Double-stacked
RAILWAYS & METRO RAIL

Double-stacked "python" rolls out on WDFC

Gateway Rail Freight Ltd (GatewayRail), a subsidiary of Gateway Distriparks Limited, has undertaken operations of two double stacked trains in a python configuration on the Western dedicated freight corridor (DFC) . These trains are dedicated services for the CMA-CGM shipping line.

From the two double stacked trains, one train arrived from Mundra port and the other from Pipavav port, both carrying import containers. The trains were joined at New Kishangarh, Rajasthan (Madar Junction) for the DFC stretch of 306 km, up to New Ateli, Rewari, Haryana.

GatewayRail’s train was also one of the two that were recently inaugurated by Prime Minister Narendra Modi on the Western dedicated freight corridor (Rewari-Madar section).

GatewayRail is a subsidiary of Gateway Distriparks Ltd and an intermodal operator which operates four rail-linked inland container depots.


4th Indian Cement Review Conference 2021

17-18 March 

Click for event info


Make in Steel 2021

24 February 

Click for event info


Gateway Rail Freight Ltd (GatewayRail), a subsidiary of Gateway Distriparks Limited, has undertaken operations of two double stacked trains in a python configuration on the Western dedicated freight corridor (DFC) . These trains are dedicated services for the CMA-CGM shipping line. From the two double stacked trains, one train arrived from Mundra port and the other from Pipavav port, both carrying import containers. The trains were joined at New Kishangarh, Rajasthan (Madar Junction) for the DFC stretch of 306 km, up to New Ateli, Rewari, Haryana. GatewayRail’s train was also one of the two that were recently inaugurated by Prime Minister Narendra Modi on the Western dedicated freight corridor (Rewari-Madar section). GatewayRail is a subsidiary of Gateway Distriparks Ltd and an intermodal operator which operates four rail-linked inland container depots.4th Indian Cement Review Conference 202117-18 March Click for event infoMake in Steel 202124 February Click for event info

Next Story
Infrastructure Urban

DCPC Prepares for Special Campaign 5.0 with Focus on E-Waste

The Department of Chemicals and Petrochemicals (DCPC), Ministry of Chemicals and Fertilisers, is gearing up for Special Campaign 5.0, to be held from 2nd to 31st October 2025. The initiative will focus on e-waste disposal as per MoEFCC’s E-Waste Management Rules 2022, space optimisation, and enhancing workplace efficiency across field offices.Special Campaign 4.0, conducted between October 2023 and October 2024, delivered notable results in record management, grievance redressal, scrap disposal, and cleanliness drives.Key outcomes of Special Campaign 4.0Records management: 2,443 physical fil..

Next Story
Real Estate

BlackRock India Leases 1.4 Lakh Sq Ft in Bengaluru

BlackRock Services India, the domestic arm of global asset manager BlackRock, has leased 1.4 lakh sq ft of office space at IndiQube Symphony in Bengaluru, according to Propstack data. The 10-year deal is valued at around Rs 4.10 billion.The lease, among the largest transactions in India’s co-working sector, highlights the growing preference of global institutions for flexible office providers. The agreement, commencing October 1, 2025, covers ground plus five floors in KNG Tower 1 at Ashoknagar, MG Road — one of Bengaluru’s prime commercial hubs.As per the lease document, BlackRock will ..

Next Story
Infrastructure Transport

L&T Bags Rs 25–50 Bn Order for Mumbai-Ahmedabad Bullet Train Track Works

Larsen & Toubro’s (L&T) Transportation Infrastructure business has secured an order valued between Rs 25 crore and Rs 50 billion from the National High Speed Rail Corporation Limited (NHSRCL) for the Mumbai-Ahmedabad High Speed Rail (MAHSR) corridor.The contract, Package T1, involves the design, supply, construction, testing, and commissioning of 156 route km of high-speed ballastless track on a Design-Build Lump Sum Price basis. The stretch runs from Mumbai’s Bandra-Kurla Complex to Zaroli village in Gujarat and includes 21 km of underground track and 135 km of elevated viaduct.Se..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?