ICF RCF MCF To Manufacture 238 AC EMU Rakes
RAILWAYS & METRO RAIL

ICF RCF MCF To Manufacture 238 AC EMU Rakes

The Ministry of Railways has prioritised manufacturing of 238 air-conditioned electric multiple unit (AC EMU) rakes at its production units to ensure rolling stock availability for the Mumbai Suburban Railway as infrastructure under the Mumbai Urban Transport Project (MUTP) is commissioned. The production will be undertaken at Integral Coach Factory, Chennai, Rail Coach Factory, Kapurthala and Modern Coach Factory, Raebareli. The move was announced by the Union Railways Minister Ashwini Vaishnaw to align rolling stock induction with network upgrades.

An indicative production programme allocates 120 rakes to Integral Coach Factory, 71 rakes to Rail Coach Factory and 47 rakes to Modern Coach Factory, taking the total to 238 rakes. The Railway Board has approved procurement of the sanctioned AC EMU rakes on existing and proven RDSO and ICF specifications to expedite manufacture and supply. Indian Railways production units are described as having demonstrated capability in manufacturing modern passenger rolling stock, including air-conditioned EMUs, Vande Bharat trainsets and Vande Metro trainsets.

Supply of the rakes is planned to commence from 2027 with completion of the entire sanctioned quantity scheduled by 2030. Availability of the first trainsets during 2027, followed by phased delivery through to 2030, is expected to bridge the gap between infrastructure commissioning and rolling stock induction. This sequencing aims to enable optimum utilisation of newly commissioned suburban infrastructure and reduce delays in service enhancement.

The Minister linked the initiative to a broader vision for rail modernisation led by the Prime Minister, drawing a comparison with the highway expansion initiated under former Prime Minister Atal Bihari Vajpayee. He indicated that this vision of a four-lane railway network includes targeted investments exceeding Rs one trillion (tn) directed towards Odisha to modernise connectivity. The prioritised manufacture of AC EMU rakes is presented as a step to synchronise rolling stock supply with infrastructure investment and support improved suburban mobility.

The Ministry of Railways has prioritised manufacturing of 238 air-conditioned electric multiple unit (AC EMU) rakes at its production units to ensure rolling stock availability for the Mumbai Suburban Railway as infrastructure under the Mumbai Urban Transport Project (MUTP) is commissioned. The production will be undertaken at Integral Coach Factory, Chennai, Rail Coach Factory, Kapurthala and Modern Coach Factory, Raebareli. The move was announced by the Union Railways Minister Ashwini Vaishnaw to align rolling stock induction with network upgrades. An indicative production programme allocates 120 rakes to Integral Coach Factory, 71 rakes to Rail Coach Factory and 47 rakes to Modern Coach Factory, taking the total to 238 rakes. The Railway Board has approved procurement of the sanctioned AC EMU rakes on existing and proven RDSO and ICF specifications to expedite manufacture and supply. Indian Railways production units are described as having demonstrated capability in manufacturing modern passenger rolling stock, including air-conditioned EMUs, Vande Bharat trainsets and Vande Metro trainsets. Supply of the rakes is planned to commence from 2027 with completion of the entire sanctioned quantity scheduled by 2030. Availability of the first trainsets during 2027, followed by phased delivery through to 2030, is expected to bridge the gap between infrastructure commissioning and rolling stock induction. This sequencing aims to enable optimum utilisation of newly commissioned suburban infrastructure and reduce delays in service enhancement. The Minister linked the initiative to a broader vision for rail modernisation led by the Prime Minister, drawing a comparison with the highway expansion initiated under former Prime Minister Atal Bihari Vajpayee. He indicated that this vision of a four-lane railway network includes targeted investments exceeding Rs one trillion (tn) directed towards Odisha to modernise connectivity. The prioritised manufacture of AC EMU rakes is presented as a step to synchronise rolling stock supply with infrastructure investment and support improved suburban mobility.

Related Stories

Gold Stories

Next Story
Infrastructure Urban

Bengaluru Metro Awards Rs 554.8 mn Travellator Contract

Bengaluru Metro Rail Corporation (BMRCL) has awarded a Rs 55.48 crore (Rs 554.8 million (mn)) contract to Milan Road Buildtech LLP for civil and structural works to install a travellator and a connecting walkway at Central Silk Board. The contract covers design, construction and structural interfaces required to link the two adjacent metro stations. BMRCL authorised the award as part of procurement for infrastructure works on the Phase-2A project. The procurement followed BMRCL's standard tendering and evaluation procedures. The project will connect the Yellow Line Central Silk Board station w..

Next Story
Infrastructure Transport

GMRC Floats Tenders For Ahmedabad Metro RRTS Hybrid Corridors

Gujarat Metro Rail Corporation (GMRC) has floated three tenders for design consultancy services for the Ahmedabad Metro Phase three Metro cum Regional Rapid Transit System (RRTS) hybrid corridor. The procurements cover work on an additional network of 48.38 kilometre (km) to be integrated into the existing metro system. GMRC framed the tenders to secure specialised consultancy for alignment design, systems integration and coordination with RRTS planning. The consultancy scope will support detailed design and interface management for the hybrid corridors. The proposed hybrid routes include Vaki..

Next Story
Infrastructure Transport

Pune Metro Groundwork Starts on Swargate Katraj Underground Line

Construction work has begun on Pune Metro’s underground extension from Swargate to Katraj, with excavation starting at the busy Market Yard station. MLA Madhuri Misal inaugurated the excavation and inspected activities along the corridor. Maha Metro has commenced digging shafts to lower Tunnel Boring Machines (TBMs) into the ground and intends to deploy four TBMs gradually over the next few months. Station building and tunnelling will proceed simultaneously to streamline the schedule. Because the entire line is underground, authorities expect traffic disruption to be minimal and road space w..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement