+
MP Urges BMRCL to build travelator for Seamless Metro-Rail Integration
RAILWAYS & METRO RAIL

MP Urges BMRCL to build travelator for Seamless Metro-Rail Integration

Bengaluru Central's Member of Parliament, PC Mohan, called upon the Bangalore Metro Rail Corporation Limited (BMRCL) to construct a travelator for the seamless integration of the upcoming underground Metro station at Bamboo Bazaar with the proposed suburban rail station and platforms of the South Western Railway station in Cantonment. During his inspection of the ongoing construction works related to the redevelopment of Cantonment railway station, Mohan reminded BMRCL of its earlier promise to build an elevator connecting the Metro and railway stations when the Metro location was shifted from Cantonment to Bamboo Bazaar. He insisted that BMRCL fulfil this commitment and develop a comprehensive plan for the construction of the travelator.

Mohan emphasized that BMRCL's current proposal to build a 250-meter skywalk for integrating both Metro and railway stations are insufficient. He stressed that a travelator should be an integral part of the skywalk to enhance connectivity between the two stations.

In response, BMRCL's managing director, Anjum Parwez, stated that the feasibility of installing a travelator between the Metro station and suburban rail station would be carefully studied.

Additionally, the on-going Rs 4.8 billion project for redeveloping Cantonment railway station includes provisions for ample parking space. The plan includes designated parking areas for 1,000 cars and 1,000 bikes on the south and north sides of the station. The station will also be expanded with the addition of four more platforms. An official from South Western Railway mentioned that the road diversion in front of the station is in its final phase, and structural work on the station has commenced. The road widening from 13 to 24 meters will provide more space for pick-up and drop-offs.

Furthermore, Mohan urged BMRCL to establish baggage-checking facilities for passengers using the Blue Line connecting Kempegowda International Airport (KIA). He specifically mentioned that stations at Silk Board, KR Pura, and Hebbal should have these facilities in place.

Bengaluru Central's Member of Parliament, PC Mohan, called upon the Bangalore Metro Rail Corporation Limited (BMRCL) to construct a travelator for the seamless integration of the upcoming underground Metro station at Bamboo Bazaar with the proposed suburban rail station and platforms of the South Western Railway station in Cantonment. During his inspection of the ongoing construction works related to the redevelopment of Cantonment railway station, Mohan reminded BMRCL of its earlier promise to build an elevator connecting the Metro and railway stations when the Metro location was shifted from Cantonment to Bamboo Bazaar. He insisted that BMRCL fulfil this commitment and develop a comprehensive plan for the construction of the travelator. Mohan emphasized that BMRCL's current proposal to build a 250-meter skywalk for integrating both Metro and railway stations are insufficient. He stressed that a travelator should be an integral part of the skywalk to enhance connectivity between the two stations. In response, BMRCL's managing director, Anjum Parwez, stated that the feasibility of installing a travelator between the Metro station and suburban rail station would be carefully studied. Additionally, the on-going Rs 4.8 billion project for redeveloping Cantonment railway station includes provisions for ample parking space. The plan includes designated parking areas for 1,000 cars and 1,000 bikes on the south and north sides of the station. The station will also be expanded with the addition of four more platforms. An official from South Western Railway mentioned that the road diversion in front of the station is in its final phase, and structural work on the station has commenced. The road widening from 13 to 24 meters will provide more space for pick-up and drop-offs. Furthermore, Mohan urged BMRCL to establish baggage-checking facilities for passengers using the Blue Line connecting Kempegowda International Airport (KIA). He specifically mentioned that stations at Silk Board, KR Pura, and Hebbal should have these facilities in place.

Next Story
Infrastructure Transport

Lucknow Metro East-West Corridor Consultancy Contract Awarded

The Uttar Pradesh Metro Rail Corporation has awarded the first construction-related consultancy contract for the Lucknow Metro East West Corridor to a joint venture of AYESA Ingenieria Arquitectura SAU and AYESA India Pvt Ltd. The firm was declared the lowest bidder for the Detailed Design Consultant contract for Lucknow Metro Line-2 under Phase 1B and the contract was recommended following the financial bid. The contract is valued at Rs 159.0 million (mn), covering design services for the corridor. Lucknow Metro Line-2 envisages the construction of an 11.165 kilometre corridor connecting Cha..

Next Story
Infrastructure Urban

Div Com Kashmir Urges Fast Tracking Of Jhelum Water Transport Project

The Divisional Commissioner of Kashmir has called for the fast-tracking of the Jhelum water transport project, urging district administrations and relevant agencies to accelerate planning and clearances. In a meeting convened at the divisional headquarters, the commissioner instructed officials from irrigation, public health engineering and municipal departments to prioritise the project and coordinate survey and design work. The directive emphasised removal of administrative bottlenecks and close monitoring to ensure timely mobilisation of resources and contractors. Officials were told to in..

Next Story
Infrastructure Urban

Interarch Reports Strong Q3 And Nine Month Results

Interarch Building Solutions Limited reported unaudited results for the third quarter and nine months ended 31 December 2025, recording strong revenue growth driven by execution and a robust order book. Net revenue for the third quarter rose by 43.7 per cent to Rs 5.225 billion (bn), compared with Rs 3.636 bn a year earlier, reflecting heightened demand in pre-engineered building projects. The company’s total order book as at 31 January 2026 stood at Rs 16.85 bn, supporting near-term visibility. EBITDA excluding other income for the quarter increased by 43.2 per cent to Rs 503 million (mn),..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App