Bengaluru Metro Launches Rs 12.74 Billion Platform Door Programme
RAILWAYS & METRO RAIL

Bengaluru Metro Launches Rs 12.74 Billion Platform Door Programme

Bengaluru Metro operator has unveiled a Rs 12.74 billion (bn) safety programme to install platform screen doors at all stations across the network. The initiative is intended to strengthen passenger protection and modernise station infrastructure. The authority framed the measure as a central element of its ongoing safety and service upgrade agenda. The plan also aligns with broader urban mobility priorities for safer public transport.

The platform screen doors will create a physical barrier between platforms and tracks, reducing incidents of accidental falls and unauthorised track access. Installation is designed to align with train door positions and signalling systems to ensure safe boarding and alighting. The specification emphasises robust materials and redundancy for reliability.

Beyond safety, the doors are expected to improve climate control within stations and cut energy use by reducing draft from tunnels. The project will also aim to decrease service disruptions caused by track intrusions and foreign objects on the right of way. The design will follow internationally recognised norms for platform edge protection. A structured maintenance regime will accompany the installation to sustain long term performance.

The project budget draws on the metro operator's capital allocations and provision for system upgrades. Procurement and installation will be carried out in phases to minimise disruption to commuter services and to enable testing at pilot locations before network-wide rollout. Vendors will be selected through competitive tendering in line with public procurement rules.

The operator will coordinate with train control and safety teams to integrate door operations with signalling and platform management systems. The move positions the metro to meet higher safety standards and to provide a more predictable and secure travel environment for daily commuters. Implementation timetables and detailed technical schedules will be published by the authority as work progresses.

"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

Bengaluru Metro operator has unveiled a Rs 12.74 billion (bn) safety programme to install platform screen doors at all stations across the network. The initiative is intended to strengthen passenger protection and modernise station infrastructure. The authority framed the measure as a central element of its ongoing safety and service upgrade agenda. The plan also aligns with broader urban mobility priorities for safer public transport. The platform screen doors will create a physical barrier between platforms and tracks, reducing incidents of accidental falls and unauthorised track access. Installation is designed to align with train door positions and signalling systems to ensure safe boarding and alighting. The specification emphasises robust materials and redundancy for reliability. Beyond safety, the doors are expected to improve climate control within stations and cut energy use by reducing draft from tunnels. The project will also aim to decrease service disruptions caused by track intrusions and foreign objects on the right of way. The design will follow internationally recognised norms for platform edge protection. A structured maintenance regime will accompany the installation to sustain long term performance. The project budget draws on the metro operator's capital allocations and provision for system upgrades. Procurement and installation will be carried out in phases to minimise disruption to commuter services and to enable testing at pilot locations before network-wide rollout. Vendors will be selected through competitive tendering in line with public procurement rules. The operator will coordinate with train control and safety teams to integrate door operations with signalling and platform management systems. The move positions the metro to meet higher safety standards and to provide a more predictable and secure travel environment for daily commuters. Implementation timetables and detailed technical schedules will be published by the authority as work progresses.

Next Story
Infrastructure Transport

Uttar Pradesh Accelerates National Highway Projects

Uttar Pradesh Chief Minister Yogi Adityanath met Union Road Transport and Highways Minister Nitin Gadkari to review National Highway and road infrastructure projects. Officials from the National Highways Authority of India presented progress updates and proposals. Ministers directed acceleration of land acquisition, forest clearances, utility shifting and other formalities to expedite delivery. Officials said that since 2014 about 10,204 kilometres of National Highway projects have been awarded and nearly 9,329 kilometres completed, with 606 kilometres approved and 1,010 kilometres completed b..

Next Story
Infrastructure Transport

NHAI Completes Repairs at 33 of 40 Spots Along Gurugram NH-48

The National Highways Authority of India has rectified 33 of 40 deficient locations along an 11km stretch of the Delhi–Gurugram NH-48 corridor, following a joint inspection by the authority, the Municipal Corporation of Gurugram and the Gurugram Metropolitan Development Authority. The audit identified damaged footpaths, crash barriers, inadequate lane markings and poor sanitation at multiple points between Rajiv Chowk and Signature Towers. Repairs and maintenance works have been carried out over May and June as part of the exercise. The report noted broken crash barriers and roadside litteri..

Next Story
Infrastructure Urban

Mankhurd Maharashtra Nagar Flyover To Open By August 2027

The Brihanmumbai Municipal Corporation has said the Mankhurd-Maharashtra Nagar flyover will be operational by August 2027, as part of measures to ease congestion in the eastern suburbs. The structure will provide a direct link from the T Junction on the Sion-Panvel highway to the existing Ghatkopar-Mankhurd Link Road. The T Junction is one of the major traffic choke points in the eastern suburbs and records heavy flows of vehicles travelling to and from Navi Mumbai and Pune. Motorists currently spend more than 15 minutes at the signal during peak periods, according to civic data, prompting the..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement