Rs 640-Mn Nangloi–Najafgarh Road Overhaul Launched in West Delhi
ROADS & HIGHWAYS

Rs 640-Mn Nangloi–Najafgarh Road Overhaul Launched in West Delhi

The Delhi government launched a Rs 640.04-million project to overhaul the Nangloi–Najafgarh road in a bid to reduce traffic congestion and improve commuting conditions in West Delhi. Chief Minister Rekha Gupta and Lieutenant-Governor VK Saxena laid the foundation stone for the project, which focuses on comprehensive road strengthening and drainage upgrades along the busy corridor.

Under the project, new stormwater drains will be constructed and existing drains will be upgraded to address chronic waterlogging issues that have long affected the stretch. The initiative is expected to significantly improve road conditions and ensure smoother traffic flow, particularly during the monsoon season.

Saxena said he had inspected several areas in September 2024, including Mundka, Nangloi, Kanjhawala, Phirni Road and Rohtak Road, and found the infrastructure in an “extremely dilapidated” state. He noted that sewage water was flowing onto roads, surfaces were badly damaged, and commuters faced severe inconvenience due to potholes and unhygienic conditions. He added that corrective measures had been delayed earlier due to neglect, but the current project would address these long-standing issues.

Chief Minister Gupta said the Delhi government is adopting modern and scientific approaches to improve the Capital’s drainage and stormwater management systems. She said the project would strengthen and reconstruct the road, install crash barriers along the central verge, and ensure effective drainage even during heavy rainfall.

Highlighting the broader strategy, Gupta said regular drain cleaning, construction of new trunk drains and sewage treatment plant projects are being undertaken simultaneously. “Our aim is to ensure that only treated water flows into the Yamuna and that Delhi is permanently freed from waterlogging,” she said.

Public Works Department Minister Pravesh Sahib Singh said several roads in the area had remained in poor condition for years, and the present government had taken responsibility for their reconstruction by completing the tendering process and initiating work. Transport Minister Pankaj Singh added that the project would bring long-awaited relief to pedestrians and motorists who have faced severe difficulties, especially during the monsoon.

News source: The Hindu

The Delhi government launched a Rs 640.04-million project to overhaul the Nangloi–Najafgarh road in a bid to reduce traffic congestion and improve commuting conditions in West Delhi. Chief Minister Rekha Gupta and Lieutenant-Governor VK Saxena laid the foundation stone for the project, which focuses on comprehensive road strengthening and drainage upgrades along the busy corridor.Under the project, new stormwater drains will be constructed and existing drains will be upgraded to address chronic waterlogging issues that have long affected the stretch. The initiative is expected to significantly improve road conditions and ensure smoother traffic flow, particularly during the monsoon season.Saxena said he had inspected several areas in September 2024, including Mundka, Nangloi, Kanjhawala, Phirni Road and Rohtak Road, and found the infrastructure in an “extremely dilapidated” state. He noted that sewage water was flowing onto roads, surfaces were badly damaged, and commuters faced severe inconvenience due to potholes and unhygienic conditions. He added that corrective measures had been delayed earlier due to neglect, but the current project would address these long-standing issues.Chief Minister Gupta said the Delhi government is adopting modern and scientific approaches to improve the Capital’s drainage and stormwater management systems. She said the project would strengthen and reconstruct the road, install crash barriers along the central verge, and ensure effective drainage even during heavy rainfall.Highlighting the broader strategy, Gupta said regular drain cleaning, construction of new trunk drains and sewage treatment plant projects are being undertaken simultaneously. “Our aim is to ensure that only treated water flows into the Yamuna and that Delhi is permanently freed from waterlogging,” she said.Public Works Department Minister Pravesh Sahib Singh said several roads in the area had remained in poor condition for years, and the present government had taken responsibility for their reconstruction by completing the tendering process and initiating work. Transport Minister Pankaj Singh added that the project would bring long-awaited relief to pedestrians and motorists who have faced severe difficulties, especially during the monsoon.News source: The Hindu

Next Story
Infrastructure Transport

Chembur Metro to Boost East Mumbai Links

MMRDA is advancing eastern Mumbai’s urban mobility network, with the upcoming Chembur Metro Station set to emerge as a key interchange and the Mumbai Monorail preparing for relaunch.Dr Sanjay Mukherjee, Metropolitan Commissioner, MMRDA, conducted a site visit to Chembur Metro Station along with Kanhuraj Bagate, Managing Director, MMMOCL. He also visited the nearby VN Purav Monorail Station to review system preparedness and ease of interconnectivity.Once operational, the interchange is expected to offer commuters across the eastern suburbs quicker access, smoother transfers and seamless conne..

Next Story
Equipment

Herrenknecht TBMs Drive Thane–Borivali Tunnel Progress

Herrenknecht India has supplied two of the four tunnel boring machines (TBMs) required for the 11-km Thane–Borivali Twin Tunnel Project being developed by the Mumbai Metropolitan Region Development Authority (MMRDA). The project is expected to reduce travel time between Thane and Borivali from 60–90 minutes to around 15 minutes while easing congestion across the Mumbai Metropolitan Region.The first two Single Shield TBMs, named Nayak and Arjuna, feature 13.34-m cutterhead diameters and are designed for hard-rock excavation. They will be deployed to tunnel through the challenging geological..

Next Story
Resources

KBL Launches Smart Skid Mounted Fire Pump Set

Kirloskar Brothers (KBL) has launched its Smart Skid Mounted Fire Pump Set, an integrated fire protection solution designed to improve operational efficiency, remote monitoring and installation flexibility. The system was inaugurated by Ms Madhuritai Misal, Hon. Minister of State for Urban Development, Government of Maharashtra.The Smart Skid Mounted Fire Pump Set is a factory-tested, pre-packaged solution that combines FM/UL-certified motor and engine pump sets with IoT-enabled remote monitoring. Designed to deliver a flow rate of 170 m³/hr at a head of 100 metres, the system aims to provide..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

-->