Komatsu India bags large mining equipment order in India
Equipment

Komatsu India bags large mining equipment order in India

Komatsu India (KIPL) has secured orders for large-sized mining equipment from a major mining company in India along with its distribution partner Larsen & Toubro (L&T). The order comprises of over 80 units of Komatsu mining equipment. These include dump trucks, hydraulic excavators, bul...

Komatsu India (KIPL) has secured orders for large-sized mining equipment from a major mining company in India along with its distribution partner Larsen & Toubro (L&T). The order comprises of over 80 units of Komatsu mining equipment. These include dump trucks, hydraulic excavators, bull dozers, motor graders, wheel loaders and wheel dozers. The scope of the order includes supply of equipment along with full maintenance contract (FMC) for up to 10 years of equipment operation. These equipment are scheduled for deployment at the customers jobsite starting May.Contact: Komatsu India Website: www.komatsuindia.in

Next Story
Infrastructure Transport

Railways Boosts Cyber Security And Fairness In Ticket Bookings

Indian Railways has said its reservation ticketing system is a robust and highly secure IT platform equipped with state-of-the-art cyber security measures. The national transporter has introduced several initiatives to enhance system performance and improve access to regular and tatkal tickets. A key step has been the large-scale revalidation and verification of user accounts. Since January 2025, around 30.2 million suspicious user IDs have been deactivated. Anti-bot tools such as Akamai have been deployed to filter non-genuine users, ensuring smoother booking for legitimate passengers. To c..

Next Story
Infrastructure Transport

Indian Railways Speeds Up Green Transition With Wider Electrification

Indian Railways is accelerating its modernisation drive by upgrading infrastructure and rolling stock with advanced technologies aimed at enhancing safety, punctuality, reliability and passenger comfort. A major focus of this effort is the transition to cleaner traction systems, with a significant reduction in the use of coal-based and diesel engines. Electrification has been taken up in mission mode. As of now, 99.2 per cent of the Broad Gauge (BG) network has been electrified, with the remaining routes under execution. During 2014–25, Railways electrified 46,900 route kilometres, compared..

Next Story
Infrastructure Energy

Centre Strengthens Cybersecurity Framework Across India’s Power Sector

The POWERGRID Centre of Excellence (CoE) in Cybersecurity has been established at the Indian Institute of Science (IISc), Bengaluru to advance research and development in cybersecurity for power grid operations and transmission systems. The initiative is part of India’s broader effort to build a resilient and secure power ecosystem. To strengthen cyber readiness across the sector, the Central Electricity Authority (CEA) issued the Cyber Security in Power Sector Guidelines, 2021, creating a comprehensive cyber assurance framework and governance structure for all power entities. Further, the ..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Open In App