Tejasvi Surya Opposes Bengaluru Tunnel Road Plan
RAILWAYS & METRO RAIL

Tejasvi Surya Opposes Bengaluru Tunnel Road Plan

Bengaluru MP Tejasvi Surya opposed the Karnataka government's proposed tunnel road project in Bengaluru after the Chief Minister launched the scheme, saying it represented an unscientific approach that would not address the city's traffic problems. The project was launched by Chief Minister D K Shivakumar and involves a three-lane twin tunnel between Mehkri Circle and Hebbal Junction, a two km stretch estimated at Rs 11.39 billion (Rs 11.39 bn). Surya framed the plan as symptomatic of deeper failures in urban planning.

He noted that the government's own detailed project report indicated the tunnel would be saturated from day one, and he said that rendered the scheme flawed from the start. He argued that if the report projected immediate congestion the project would not serve ordinary commuters. Surya added that the project would not provide a long-term solution to congestion.

He asserted the scheme appeared to favour a small privileged group, including residents of Sadashivanagar and other elites who use the corridor to reach the airport, while ordinary taxpayers would bear the cost. He also alleged that contractors would benefit and that funds would be diverted to the ruling party, presenting the claim as a political concern. Surya questioned how a short tunnel could be presented as an answer when his party's figures had argued short flyovers could not relieve congestion.

He urged the government to prioritise expansion of mass public transport, including the Red Line Metro corridor, buses and suburban rail, as the appropriate long-term strategy. He argued that public transport had proven effective over time and that further flyovers and tunnels would replicate past failures. Reaffirming his opposition, he said his party would continue to resist plans for a longer tunnel and called for better planning rather than costly engineering fixes.

Bengaluru MP Tejasvi Surya opposed the Karnataka government's proposed tunnel road project in Bengaluru after the Chief Minister launched the scheme, saying it represented an unscientific approach that would not address the city's traffic problems. The project was launched by Chief Minister D K Shivakumar and involves a three-lane twin tunnel between Mehkri Circle and Hebbal Junction, a two km stretch estimated at Rs 11.39 billion (Rs 11.39 bn). Surya framed the plan as symptomatic of deeper failures in urban planning. He noted that the government's own detailed project report indicated the tunnel would be saturated from day one, and he said that rendered the scheme flawed from the start. He argued that if the report projected immediate congestion the project would not serve ordinary commuters. Surya added that the project would not provide a long-term solution to congestion. He asserted the scheme appeared to favour a small privileged group, including residents of Sadashivanagar and other elites who use the corridor to reach the airport, while ordinary taxpayers would bear the cost. He also alleged that contractors would benefit and that funds would be diverted to the ruling party, presenting the claim as a political concern. Surya questioned how a short tunnel could be presented as an answer when his party's figures had argued short flyovers could not relieve congestion. He urged the government to prioritise expansion of mass public transport, including the Red Line Metro corridor, buses and suburban rail, as the appropriate long-term strategy. He argued that public transport had proven effective over time and that further flyovers and tunnels would replicate past failures. Reaffirming his opposition, he said his party would continue to resist plans for a longer tunnel and called for better planning rather than costly engineering fixes.

Related Stories

Gold Stories

Next Story
Real Estate

Adani begins construction of Dharavi rehabilitation homes

Construction of rehabilitation homes for eligible Dharavi residents has commenced at the 22-acre Matunga railway site, following a Bhoomi Poojan ceremony performed by Pranav Adani, Director, Adani Enterprises (AEL). The project, being implemented by Adani Navbharat Developers (ANDPL), envisages 10 towers comprising 10,432 rehabilitation apartments and 1,379 commercial and industrial units.Under the in-situ rehabilitation scheme, eligible residents will receive homes measuring 350 sq ft. Residents from Sectors 6 and 1 will be accommodated at Matunga first, followed by nearly 4,500 apartments fo..

Next Story
Real Estate

Adani begins construction of Dharavi rehabilitation homes

Construction of rehabilitation homes for eligible Dharavi residents has commenced at the 22-acre Matunga railway site, following a Bhoomi Poojan ceremony performed by Pranav Adani, Director, Adani Enterprises (AEL). The project, being implemented by Adani Navbharat Developers (ANDPL), envisages 10 towers comprising 10,432 rehabilitation apartments and 1,379 commercial and industrial units.Under the in-situ rehabilitation scheme, eligible residents will receive homes measuring 350 sq ft. Residents from Sectors 6 and 1 will be accommodated at Matunga first, followed by nearly 4,500 apartments fo..

Next Story
Equipment

Seven Propel 470 HEV electric tippers go to work on coal haulage in Chhattisgarh

Propel EV, the electric mobility division of Propel Industries and India's No. 1 electric tipper brand, has deployed seven 470 HEV electric trucks with a leading coal-haulage contractor at one of India's largest opencast coal mines in Chhattisgarh. The trucks are in daily operation, moving coal on continuous haul cycles in one of the most demanding applications in Indian mining.Why Electric - and Why CoalCoal haulage runs round the clock: heavy loads, long haul cycles, steep ramps and abrasive dust. It is also where diesel hurts most. Engines run continuously, fuel is the largest single operat..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code