+
UPPWD seeks bids for Two-Lane NH Project in UP
ROADS & HIGHWAYS

UPPWD seeks bids for Two-Lane NH Project in UP

The Ministry of Road Transport & Highways through Uttar Pradesh Public Works Department is engaged in the development of National Highways and as part of this endeavor, it has been decided to undertake work of Improvement and up-gradation from Km 29+000 (Sarpur) to Km 47+878/47+800 (Gosaiganj) of NH-227B (Sarpur to Gosaiganj Section) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh.

The complete BID document can be viewed / downloaded from official portal of the CPPP website https://eprocure.gov.in/eprocure/app from 19.06.2023 to 02.08.2023 (up to 11.00 Hrs.IST).

The tender seeks civil work- roads worth Rs. 5,91,28,00,000 crore to be completed in 730 days. As per the tender, the bid validity will be 120 days, and it will be an open bidding process. The bid submission period began on June 19, 2023 and will end on August 2, 2023.

A Pre-Bid meeting shall take place at the following date, time, and place: Chief Engineer-Regional Office, Ministry of Road Transport and Highways, N.H. Bhawan, Biotech Chowk, Lucknow Ring Road, Vikas Nagar, Lucknow 226022

Date: 20-July-2023 Time: 12:00 PM

Bidder must submit its financial bid and Technical Bid on or before 02.08.2023 https://eprocure.gov.in/eprocure/app

Essential details:

Project Estimated Value: ₹ 5,91,28,00,000
Product Category: Civil works- Roads
Bid Validity (Days): 730
Period of Work: 120 days
Tender ID - 2023_MoRTH_758308_1
Tender Ref. No.: CE-RO/LKO/NH(O)/12/NH227B (Pkg-II)/C.W./2022-23
Payment mode: Offline
Form of contract: EPC

About UPPWD:
The Uttar Pradesh Public Works Department (UPPWD) is responsible for the construction, maintenance, and improvement of roads and bridges in the state of Uttar Pradesh. The UPPWD has played a major role in the development of National Highways in the state.

In 2021-22, the UPPWD completed 51 projects under the Pradhan Mantri Gram Sadak Yojana (PMGSY), which is a central government scheme for the construction of rural roads. The UPPWD also completed 16 projects under the Bharatmala Pariyojana, which is a central government scheme for the development of national highways.

The UPPWD has also undertaken a number of other projects to improve the condition of national highways in the state. These projects include widening and strengthening of existing roads, construction of new bypasses, and construction of bridges.

The Ministry of Road Transport & Highways through Uttar Pradesh Public Works Department is engaged in the development of National Highways and as part of this endeavor, it has been decided to undertake work of Improvement and up-gradation from Km 29+000 (Sarpur) to Km 47+878/47+800 (Gosaiganj) of NH-227B (Sarpur to Gosaiganj Section) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh. The complete BID document can be viewed / downloaded from official portal of the CPPP website https://eprocure.gov.in/eprocure/app from 19.06.2023 to 02.08.2023 (up to 11.00 Hrs.IST). The tender seeks civil work- roads worth Rs. 5,91,28,00,000 crore to be completed in 730 days. As per the tender, the bid validity will be 120 days, and it will be an open bidding process. The bid submission period began on June 19, 2023 and will end on August 2, 2023. A Pre-Bid meeting shall take place at the following date, time, and place: Chief Engineer-Regional Office, Ministry of Road Transport and Highways, N.H. Bhawan, Biotech Chowk, Lucknow Ring Road, Vikas Nagar, Lucknow 226022 Date: 20-July-2023 Time: 12:00 PM Bidder must submit its financial bid and Technical Bid on or before 02.08.2023 https://eprocure.gov.in/eprocure/app Essential details: Project Estimated Value: ₹ 5,91,28,00,000 Product Category: Civil works- Roads Bid Validity (Days): 730 Period of Work: 120 days Tender ID - 2023_MoRTH_758308_1 Tender Ref. No.: CE-RO/LKO/NH(O)/12/NH227B (Pkg-II)/C.W./2022-23 Payment mode: Offline Form of contract: EPC About UPPWD: The Uttar Pradesh Public Works Department (UPPWD) is responsible for the construction, maintenance, and improvement of roads and bridges in the state of Uttar Pradesh. The UPPWD has played a major role in the development of National Highways in the state. In 2021-22, the UPPWD completed 51 projects under the Pradhan Mantri Gram Sadak Yojana (PMGSY), which is a central government scheme for the construction of rural roads. The UPPWD also completed 16 projects under the Bharatmala Pariyojana, which is a central government scheme for the development of national highways. The UPPWD has also undertaken a number of other projects to improve the condition of national highways in the state. These projects include widening and strengthening of existing roads, construction of new bypasses, and construction of bridges.

Next Story
Technology

Six ways a smarter workflow leads to faster, more accurate bids

In today’s fast-paced civil construction environment, estimators need more than just solid numbers. They need smart, streamlined processes. This article explores six key ways connected workflows can transform the estimated approach, help in minimising risk, move faster, and improve accuracy. By integrating tools, data, and teams, one can produce stronger bids with less rework, fewer surprises, and more confidence. As an estimator, the job goes beyond producing numbers. They are responsible for delivering bids that are fast, accurate, and built to win. In today’s civil construction ind..

Next Story
Real Estate

Experion Launches Women-Only Co-Living Project in Greater Noida

Experion, part of Singapore-based AT Capital Group, has launched its first co-living space under its managed rental housing brand, VLIV, in Greater Noida. The all-women residence features 730 twin-sharing beds with a strong focus on safety, comfort, and well-being. VLIV has committed a $300 million investment to create a structured, service-led rental housing ecosystem in India. The brand aims to scale up to 20,000 beds in the next few years, with a long-term target of 100,000 beds nationwide. “India’s rental housing is fragmented. VLIV is our way of building long-term, dependabl..

Next Story
Infrastructure Urban

Officine Maccaferri Acquires CPT to Bolster Tunnelling Tech

Ambienta’s platform company, Officine Maccaferri S.p.A., has acquired CPT Group, a leading Italian developer of robotic prefabrication systems and digital control technologies for mechanised tunnelling. The move positions Maccaferri as a global player in integrated tunnelling solutions, blending traditional and advanced mechanised systems. Based in Nova Milanese, CPT serves major global contractors across Europe, Southeast Asia, and Australia. The company offers robotic prefabrication (Robofactory), productivity-monitoring software for Tunnel Boring Machines (TBMs), and eco-designed spa..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?