ULCCS Completes Rs 4.53 Billion Infrastructure Projects
ROADS & HIGHWAYS

ULCCS Completes Rs 4.53 Billion Infrastructure Projects

The Uralungal Labour Contract Co-operative Society (ULCCS), one of India’s largest cooperative infrastructure organisations, recently completed three major infrastructure projects with a combined value of Rs 4.53 billion. The projects highlight the organisation’s capabilities across coastal protection engineering, complex bridge construction, and climate-resilient road infrastructure.
One project involved the construction of a 7.31-km coastal protection system designed to mitigate shoreline erosion and sea intrusion. The project included the placement of around 1,25,000 tetrapods and 8,50,000 tonnes of granite armour units, along with groyne structures to stabilise shoreline sediment movement. The project received the Outstanding Infrastructure Project 2023 recognition from the Indian Concrete Institute (ICI), Kochi Chapter.
ULCCS also completed South India’s longest over-backwater road bridge, spanning 1,755 metres and built largely over water using specialised marine construction methods. The bridge features 55-metre bow-string arch spans and multiple long spans to maintain inland waterway navigation while improving connectivity for island communities.
The third project involved a semi-elevated highway corridor designed to remain operational during seasonal flooding. By elevating critical sections above flood levels, the design ensures uninterrupted connectivity while supporting economic activity in flood-prone regions.
With over a century of experience and more than 7,500 projects executed, ULCCS continues to expand its role as a multi-sector infrastructure solutions provider across transportation, coastal engineering, and urban infrastructure in India.

The Uralungal Labour Contract Co-operative Society (ULCCS), one of India’s largest cooperative infrastructure organisations, recently completed three major infrastructure projects with a combined value of Rs 4.53 billion. The projects highlight the organisation’s capabilities across coastal protection engineering, complex bridge construction, and climate-resilient road infrastructure.One project involved the construction of a 7.31-km coastal protection system designed to mitigate shoreline erosion and sea intrusion. The project included the placement of around 1,25,000 tetrapods and 8,50,000 tonnes of granite armour units, along with groyne structures to stabilise shoreline sediment movement. The project received the Outstanding Infrastructure Project 2023 recognition from the Indian Concrete Institute (ICI), Kochi Chapter.ULCCS also completed South India’s longest over-backwater road bridge, spanning 1,755 metres and built largely over water using specialised marine construction methods. The bridge features 55-metre bow-string arch spans and multiple long spans to maintain inland waterway navigation while improving connectivity for island communities.The third project involved a semi-elevated highway corridor designed to remain operational during seasonal flooding. By elevating critical sections above flood levels, the design ensures uninterrupted connectivity while supporting economic activity in flood-prone regions.With over a century of experience and more than 7,500 projects executed, ULCCS continues to expand its role as a multi-sector infrastructure solutions provider across transportation, coastal engineering, and urban infrastructure in India.

Next Story
Infrastructure Transport

Chembur Metro to Boost East Mumbai Links

MMRDA is advancing eastern Mumbai’s urban mobility network, with the upcoming Chembur Metro Station set to emerge as a key interchange and the Mumbai Monorail preparing for relaunch.Dr Sanjay Mukherjee, Metropolitan Commissioner, MMRDA, conducted a site visit to Chembur Metro Station along with Kanhuraj Bagate, Managing Director, MMMOCL. He also visited the nearby VN Purav Monorail Station to review system preparedness and ease of interconnectivity.Once operational, the interchange is expected to offer commuters across the eastern suburbs quicker access, smoother transfers and seamless conne..

Next Story
Equipment

Herrenknecht TBMs Drive Thane–Borivali Tunnel Progress

Herrenknecht India has supplied two of the four tunnel boring machines (TBMs) required for the 11-km Thane–Borivali Twin Tunnel Project being developed by the Mumbai Metropolitan Region Development Authority (MMRDA). The project is expected to reduce travel time between Thane and Borivali from 60–90 minutes to around 15 minutes while easing congestion across the Mumbai Metropolitan Region.The first two Single Shield TBMs, named Nayak and Arjuna, feature 13.34-m cutterhead diameters and are designed for hard-rock excavation. They will be deployed to tunnel through the challenging geological..

Next Story
Resources

KBL Launches Smart Skid Mounted Fire Pump Set

Kirloskar Brothers (KBL) has launched its Smart Skid Mounted Fire Pump Set, an integrated fire protection solution designed to improve operational efficiency, remote monitoring and installation flexibility. The system was inaugurated by Ms Madhuritai Misal, Hon. Minister of State for Urban Development, Government of Maharashtra.The Smart Skid Mounted Fire Pump Set is a factory-tested, pre-packaged solution that combines FM/UL-certified motor and engine pump sets with IoT-enabled remote monitoring. Designed to deliver a flow rate of 170 m³/hr at a head of 100 metres, the system aims to provide..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

-->