RMC Switchgears Secures 12 Orders From Telangana Power Distributor
POWER & RENEWABLE ENERGY

RMC Switchgears Secures 12 Orders From Telangana Power Distributor

RMC Switchgears Limited has been awarded 12 letters of award by Southern Power Distribution Company of Telangana Limited for the supply of low tension distribution boxes, worth Rs. 24.45 million (mn). The company filed a regulatory intimation with the stock exchanges on 04.08.2026 noting that the awards will strengthen its order book. The filing indicated that the contracts will contribute positively to the company's revenue and growth prospects. The intimation was addressed to both the Bombay Stock Exchange and the National Stock Exchange.

The disclosure stated that the orders were awarded by a domestic entity and were issued as letters of intent for the supply of low tension distribution boxes. The contracts are to be executed within 12 months of commencement. The company will update the exchanges on any further material developments as required under the listing regulations. The disclosure noted that the orders relate specifically to low tension distribution hardware used across urban and rural feeders in the state.

The aggregate contract consideration corresponds to Rs. 2,44,46,650, which is equivalent to Rs. 24.45 million (mn) when converted to a straight million figure. The filing further confirmed that the promoter group and related parties have no interest in the entity that awarded the orders and that the transactions do not constitute related party dealings. The disclosure was signed by the compliance officer and company secretary. The company reiterated that execution will follow applicable compliance and quality standards and that timelines are binding.

The awards increase near term order visibility and will support operational planning for the coming financial period. Execution of the contracts will proceed under the stated timelines and the company will communicate progress through exchange filings. Market participants will observe order conversion and delivery as the contracts are implemented. Analysts and investors will factor the new orders into near term revenue estimates and monitor margin impact as execution proceeds.

RMC Switchgears Limited has been awarded 12 letters of award by Southern Power Distribution Company of Telangana Limited for the supply of low tension distribution boxes, worth Rs. 24.45 million (mn). The company filed a regulatory intimation with the stock exchanges on 04.08.2026 noting that the awards will strengthen its order book. The filing indicated that the contracts will contribute positively to the company's revenue and growth prospects. The intimation was addressed to both the Bombay Stock Exchange and the National Stock Exchange. The disclosure stated that the orders were awarded by a domestic entity and were issued as letters of intent for the supply of low tension distribution boxes. The contracts are to be executed within 12 months of commencement. The company will update the exchanges on any further material developments as required under the listing regulations. The disclosure noted that the orders relate specifically to low tension distribution hardware used across urban and rural feeders in the state. The aggregate contract consideration corresponds to Rs. 2,44,46,650, which is equivalent to Rs. 24.45 million (mn) when converted to a straight million figure. The filing further confirmed that the promoter group and related parties have no interest in the entity that awarded the orders and that the transactions do not constitute related party dealings. The disclosure was signed by the compliance officer and company secretary. The company reiterated that execution will follow applicable compliance and quality standards and that timelines are binding. The awards increase near term order visibility and will support operational planning for the coming financial period. Execution of the contracts will proceed under the stated timelines and the company will communicate progress through exchange filings. Market participants will observe order conversion and delivery as the contracts are implemented. Analysts and investors will factor the new orders into near term revenue estimates and monitor margin impact as execution proceeds.

Related Stories

Gold Stories

Next Story
Infrastructure Urban

Bengaluru Metro Awards Rs 554.8 mn Travellator Contract

Bengaluru Metro Rail Corporation (BMRCL) has awarded a Rs 55.48 crore (Rs 554.8 million (mn)) contract to Milan Road Buildtech LLP for civil and structural works to install a travellator and a connecting walkway at Central Silk Board. The contract covers design, construction and structural interfaces required to link the two adjacent metro stations. BMRCL authorised the award as part of procurement for infrastructure works on the Phase-2A project. The procurement followed BMRCL's standard tendering and evaluation procedures. The project will connect the Yellow Line Central Silk Board station w..

Next Story
Infrastructure Transport

GMRC Floats Tenders For Ahmedabad Metro RRTS Hybrid Corridors

Gujarat Metro Rail Corporation (GMRC) has floated three tenders for design consultancy services for the Ahmedabad Metro Phase three Metro cum Regional Rapid Transit System (RRTS) hybrid corridor. The procurements cover work on an additional network of 48.38 kilometre (km) to be integrated into the existing metro system. GMRC framed the tenders to secure specialised consultancy for alignment design, systems integration and coordination with RRTS planning. The consultancy scope will support detailed design and interface management for the hybrid corridors. The proposed hybrid routes include Vaki..

Next Story
Infrastructure Transport

Pune Metro Groundwork Starts on Swargate Katraj Underground Line

Construction work has begun on Pune Metro’s underground extension from Swargate to Katraj, with excavation starting at the busy Market Yard station. MLA Madhuri Misal inaugurated the excavation and inspected activities along the corridor. Maha Metro has commenced digging shafts to lower Tunnel Boring Machines (TBMs) into the ground and intends to deploy four TBMs gradually over the next few months. Station building and tunnelling will proceed simultaneously to streamline the schedule. Because the entire line is underground, authorities expect traffic disruption to be minimal and road space w..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement