Karnataka Allocates Rs. 16 bn for Rural Infrastructure
ECONOMY & POLICY

Karnataka Allocates Rs. 16 bn for Rural Infrastructure

Karnataka has earmarked Rs. 16 bn for rural infrastructure development, covering about 15,000 km of rural roads and works at gram panchayat level. The programme includes the Chief Minister’s Rural Road Connectivity Scheme and the Chief Minister’s Rural Development Scheme, with Rs. 10 bn assigned to roads and Rs. 6 bn to infrastructure in panchayat areas.

Road works will include resurfacing, gravel-road development and drainage construction. Estimated spending will range from Rs. 3.8 mn to Rs. 7 mn per km, depending on the work involved. The government has also allocated Rs. 50 bn separately under the Pragathi Patha scheme.

The panchayat allocation will support drainage, drinking water facilities and other essential village infrastructure. Funds will be released after panchayats identify requirements and obtain approval from Deputy Commissioners. Priority will be given to severely damaged roads, long-pending projects and roads or bridges connected with court cases, Lokayukta proceedings or legislative committee matters.

Karnataka has 5,927 gram panchayats and 29,340 villages, while its rural road network measured 199,458.72 km under the 2019 District Rural Roads Plan. The government expects improved connectivity to help move agricultural produce to markets, reduce transport costs and improve access to educational and healthcare institutions. Officials also expect the programme to create employment in rural areas.

The state plans to distribute 1.5 mn residential sites, with 500,000 sites targeted in the first phase. About 9,000 acres has been identified, while the minimum plot size for poor families has been raised from 20x30 feet to 30x40 feet. The government will prioritise families without a house or residential site.

The wider programme includes upgrading 3,000 panchayat-level schools, beginning with 1,000 government schools through corporate social responsibility support. Officials have also been directed to repair defunct reverse osmosis plants and conduct monthly water-quality tests. More than 300 plants were previously established through personal contributions and trusts before several were transferred to gram panchayats.

Karnataka has earmarked Rs. 16 bn for rural infrastructure development, covering about 15,000 km of rural roads and works at gram panchayat level. The programme includes the Chief Minister’s Rural Road Connectivity Scheme and the Chief Minister’s Rural Development Scheme, with Rs. 10 bn assigned to roads and Rs. 6 bn to infrastructure in panchayat areas. Road works will include resurfacing, gravel-road development and drainage construction. Estimated spending will range from Rs. 3.8 mn to Rs. 7 mn per km, depending on the work involved. The government has also allocated Rs. 50 bn separately under the Pragathi Patha scheme. The panchayat allocation will support drainage, drinking water facilities and other essential village infrastructure. Funds will be released after panchayats identify requirements and obtain approval from Deputy Commissioners. Priority will be given to severely damaged roads, long-pending projects and roads or bridges connected with court cases, Lokayukta proceedings or legislative committee matters. Karnataka has 5,927 gram panchayats and 29,340 villages, while its rural road network measured 199,458.72 km under the 2019 District Rural Roads Plan. The government expects improved connectivity to help move agricultural produce to markets, reduce transport costs and improve access to educational and healthcare institutions. Officials also expect the programme to create employment in rural areas. The state plans to distribute 1.5 mn residential sites, with 500,000 sites targeted in the first phase. About 9,000 acres has been identified, while the minimum plot size for poor families has been raised from 20x30 feet to 30x40 feet. The government will prioritise families without a house or residential site. The wider programme includes upgrading 3,000 panchayat-level schools, beginning with 1,000 government schools through corporate social responsibility support. Officials have also been directed to repair defunct reverse osmosis plants and conduct monthly water-quality tests. More than 300 plants were previously established through personal contributions and trusts before several were transferred to gram panchayats.

Related Stories

Gold Stories

Next Story
Infrastructure Energy

DMRC Invites Bids for Solar-Linked BESS Power Procurement

Delhi Metro Rail Corporation (DMRC) has invited bids for renewable energy from an Inter-State Transmission System (ISTS)-connected generating plant combining a solar photovoltaic (PV) system with a co-located Battery Energy Storage System (BESS). The procurement will be conducted through competitive bidding followed by an e-reverse auction. The last date for submitting online bids is December 10, 2026, at 3 PM. DMRC will open the technical bids on December 11, 2026, at 3 PM. The opening of financial bids and the e-reverse auction will be scheduled after completion of the technical evaluation. ..

Next Story
Infrastructure Energy

Solar Growth May Slow Beyond FY28 on Awards, Grid Constraints

India’s solar capacity growth could face headwinds beyond FY28 as slower renewable energy project awards, delays in signing power agreements and transmission constraints threaten expansion, according to a report by Yes Securities. Near-term additions remain supported by a construction pipeline exceeding 150 GW and rising rooftop installations, but weaker award activity could affect capacity additions and industry volumes in FY29 and FY30. Solar capacity additions nearly doubled to 44.61 GW in FY26 from 23.83 GW in FY25. Installations remained strong in the first half of FY27, when 21 GW of s..

Next Story
Infrastructure Transport

India’s First High-Speed Rail Service to Begin in 2027

India’s first high-speed rail service will commence in 2027, with the Surat-Vapi section of the Mumbai-Ahmedabad High-Speed Rail corridor scheduled to open first, Railway Minister Ashwini Vaishnaw said. The remaining sections to Mumbai will be opened in phases. Vaishnaw said 456 km of pier work and 371 km of viaduct construction had been completed by September. About 600,000 noise barriers had been installed along a 299 km stretch, while 9,300 overhead equipment masts had been erected across a 206 km viaduct. Four mountain tunnels have been excavated, and 5 km of the 21 km Maharashtra tunnel..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

SPECIAL OFFER
QR Code