Smart development projects lined up for Visakhapatnam
SMART CITIES

Smart development projects lined up for Visakhapatnam

A series of smart development projects have been lined up for Visakhapatnam city. Andhra Pradesh Chief Minister YS Jagan Mohan Reddy, had earlier, laid the foundation stone for the Rs 300 crore development project undertaken by GVMC. Some of them will be made available to the general public.

NAD flyover, VMRDA's smart city park, and multi-level car parking (MLCP) at Jagadamba junction are among the projects ready for launch.

The construction of the double rotary flyover at NAD, which began on November 17, 2017, at a cost of Rs 150 crore, is expected to be completed soon.

Commuters will be able to travel to Marripalem, Gopalapatnam, Gajuwaka, and Muralinagar via the four legs of the flyover.

As Visakhapatnam prepares to become the state's executive capital, the flyover will play an important role in alleviating traffic congestion.

However, the construction of a rail overbridge (RoB) along the route to the airport, which cost Rs 16 crore, is still on hold. The flyover project will be completed once the RoB is grounded.

VMRDA's smart city park, built at a cost of Rs 30 crore as part of the smart city projects, will welcome residents. The rink is surrounded by greenery and is divided into four zones, each with its adventure cycle track, pathways, seating arrangements, and greenery.

The campus includes a multi-purpose lawn, a renovated old stupa, a yogic walking path, picnic facilities, a boating facility, a sports area, two badminton courts, and basketball and tennis courts. In addition, there is an open gym on the premises. A solar-powered tree and a bench in the park will serve as mobile charging stations.

A multi-level car parking (MLCP) will also be made available to the public at the Jagadamba junction. With a 100-car capacity, the Greater Visakhapatnam Municipal Corporation (GVMC) laid the groundwork for the MLCP in 2019. The five floored (G+4) projects will be built on an area of 367.8 sq mt and will cost around Rs 10 crore.

Image Source

A series of smart development projects have been lined up for Visakhapatnam city. Andhra Pradesh Chief Minister YS Jagan Mohan Reddy, had earlier, laid the foundation stone for the Rs 300 crore development project undertaken by GVMC. Some of them will be made available to the general public. NAD flyover, VMRDA's smart city park, and multi-level car parking (MLCP) at Jagadamba junction are among the projects ready for launch. The construction of the double rotary flyover at NAD, which began on November 17, 2017, at a cost of Rs 150 crore, is expected to be completed soon. Commuters will be able to travel to Marripalem, Gopalapatnam, Gajuwaka, and Muralinagar via the four legs of the flyover. As Visakhapatnam prepares to become the state's executive capital, the flyover will play an important role in alleviating traffic congestion. However, the construction of a rail overbridge (RoB) along the route to the airport, which cost Rs 16 crore, is still on hold. The flyover project will be completed once the RoB is grounded. VMRDA's smart city park, built at a cost of Rs 30 crore as part of the smart city projects, will welcome residents. The rink is surrounded by greenery and is divided into four zones, each with its adventure cycle track, pathways, seating arrangements, and greenery. The campus includes a multi-purpose lawn, a renovated old stupa, a yogic walking path, picnic facilities, a boating facility, a sports area, two badminton courts, and basketball and tennis courts. In addition, there is an open gym on the premises. A solar-powered tree and a bench in the park will serve as mobile charging stations. A multi-level car parking (MLCP) will also be made available to the public at the Jagadamba junction. With a 100-car capacity, the Greater Visakhapatnam Municipal Corporation (GVMC) laid the groundwork for the MLCP in 2019. The five floored (G+4) projects will be built on an area of 367.8 sq mt and will cost around Rs 10 crore. Image Source

Next Story
Infrastructure Transport

BMC Gets CRZ Nod For Rs 40 Million Gorai Bridge Rebuild

The Brihanmumbai Municipal Corporation (BMC) has secured Coastal Regulation Zone (CRZ) clearance for the reconstruction of the Poisar River bridge in Gorai, located in Mumbai’s western suburbs. However, the proposed demolition of the existing 100-metre bridge has sparked opposition from local residents, who claim it serves as the only direct access route between the Lower and Upper Koliwada areas. The three-decade-old bridge, situated within the CRZ buffer zone, was recently declared structurally unsafe following a civic audit. The BMC has sanctioned its reconstruction at an estimated cost ..

Next Story
Infrastructure Transport

NHAI Completes Rs 15.9 Billion Four-Lane Stretch On ECR

The National Highways Authority of India (NHAI) has completed the four-laning of the 38 km Puducherry–Poondiyankuppam stretch, ending near Cuddalore, in a development that will cut travel time by up to two hours, according to a report by The New Indian Express. The upgraded section, built at a cost of Rs 15.9 billion under the Bharatmala Pariyojana Phase I, marks a major milestone in the ongoing East Coast Road (ECR) widening programme. The project promises a smoother, faster drive for motorists travelling towards Cuddalore, Chidambaram, Sirkazhi, and Nagapattinam. With this completion, 22..

Next Story
Infrastructure Transport

Encroachments Delay Rs 1 Billion Ghatkopar Bridge Project

The construction of a new cable-stayed rail overbridge at Ghatkopar and the widening of the Andheri–Ghatkopar Link Road (AGLR) have been delayed due to the presence of nearly 250 encroached structures on both sides of the road. In response, Municipal Commissioner Bhushan Gagrani has directed officials to carry out a structural audit of the existing bridge over the railway line and enforce temporary restrictions on heavy vehicles to ensure public safety. The bridge, which starts at the Golibar Road junction near LBS Marg and extends up to the Eastern Express Highway (EEH), serves as a critic..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Talk to us?