+
NMRC boosts Aqua Line metro frequency for UP International Trade Show
RAILWAYS & METRO RAIL

NMRC boosts Aqua Line metro frequency for UP International Trade Show

During the Uttar Pradesh International Trade Show, taking place from September 21 to 25, the Noida Metro Rail Corporation (NMRC) will be enhancing the frequency of trains on the Aqua Line.

The inaugural ceremony of the UP ITS, presided over by President Droupadi Murmu, is slated to occur at the India Expo Centre and Mart in Greater Noida.

Notably, the general public can access the event for free between 3 pm and 8 pm, as stated by Rakesh Kumar, the Chairman of the India Expo Centre and Mart.

For the convenience of attendees, NMRC Managing Director Lokesh M has advised that the nearest metro station, Knowledge Park, is the ideal point of entry to reach the exhibition. To alleviate potential station crowding and accommodate the influx of visitors, NMRC has boosted train frequency.

Specifically, trains will run every 7.5 minutes from 8 am to 10 pm, a deviation from the usual 10-minute intervals on the Aqua Line. During peak hours, spanning 8 am to 11 am and 5 pm to 8 pm, the metro trains will maintain the 7.5-minute frequency, as indicated by NMRC.

Lokesh M also noted that parking facilities are readily available at eight Aqua Line metro stations: Sector 51, Sector 76, NSEZ, Sector 142, Sector-137, Pari Chowk, Alpha 1, and Delta 1.

In anticipation of more than two lakh visitors, including foreigners, attending the UP ITS, the police have issued a road traffic advisory to manage the expected influx of traffic.

During the Uttar Pradesh International Trade Show, taking place from September 21 to 25, the Noida Metro Rail Corporation (NMRC) will be enhancing the frequency of trains on the Aqua Line.The inaugural ceremony of the UP ITS, presided over by President Droupadi Murmu, is slated to occur at the India Expo Centre and Mart in Greater Noida.Notably, the general public can access the event for free between 3 pm and 8 pm, as stated by Rakesh Kumar, the Chairman of the India Expo Centre and Mart.For the convenience of attendees, NMRC Managing Director Lokesh M has advised that the nearest metro station, Knowledge Park, is the ideal point of entry to reach the exhibition. To alleviate potential station crowding and accommodate the influx of visitors, NMRC has boosted train frequency.Specifically, trains will run every 7.5 minutes from 8 am to 10 pm, a deviation from the usual 10-minute intervals on the Aqua Line. During peak hours, spanning 8 am to 11 am and 5 pm to 8 pm, the metro trains will maintain the 7.5-minute frequency, as indicated by NMRC.Lokesh M also noted that parking facilities are readily available at eight Aqua Line metro stations: Sector 51, Sector 76, NSEZ, Sector 142, Sector-137, Pari Chowk, Alpha 1, and Delta 1.In anticipation of more than two lakh visitors, including foreigners, attending the UP ITS, the police have issued a road traffic advisory to manage the expected influx of traffic.

Next Story
Infrastructure Energy

BMW Industries partners with IOCL for PNG supply at Bokaro plant

BMW Industries has entered into a strategic partnership with Indian Oil Corporation (IOCL) for the supply of Piped Natural Gas (PNG), reinforcing its commitment to adopting cleaner and more efficient energy sources for its operations.The agreement was signed at the Eastern Region Pipelines (ERPL) headquarters in Kolkata. The partnership is expected to support the company’s upcoming manufacturing facility in Bokaro by facilitating the use of natural gas as a primary energy source.According to the company, the adoption of PNG will help enhance operational efficiency while also contributing to ..

Next Story
Real Estate

Bombay Realty Secures RERA for Three ICC Tower in South Mumbai

Bombay Realty, the real estate arm of Bombay Dyeing and part of the Wadia Group, has received Real Estate Regulatory Authority (RERA) certification for Three ICC – Wing A, the latest luxury residential tower at Island City Center in Mumbai’s Dadar.The RERA registration marks a key milestone in the development timeline and reinforces the company’s focus on regulatory transparency, timely project delivery, and high construction standards.Following the success of One ICC and Two ICC, the upcoming Three ICC tower represents the next phase of the Island City Center development. The project ai..

Next Story
Infrastructure Energy

Flender launches India’s largest wind gearbox test rig in Walajabad

Flender has inaugurated a 13.5 MW wind turbine gearbox test rig at its Walajabad facility near Chennai, marking the largest installation of its kind in India. The new facility is expected to strengthen the company’s manufacturing and testing capabilities while supporting the growing demands of the wind power sector in both domestic and global markets.The test rig was inaugurated on March 5 in the presence of Andreas Evertz, Group CEO, Flender; Lars Wiegemann, Vice President Wind Gears, Flender; and Vinod Shetty, CEO, Flender India, along with key industry customers and stakeholders.The insta..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Open In App