciplined execution, cost management and steady progress across its order book.For Q4 FY2025-26, total income rose 44.2 per cent to Rs 2.41 billion from Rs 1.67 billion in Q4 FY2024-25. EBITDA increased 58.6 per cent to Rs 237 million, while EBITDA margin improved by 89 basis points to 9.84 per cent. Profit before tax grew 53.3 per cent to Rs 188.5 million, and net profit rose 51.9 per cent to Rs 181.4 million.For FY2025-26, total income grew 53.1 per cent to Rs 7.72 bill..

Next Story
Infrastructure Energy

Cat BEPU to Power Doppstadt Separator at IFAT 2026

Caterpillar’s Cat Battery Electric Power Unit (BEPU) has been selected by Doppstadt to power its SWS 6 Spiral Shaft Separator, which will be showcased for the first time at IFAT 2026 in Munich, Germany, from 4–7 May.The compact plug-and-play BEPU is designed to replace a diesel engine within the same space, using the same mounting locations and relative machine position. It integrates the battery, motor, inverter, onboard charging, cooling and controls, enabling OEMs to electrify existing chassis platforms without extensive redesign.Caterpillar and Cat dealer Zeppelin Power Systems have be..

Next Story
Infrastructure Urban

VECV sales rise 6.9% in April 2026

VE Commercial Vehicles, a joint venture between Volvo Group and Eicher Motors, recorded sales of 7,318 units in April 2026, compared to 6,846 units in April 2025, registering 6.9 per cent growth. The total included 7,159 units under the Eicher brand and 159 units under the Volvo brand.Eicher branded trucks and buses reported sales of 7,159 units during the month, up 6.6 per cent from 6,717 units in April 2025. In the domestic commercial vehicle market, Eicher sales rose 8.6 per cent to 6,797 units from 6,257 units a year earlier.Exports declined 21.3 per cent, with VECV recording 362 units in ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement