Cabinet Clears Widening Of NH-63 And NH-563 In Telangana
ROADS & HIGHWAYS

Cabinet Clears Widening Of NH-63 And NH-563 In Telangana

The Cabinet Committee on Economic Affairs, chaired by the Prime Minister, approved the widening of the Armoor?Jagtial?Mancherial section of National Highway 63 on the Hybrid Annuity Model and the Jagtial?Karimnagar section of National Highway 563 on Build?Operate?Transfer (Toll) to the four?lane standard under three work packages. The combined project length is 190.76 km and the combined capital cost is Rs 75,971.6 mn. The decision aims to address severe congestion and improve long distance connectivity in the State of Telangana.

The Armoor?Jagtial?Mancherial corridor passes through the districts of Nizamabad, Jagtial and Mancherial and currently faces heavy congestion in built?up areas including Anksapoor, Korutla, Jagtial, Dharmapuri, Lakshettipet and Mancherial. The Jagtial?Karimnagar section traverses densely occupied localities such as Jagtial, Potharam, Gangadhara and Karimnagar. The works combine brownfield widening and greenfield alignments to streamline traffic flow.

The projects are to be delivered with four lanes and bypasses around populated stretches, open tolling and a design speed of 100 km/hour to improve travel efficiency across Nizamabad, Jagtial, Mancherial and Karimnagar. They are aligned with the PM GatiShakti framework and are intended to connect five economic nodes, seven social nodes and 10 logistic nodes, thereby supporting freight movement and regional development. The Cabinet noted that these interventions should positively influence the country’s Logistic Performance Index.

Upon completion travel time is expected to reduce by about one hour and 30 minutes between Armoor and Mancherial and by about 45 minutes between Jagtial and Karimnagar while offering safer and faster connectivity for passenger and freight traffic. The projects are projected to yield substantial reductions in fuel consumption, carbon emissions and vehicle operating costs and to generate about 3.443 mn man?days of direct employment and about 4.27 mn man?days of indirect employment. The total capital cost is split across packages with Rs 24,717.6 mn, Rs 27,307.2 mn and Rs 23,946.8 mn respectively for the Armoor?Jagtial, Jagtial?Mancherial and Jagtial?Karimnagar sections.

The Cabinet Committee on Economic Affairs, chaired by the Prime Minister, approved the widening of the Armoor?Jagtial?Mancherial section of National Highway 63 on the Hybrid Annuity Model and the Jagtial?Karimnagar section of National Highway 563 on Build?Operate?Transfer (Toll) to the four?lane standard under three work packages. The combined project length is 190.76 km and the combined capital cost is Rs 75,971.6 mn. The decision aims to address severe congestion and improve long distance connectivity in the State of Telangana. The Armoor?Jagtial?Mancherial corridor passes through the districts of Nizamabad, Jagtial and Mancherial and currently faces heavy congestion in built?up areas including Anksapoor, Korutla, Jagtial, Dharmapuri, Lakshettipet and Mancherial. The Jagtial?Karimnagar section traverses densely occupied localities such as Jagtial, Potharam, Gangadhara and Karimnagar. The works combine brownfield widening and greenfield alignments to streamline traffic flow. The projects are to be delivered with four lanes and bypasses around populated stretches, open tolling and a design speed of 100 km/hour to improve travel efficiency across Nizamabad, Jagtial, Mancherial and Karimnagar. They are aligned with the PM GatiShakti framework and are intended to connect five economic nodes, seven social nodes and 10 logistic nodes, thereby supporting freight movement and regional development. The Cabinet noted that these interventions should positively influence the country’s Logistic Performance Index. Upon completion travel time is expected to reduce by about one hour and 30 minutes between Armoor and Mancherial and by about 45 minutes between Jagtial and Karimnagar while offering safer and faster connectivity for passenger and freight traffic. The projects are projected to yield substantial reductions in fuel consumption, carbon emissions and vehicle operating costs and to generate about 3.443 mn man?days of direct employment and about 4.27 mn man?days of indirect employment. The total capital cost is split across packages with Rs 24,717.6 mn, Rs 27,307.2 mn and Rs 23,946.8 mn respectively for the Armoor?Jagtial, Jagtial?Mancherial and Jagtial?Karimnagar sections.

Next Story
Infrastructure Urban

Cabinet Approves Two Year Scheme To Replace Old Trucks And Buses

The Union Cabinet, chaired by the Prime Minister, approved a two-year scheme to reduce air pollution in the Delhi–NCR region and promote cleaner mobility. The programme will be funded through the National Capital Region Planning Board under the Ministry of Housing and Urban Affairs and implemented by the Ministry of Road Transport and Highways and the Ministry of Petroleum and Natural Gas, with participating States and Union Territories of Delhi, Haryana, Rajasthan and Uttar Pradesh. The total financial outlay has been set at Rs 95.85 billion (bn), with the Central Government contributing Rs..

Next Story
Infrastructure Transport

Bengaluru Suburban Rail And Metro To Share 500-Metre Corridor

Bengaluru suburban rail and the Metro will share a 500-metre corridor at Benniganahalli, a decision that planners say will reduce capital expenditure and urban disruption. The consolidation of alignments across the short stretch is intended to avoid duplication of elevated structures and station facilities while cutting land acquisition needs. Authorities put the maximum savings at Rs 1.69 bn (1,690 mn). The arrangement also aims to streamline construction interfaces between the two systems. The shared corridor will require coordinated design of track beds, piers and passenger access so that s..

Next Story
Infrastructure Urban

DRDO And IAF Complete Successful RudraM-II Flight Tests

The Defence Research and Development Organisation (DRDO) and the Indian Air Force (IAF) have conducted successful flight tests of the RudraM-II air-to-surface missile from an airborne platform. The trials were carried out under extreme release conditions with a critical trajectory that established the capability of all subsystems. The series of releases tested the missile's guidance, seeker and propulsion elements in an operationally representative environment. The missiles, released from the aircraft, were guided to a predefined target with pinpoint accuracy and all test objectives were fully..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement