Tenders Floated for Integrated Water Management System in Haryana
WATER & WASTE

Tenders Floated for Integrated Water Management System in Haryana

Building on the success of a pilot project, Haryana has taken a proactive step by floating tenders for the implementation of an Integrated Water Management System. This initiative underscores the region's commitment to enhancing water distribution efficiency and marks a significant stride towards sustainable water management practices.

The Integrated Water Management System, with its planned implementation through a 1,300 mm pipeline, signifies a comprehensive approach to water distribution infrastructure. The expansion of such initiatives is crucial for addressing water-related challenges and ensuring a reliable and efficient supply to meet the growing demands of the population.

The tendering process indicates a strategic move by Haryana to leverage advanced water management technologies and systems. The integration of modern approaches is expected to enhance the overall effectiveness of water distribution, minimise wastage, and contribute to the conservation of this vital resource.

As water becomes an increasingly precious commodity, the implementation of an Integrated Water Management System aligns with the broader goal of sustainable resource utilisation. The project's expansion reflects Haryana's commitment to adopting innovative solutions for water management and lays the groundwork for a more resilient and efficient water distribution network in the region.

Building on the success of a pilot project, Haryana has taken a proactive step by floating tenders for the implementation of an Integrated Water Management System. This initiative underscores the region's commitment to enhancing water distribution efficiency and marks a significant stride towards sustainable water management practices. The Integrated Water Management System, with its planned implementation through a 1,300 mm pipeline, signifies a comprehensive approach to water distribution infrastructure. The expansion of such initiatives is crucial for addressing water-related challenges and ensuring a reliable and efficient supply to meet the growing demands of the population. The tendering process indicates a strategic move by Haryana to leverage advanced water management technologies and systems. The integration of modern approaches is expected to enhance the overall effectiveness of water distribution, minimise wastage, and contribute to the conservation of this vital resource. As water becomes an increasingly precious commodity, the implementation of an Integrated Water Management System aligns with the broader goal of sustainable resource utilisation. The project's expansion reflects Haryana's commitment to adopting innovative solutions for water management and lays the groundwork for a more resilient and efficient water distribution network in the region.

Next Story
Infrastructure Transport

MMRDA advances 250 m on Orange Gate–Marine Drive tunnel

The Mumbai Metropolitan Region Development Authority (MMRDA) has completed 250 m of underground tunnelling for the Orange Gate–Marine Drive Urban Road Tunnel using India’s largest slurry shield tunnel boring machine (TBM) deployed for an urban road project.The project involves twin tunnels extending over 7 km beneath critical transport corridors, including Central Railway, Western Railway and Metro Line 3. The work requires high-precision engineering to navigate densely developed urban infrastructure.Once completed, the tunnel is expected to reduce travel time between Orange Gate and Marin..

Next Story
Infrastructure Urban

Hindustan Zinc Pays Rs 188.46 Billion in FY26

Hindustan Zinc contributed Rs 188.46 billion to the public exchequer in FY 2025-26, according to its 9th Tax Transparency Report. The contribution, equivalent to 46 per cent of the company’s revenue, included direct and indirect taxes, government royalties, dividends to the Government of India, withholding taxes and other statutory levies.The company’s five-year cumulative contribution to the exchequer stood at Rs 915.72 billion. In FY26, Hindustan Zinc reported revenue of Rs 408.44 billion, EBITDA of Rs 221.62 billion and profit after tax of Rs 138.32 billion. It also achieved its highest..

Next Story
Infrastructure Urban

World of Concrete India 2026 Opens in Mumbai

Informa Markets in India will host the 12th edition of World of Concrete India 2026 from 3–5 June 2026 at the Bombay Exhibition Centre, Mumbai. The specialised B2B exhibition will bring together manufacturers, suppliers, contractors, developers, architects, consultants, infrastructure companies, project leaders and government stakeholders.The event is expected to feature over 350 brands and more than 18,000 trade professionals. It will cover concrete and cement, dry mortar, precast technologies, formwork, construction chemicals, industrial and commercial flooring, scaffolding, safety solutio..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

-->