CIDCO invites bids for road & drain works for NMIA
ROADS & HIGHWAYS

CIDCO invites bids for road & drain works for NMIA

CIDCO of Maharashtra Limited through the process of E-tendering invites “ONLINE” item rate percentage Bids in two bid systems (Part-I Technical Bid & Part-II commercial bid) in Road works and S.W. Drainworks for the work mentioned below:

Scope of work:
Construction of 60.0 m. wide Northern and 30.0 m. wide eastern Road up to 1st stage asphalting along with S.W. Drains for Navi Mumbai International Airport (NMIA) Project.

Bidders are requested to upload their pre-bid queries online on e-mail I.D. ee.ap6@cidcoindia.com from 19.05.2023 to 29.05.2023 and the reply to these queries will be given online on 05.06.2023 as a Corrigendum.

Bidders are required to submit a Tender Processing Fee of Rs.59,000/- (Rupees Fifty Nine Thousand only) (including 18% GST (Non- Refundable)) to be paid via online Payment Gateway mode only. The information on the E-Payment Gateway is available on E-Tendering Website http://mahatenders.gov.in

The tender seeks civil works of Rs 86,10,50,204 to be completed in 730 days. As per the tender, the bid validity will be 120 days, and it will be an open bidding process. The bid submission period began on May 18, 2023, and will end on June 12, 2023.

The complete BID document can be viewed/downloaded from the official portal of https://mahatenders.gov.in/nicgep/app

Essential details:

Project Estimated Value: ₹ 86,10,50,204
Product Category: Civil Works
Bid Validity (Days): 120
Period of Work: 730 days
Tender ID - 2023_CIDCO_905586_1
Tender Ref. No.: CANO01/CIDCO/EE(AP-VI)/23-24
Payment mode: Online
Form of contract: Percentage

CIDCO of Maharashtra Limited through the process of E-tendering invites “ONLINE” item rate percentage Bids in two bid systems (Part-I Technical Bid & Part-II commercial bid) in Road works and S.W. Drainworks for the work mentioned below: Scope of work: Construction of 60.0 m. wide Northern and 30.0 m. wide eastern Road up to 1st stage asphalting along with S.W. Drains for Navi Mumbai International Airport (NMIA) Project. Bidders are requested to upload their pre-bid queries online on e-mail I.D. ee.ap6@cidcoindia.com from 19.05.2023 to 29.05.2023 and the reply to these queries will be given online on 05.06.2023 as a Corrigendum. Bidders are required to submit a Tender Processing Fee of Rs.59,000/- (Rupees Fifty Nine Thousand only) (including 18% GST (Non- Refundable)) to be paid via online Payment Gateway mode only. The information on the E-Payment Gateway is available on E-Tendering Website http://mahatenders.gov.in The tender seeks civil works of Rs 86,10,50,204 to be completed in 730 days. As per the tender, the bid validity will be 120 days, and it will be an open bidding process. The bid submission period began on May 18, 2023, and will end on June 12, 2023. The complete BID document can be viewed/downloaded from the official portal of https://mahatenders.gov.in/nicgep/app Essential details: Project Estimated Value: ₹ 86,10,50,204 Product Category: Civil Works Bid Validity (Days): 120 Period of Work: 730 days Tender ID - 2023_CIDCO_905586_1 Tender Ref. No.: CANO01/CIDCO/EE(AP-VI)/23-24 Payment mode: Online Form of contract: Percentage

Next Story
Infrastructure Urban

AI Data Centre Leaders Map India’s Infrastructure Roadmap

Mumbai, 22 July 2026: As artificial intelligence reshapes global digital infrastructure, industry leaders gathered in Mumbai today at the AI-Powered Data Centre Conference 2026 to discuss how India can build the capacity, technology and ecosystem required to emerge as a global AI infrastructure hub. Organised by ASAPP Info Global Group and conceptualised by FIRST Construction Council, the conference revolved around the theme, “From Capacity Gap to AI Superpower: Building India's Digital Backbone for the Intelligence Economy.” Bringing together developers, technology providers, enterpr..

Next Story
Infrastructure Urban

SCLR Extension Nears Completion Linking BKC With Signal-Free Route

The Santacruz-Chembur Link Road (SCLR) extension towards Bandra-Kurla Complex (BKC) via the Mumbai University campus has entered its final stage, bringing motorists closer to a direct, signal-free connection between the Western Express Highway and the city’s commercial district. The elevated connector is being built as an arm from the SCLR alignment and will link the western suburbs with BKC without surface signals. The link is designed to reduce journey times for commuters travelling from the western suburbs to BKC and to improve access to eastern Mumbai. By carrying through traffic above s..

Next Story
Infrastructure Transport

Raiganj MP Seeks Bengal Only Highway Link To Siliguri

Raiganj Member of Parliament Kartik Chandra Paul met Union Minister for Road Transport and Highways Nitin Gadkari in New Delhi to press for a new stretch of national highway in North Dinajpur district. He urged approval for a Bengal-to-Bengal link that would connect National Highways 12 and 27 to allow vehicles bound for Siliguri to avoid the current route through Kishanganj in neighbouring Bihar. He also submitted a proposed alignment of the new road to the ministry for consideration. At present vehicles from Raiganj travel along NH-12 and join NH-27 at Purnia More in Dalkhola, a route that p..

Advertisement

Subscribe to Our Newsletter

Get daily newsletters around different themes from Construction world.

STAY CONNECTED

Advertisement

Advertisement

Advertisement