AMC Auctions Four Plots, Earns Rs.236 Crore
Real Estate

AMC Auctions Four Plots, Earns Rs.236 Crore

The Ahmedabad Municipal Corporation (AMC) recently held an auction for 13 plots, managing to sell four while achieving remarkable returns on each sale. The highlight of the auction was a 4,658 sq m plot in Bodakdev, initially priced at Rs.2.70 lakh per sq m, which sold for ?3.07 lakh per sq m. A company purchased the prime property for Rs.1.43 billion, far exceeding the base price.

In total, AMC generated Rs.2.36 billion from the sale of the four plots, surpassing the base price of ?1.95 billion by more than Rs.400 million. Among other significant sales, a 5,741 sq m plot in Nikol sold for ?860 million, and a 963 sq m plot in Motera fetched ?151 million. Additionally, a plot in Makarba, sized at 3,799 sq m, was auctioned for Rs.285 million at Rs.75,000 per sq m.

Approval for the sales will be finalized at the standing committee meeting.

The Ahmedabad Municipal Corporation (AMC) recently held an auction for 13 plots, managing to sell four while achieving remarkable returns on each sale. The highlight of the auction was a 4,658 sq m plot in Bodakdev, initially priced at Rs.2.70 lakh per sq m, which sold for ?3.07 lakh per sq m. A company purchased the prime property for Rs.1.43 billion, far exceeding the base price. In total, AMC generated Rs.2.36 billion from the sale of the four plots, surpassing the base price of ?1.95 billion by more than Rs.400 million. Among other significant sales, a 5,741 sq m plot in Nikol sold for ?860 million, and a 963 sq m plot in Motera fetched ?151 million. Additionally, a plot in Makarba, sized at 3,799 sq m, was auctioned for Rs.285 million at Rs.75,000 per sq m. Approval for the sales will be finalized at the standing committee meeting.

Next Story
Equipment

Handling concrete better

Efficiently handling the transportation and placement of concrete is essential to help maintain the quality of construction, meet project timelines by minimising downtimes, and reduce costs – by 5 to 15 per cent, according to Sandeep Jain, Director, Arkade Developers. CW explores what the efficient handling of concrete entails.Select wellFirst, a word on choosing the right equipment, such as a mixer with a capacity aligned to the volume required onsite, from Vaibhav Kulkarni, Concrete Expert. “An overly large mixer will increase the idle time (and cost), while one that ..

Next Story
Real Estate

Elevated floors!

Raised access flooring, also called false flooring, is a less common interiors feature than false ceilings, but it has as many uses – if not more.A raised floor is a modular panel installed above the structural floor. The space beneath the raised flooring is typically used to accommodate utilities such as electrical cables, plumbing and HVAC systems. And so, raised flooring is usually associated with buildings with heavy cabling and precise air distribution needs, such as data centres.That said, CW interacted with designers and architects and discovered that false flooring can come in handy ..

Next Story
Infrastructure Urban

The Variation Challenge

A variation or change in scope clause is defined in construction contracts to take care of situations arising from change in the defined scope of work. Such changes may arise due to factors such as additions or deletions in the scope of work, modifications in the type, grade or specifications of materials, alterations in specifications or drawings, and acts or omissions of other contractors. Further, ineffective planning, inadequate investigations or surveys and requests from the employer or those within the project’s area of influence can contribute to changes in the scope of work. Ext..

Advertisement

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement

Advertisement

Talk to us?