Smart development projects lined up for Visakhapatnam
SMART CITIES

Smart development projects lined up for Visakhapatnam

A series of smart development projects have been lined up for Visakhapatnam city. Andhra Pradesh Chief Minister YS Jagan Mohan Reddy, had earlier, laid the foundation stone for the Rs 300 crore development project undertaken by GVMC. Some of them will be made available to the general public.

NAD flyover, VMRDA's smart city park, and multi-level car parking (MLCP) at Jagadamba junction are among the projects ready for launch.

The construction of the double rotary flyover at NAD, which began on November 17, 2017, at a cost of Rs 150 crore, is expected to be completed soon.

Commuters will be able to travel to Marripalem, Gopalapatnam, Gajuwaka, and Muralinagar via the four legs of the flyover.

As Visakhapatnam prepares to become the state's executive capital, the flyover will play an important role in alleviating traffic congestion.

However, the construction of a rail overbridge (RoB) along the route to the airport, which cost Rs 16 crore, is still on hold. The flyover project will be completed once the RoB is grounded.

VMRDA's smart city park, built at a cost of Rs 30 crore as part of the smart city projects, will welcome residents. The rink is surrounded by greenery and is divided into four zones, each with its adventure cycle track, pathways, seating arrangements, and greenery.

The campus includes a multi-purpose lawn, a renovated old stupa, a yogic walking path, picnic facilities, a boating facility, a sports area, two badminton courts, and basketball and tennis courts. In addition, there is an open gym on the premises. A solar-powered tree and a bench in the park will serve as mobile charging stations.

A multi-level car parking (MLCP) will also be made available to the public at the Jagadamba junction. With a 100-car capacity, the Greater Visakhapatnam Municipal Corporation (GVMC) laid the groundwork for the MLCP in 2019. The five floored (G+4) projects will be built on an area of 367.8 sq mt and will cost around Rs 10 crore.

Image Source

"Join industry leaders at RAHSTA Expo, India's premier platform for roads, highways and traffic infrastructure. Register now to explore innovations, network with experts and shape the future of mobility."

A series of smart development projects have been lined up for Visakhapatnam city. Andhra Pradesh Chief Minister YS Jagan Mohan Reddy, had earlier, laid the foundation stone for the Rs 300 crore development project undertaken by GVMC. Some of them will be made available to the general public. NAD flyover, VMRDA's smart city park, and multi-level car parking (MLCP) at Jagadamba junction are among the projects ready for launch. The construction of the double rotary flyover at NAD, which began on November 17, 2017, at a cost of Rs 150 crore, is expected to be completed soon. Commuters will be able to travel to Marripalem, Gopalapatnam, Gajuwaka, and Muralinagar via the four legs of the flyover. As Visakhapatnam prepares to become the state's executive capital, the flyover will play an important role in alleviating traffic congestion. However, the construction of a rail overbridge (RoB) along the route to the airport, which cost Rs 16 crore, is still on hold. The flyover project will be completed once the RoB is grounded. VMRDA's smart city park, built at a cost of Rs 30 crore as part of the smart city projects, will welcome residents. The rink is surrounded by greenery and is divided into four zones, each with its adventure cycle track, pathways, seating arrangements, and greenery. The campus includes a multi-purpose lawn, a renovated old stupa, a yogic walking path, picnic facilities, a boating facility, a sports area, two badminton courts, and basketball and tennis courts. In addition, there is an open gym on the premises. A solar-powered tree and a bench in the park will serve as mobile charging stations. A multi-level car parking (MLCP) will also be made available to the public at the Jagadamba junction. With a 100-car capacity, the Greater Visakhapatnam Municipal Corporation (GVMC) laid the groundwork for the MLCP in 2019. The five floored (G+4) projects will be built on an area of 367.8 sq mt and will cost around Rs 10 crore. Image Source

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement