NTPC Renewable Energy, a wholly owned subsidiary of NTPC Green Energy, has invited online bids for operation and maintenance of four pooling substations at the 4,750 megawatt (MW) Khavda Renewable Energy Park in Bhuj, Gujarat. The tender was issued via the Government e-Marketplace portal under bid number GEM/2026/B/7706808 dated July 7, 2026.

Under the contract the selected contractor will operate and maintain the four pooling substations for three years, or 36 months, from the date of award, with a mobilisation period of seven days. The bidding follows a two-packet system; the bid submission deadline is July 21, 2026 at three pm and technical bids will be opened at three thirty pm, with offers to remain valid for 120 days.

Bidders must submit an Earnest Money Deposit of Rs 2 million (mn), payable online by NEFT or RTGS to NREL's designated Axis Bank account or acceptable as a bank guarantee or insurance surety bond. The tender specifies no electronic Performance Bank Guarantee and EMD exemption is limited to Micro and Small Enterprises registered under Udyam, excluding traders and dealers.

Technical qualification requires prior experience in installation and commissioning of a 220 kilovolt or higher substation or the operation and maintenance of such a substation for at least one year in the last seven years. Financial criteria require an average annual turnover of at least Rs 35.6 million (mn) over the previous three financial years and a net worth equal to or greater than paid-up share capital. Participation is restricted to Class-I local suppliers with 100 per cent local content and bidders from countries sharing a land border with India must be registered with the competent authority. Key documents including the Power of Attorney and Integrity Pact are to be submitted in physical form to the Contract Services office in Greater Noida before the bid deadline.

NTPC Renewable Energy, a wholly owned subsidiary of NTPC Green Energy, has invited online bids for operation and maintenance of four pooling substations at the 4,750 megawatt (MW) Khavda Renewable Energy Park in Bhuj, Gujarat. The tender was issued via the Government e-Marketplace portal under bid number GEM/2026/B/7706808 dated July 7, 2026. Under the contract the selected contractor will operate and maintain the four pooling substations for three years, or 36 months, from the date of award, with a mobilisation period of seven days. The bidding follows a two-packet system; the bid submission deadline is July 21, 2026 at three pm and technical bids will be opened at three thirty pm, with offers to remain valid for 120 days. Bidders must submit an Earnest Money Deposit of Rs 2 million (mn), payable online by NEFT or RTGS to NREL's designated Axis Bank account or acceptable as a bank guarantee or insurance surety bond. The tender specifies no electronic Performance Bank Guarantee and EMD exemption is limited to Micro and Small Enterprises registered under Udyam, excluding traders and dealers. Technical qualification requires prior experience in installation and commissioning of a 220 kilovolt or higher substation or the operation and maintenance of such a substation for at least one year in the last seven years. Financial criteria require an average annual turnover of at least Rs 35.6 million (mn) over the previous three financial years and a net worth equal to or greater than paid-up share capital. Participation is restricted to Class-I local suppliers with 100 per cent local content and bidders from countries sharing a land border with India must be registered with the competent authority. Key documents including the Power of Attorney and Integrity Pact are to be submitted in physical form to the Contract Services office in Greater Noida before the bid deadline.

Next Story
Infrastructure Transport

Surya Roshni delivers customised lighting for NCRTC RRTS stations

Surya Roshni has supplied customised indoor lighting solutions for 18 elevated stations on the National Capital Region Transport Corporation's (NCRTC) Rapid Rail Transit System (RRTS), strengthening its presence in India's infrastructure lighting segment.The project involved the design and deployment of lighting systems for platforms, concourses, foot overbridges (FOBs) and back-of-house (BOH) areas. According to the company, the luminaires were developed specifically to meet NCRTC's design, operational and performance requirements rather than using standard products.Surya introduced two custo..

Next Story
Real Estate

Hilton debuts Tapestry Collection brand in Vietnam

Hilton has opened NHAAN Resort & Spa Hoi An, Tapestry Collection by Hilton, marking the debut of the Tapestry Collection brand in Vietnam and expanding its lifestyle hospitality portfolio in Southeast Asia.Located along the Co Co River in Cam Thanh village, the 174-key resort provides access to Hoi An Ancient Town, Cua Dai Beach and the Cam Thanh Nipa Forest. The property has been designed by Vietnamese architect Vo Trong Nghia, incorporating biophilic architecture, locally sourced materials and riverfront landscapes.The resort offers a mix of guest rooms and suites, including family-frien..

Next Story
Building Material

Electrent expands lithium energy storage system portfolio

Electrent Energy has expanded its lithium-based energy storage portfolio with the launch of the ESS 850 and ESS 1050, targeting compact and maintenance-free power backup solutions for Indian homes.The new systems integrate a Home UPS and a LiFePO4 lithium battery into a single unit, extending the company's product range following the launch of its ESS 1350 and ESS 2500 models.Designed for apartments and smaller homes, the ESS 850 provides up to 1 hour 15 minutes of backup, while the ESS 1050 offers up to 1 hour 45 minutes on a typical 400 W household load. The systems can power essential appli..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement