IRCON invites bids for supply of stone ballast in Chhattisgarh
RAILWAYS & METRO RAIL

IRCON invites bids for supply of stone ballast in Chhattisgarh

Executive director/Special works IRCON INTERNATIONAL LIMITED, C-4, District  Center, Saket, New Delhi for and on behalf of Chattisgarh East West Railway Limited invites online bids in two packet system for the Supply and stacking 738000 cum of machine crushed Stone Ballast in block section between Gevra Pendra road,Urga Kusmunda in construction of New BG Electrified Double Railway Line for Chhattisgarh EW Rail Corridor in Chhattisgarh over SEC Railway. 
The tender seeks Civil Construction Goods worth Rs. 1,35,27,27,432 crore to be completed in 450 days [15 months]. As per the tender, the bid validity will be 90 days, and it will be an open bidding process. The bid submission period will start on July 13, 2023 and will end on July 19, 2023. 

As per date mentioned in Key Information Table (KIT) which can be downloaded free of cost. However, to participate in the online bidding process, bidders are required to pay a nonrefundable fee of Rs. 50,000/- (Rupees. Fifty Thousand only).

Any tender received without original Earnest Money in the form as specified in tender documents shall not be considered and shall be summarily rejected.

The contractor shall be deemed to have inspected and examined the site and information available in connection with and to have satisfied himself fully before submitting his bid about surface conditions, the extent and nature of work and materials necessary for the completion of the works, the means of access to the site and accommodation he may require. He shall also be deemed to have obtained all necessary information regarding risks, contingencies and all other circumstances which may influence of affect the contract.  

The contractor shall provide all superintendence, labour, materials, plant & equipment and all other things, whether of a temporary or permanent nature, required in and for such design, execution, completion and maintenance of the work and rectification of any defects as directed. 

A Pre-Bid meeting shall take place at the following date, time, and place:
C-4, District Centre, Saket, New Delhi

Date: 10-July-2023 Time: 11:30 PM

A complete bid document can be downloaded from the official website:

Essential details:

Project Estimated Value: ₹ 15,59,29,00,000
Product Category: Civil Construction Goods
Bid Validity (Days): 90 
Period of Work: 450 days  
Tender ID:  2023_IRCON_159225_1
Tender Ref. No.: IRCON/2060/CGRP/e TENDER/23 24/ Gevra Pendra/Balla
Payment mode: Offline  
Form of contract: Supply 

Executive director/Special works IRCON INTERNATIONAL LIMITED, C-4, District  Center, Saket, New Delhi for and on behalf of Chattisgarh East West Railway Limited invites online bids in two packet system for the Supply and stacking 738000 cum of machine crushed Stone Ballast in block section between Gevra Pendra road,Urga Kusmunda in construction of New BG Electrified Double Railway Line for Chhattisgarh EW Rail Corridor in Chhattisgarh over SEC Railway. The tender seeks Civil Construction Goods worth Rs. 1,35,27,27,432 crore to be completed in 450 days [15 months]. As per the tender, the bid validity will be 90 days, and it will be an open bidding process. The bid submission period will start on July 13, 2023 and will end on July 19, 2023. As per date mentioned in Key Information Table (KIT) which can be downloaded free of cost. However, to participate in the online bidding process, bidders are required to pay a nonrefundable fee of Rs. 50,000/- (Rupees. Fifty Thousand only).Any tender received without original Earnest Money in the form as specified in tender documents shall not be considered and shall be summarily rejected.The contractor shall be deemed to have inspected and examined the site and information available in connection with and to have satisfied himself fully before submitting his bid about surface conditions, the extent and nature of work and materials necessary for the completion of the works, the means of access to the site and accommodation he may require. He shall also be deemed to have obtained all necessary information regarding risks, contingencies and all other circumstances which may influence of affect the contract.  The contractor shall provide all superintendence, labour, materials, plant & equipment and all other things, whether of a temporary or permanent nature, required in and for such design, execution, completion and maintenance of the work and rectification of any defects as directed. A Pre-Bid meeting shall take place at the following date, time, and place:C-4, District Centre, Saket, New Delhi Date: 10-July-2023 Time: 11:30 PM A complete bid document can be downloaded from the official website:https://etenders.gov.in/eprocure/app Essential details:Project Estimated Value: ₹ 15,59,29,00,000Product Category: Civil Construction Goods Bid Validity (Days): 90 Period of Work: 450 days  Tender ID:  2023_IRCON_159225_1 Tender Ref. No.: IRCON/2060/CGRP/e TENDER/23 24/ Gevra Pendra/BallaPayment mode: Offline  Form of contract: Supply 

Next Story
Infrastructure Transport

Mumbai-Ahmedabad Bullet Train Set to Launch by 2028

India’s first bullet train is set to revolutionize high-speed travel along the western corridor, with the Mumbai-Ahmedabad high-speed rail project aiming for a 2028 launch. This announcement marks a major milestone in India’s infrastructure goals, as it promises to reduce travel time between the two economic hubs from eight hours to just three.Spanning a planned 508-kilometre stretch, the corridor stands as a flagship example of Indo-Japanese collaboration in technology and engineering. Once operational, the train is expected to transform intercity mobility and place India among the select..

Next Story
Infrastructure Transport

Mumbai-Gandhinagar Train Service Enhances Passenger Capacity

The Mumbai Central–Gandhinagar Capital Vande Bharat Express has increased its passenger capacity by adding four additional AC chair car coaches to meet the growing commuter demand on one of India’s busiest business corridors. This upgrade, effective from 11 May, raised the train’s seating capacity from 1,128 to 1,440 passengers, allowing it to serve 936 more passengers daily in both directions. The increase was described as a practical measure to accommodate the surging demand on the busy Mumbai–Ahmedabad–Gandhinagar route, which regularly operates at over 150 percent seat occupancy...

Next Story
Infrastructure Urban

Delhi Plans 12 Sewage Plants to Clean Najafgarh Drain Efficiently

Delhi’s ambitious plan to improve the water quality of the Yamuna River has gained significant momentum as the Delhi Jal Board (DJB) has begun work on 12 new sewage treatment plants (STPs) aimed at reducing the volume of untreated sewage being discharged from the Najafgarh Drain.This initiative forms part of the ongoing efforts to clean the Yamuna and restore the river’s health, which has long been a critical environmental issue for the national capital. Given the alarming pollution levels in the Yamuna, experts and officials consider this project a vital step toward addressing the persist..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?