RHPCL, MEIL signs pact to execute 850 MW Ratle power project
POWER & RENEWABLE ENERGY

RHPCL, MEIL signs pact to execute 850 MW Ratle power project

Ratle Hydroelectric Power Corporation Limited (RHPCL) and Megha Engineering and Infrastructure Limited (MEIL) signed an agreement for the turnkey execution of the 850 MW Ratle hydel project.

CEO of RHPCL, Deepak Saigal and Vice President, MEIL, Umamaheswara Reddy, signed the contract agreement at the Convention Centre in the presence of Lieutenant Governor Manoj Sinha.

Sinha told the media that the signing was a historic move to realise the goal of making Jammu and Kashmir self-sufficient in the power sector.

He said a large-scale capacity augmentation programme had been undertaken in the power sector resulting in a huge leap in power transmission and distribution capacity. The new power generation projects like Ratle, Pakal Dul, Kiru etc., will bridge the gap in the Union Territories (UT’s) electricity requirements.

The 850 MW Ratle hydel power project will provide massive direct and indirect employment opportunities to the local population. Sinha directed the concerned agencies to lay down a comprehensive mechanism for the skill of the local people, which will provide them opportunities in executing the project.

Sinha said that despite having the capacity to generate 20,000 MW of hydropower, just 3,500 MW of electricity was harnessed in 70 years. The generation capacity will be doubled in the next four years.

Image Source

Also read: MEIL acquires 15 city gas distribution projects in 9 states

Ratle Hydroelectric Power Corporation Limited (RHPCL) and Megha Engineering and Infrastructure Limited (MEIL) signed an agreement for the turnkey execution of the 850 MW Ratle hydel project. CEO of RHPCL, Deepak Saigal and Vice President, MEIL, Umamaheswara Reddy, signed the contract agreement at the Convention Centre in the presence of Lieutenant Governor Manoj Sinha. Sinha told the media that the signing was a historic move to realise the goal of making Jammu and Kashmir self-sufficient in the power sector. He said a large-scale capacity augmentation programme had been undertaken in the power sector resulting in a huge leap in power transmission and distribution capacity. The new power generation projects like Ratle, Pakal Dul, Kiru etc., will bridge the gap in the Union Territories (UT’s) electricity requirements. The 850 MW Ratle hydel power project will provide massive direct and indirect employment opportunities to the local population. Sinha directed the concerned agencies to lay down a comprehensive mechanism for the skill of the local people, which will provide them opportunities in executing the project. Sinha said that despite having the capacity to generate 20,000 MW of hydropower, just 3,500 MW of electricity was harnessed in 70 years. The generation capacity will be doubled in the next four years. Image Source Also read: MEIL acquires 15 city gas distribution projects in 9 states

Next Story
Infrastructure Urban

ABS Marine Sees CRISIL Credit Rating Upgrade

ABS Marine Services has secured an upgrade to its long term and short term credit ratings from CRISIL, reflecting improved profitability and revenue growth through long term contracts. CRISIL moved the long term rating from BBB+/Stable to A-/Stable and revised the short term rating from A2 to A2+. The action signals strengthened financial metrics and operational resilience. The company benefited from durable client relationships with firms such as ONGC and Schlumberger. The rating decision followed stronger cash flows and an enlarged bank loan facility, which increased from Rs 3,705 million (m..

Next Story
Infrastructure Transport

Project BRAHMANK Marks 16 Years Of Strategic Roads In Arunachal

Project BRAHMANK is marking 16 years of work to establish strategic road and bridge links across Arunachal Pradesh, maintaining and developing 811 kilometres of roads and nearly 86 bridges that range from small culverts to large steel and arch bridges. These transport links are described as critical for ensuring year-round movement of defence personnel, equipment and essential supplies while improving everyday travel for people in remote villages. The project balances national security requirements with regional development by focusing on reliable access in challenging terrain. Notable enginee..

Next Story
Infrastructure Transport

Longleng CSOs Give One Week Ultimatum Over Two-Lane Highway

Civil society organisations (CSOs) in Longleng district have demanded immediate restoration of the deteriorating Changtongya–Longleng two-lane road and sought a detailed status report on the stalled construction within one week. The demand followed a consultative meeting convened under the Phom Peoples' Council (PPC) to discuss welfare and development concerns. PPC president YB Angam Phom said prolonged non-maintenance had caused hardship to commuters and affected transportation, local commerce and the district's development. The meeting urged authorities to undertake immediate restoration a..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement